Control Room Emergency Ventilation Air Supply
From kanterella
Jump to navigation
Jump to search
Control Room Emergency Ventilation Air Supply (CREVAS)
See also:
Control Room Habitability
v
t
e
System
Automatic Depressurization System
Auxiliary Building Gas Treatment System
Auxiliary Feedwater
Circulating Water System
Containment Spray
Control Rod
Control Room Emergency Air Temperature Control System
Control Room Emergency Filtration System
Control Room Emergency Ventilation
Control Room Emergency Ventilation Air Supply
Control Room Envelope
Core Spray
Core Standby Cooling System
Cresent Area Ventilation and Cooling
Critical Function Monitoring System
Decay Heat Removal
Drywell Continuous Atmospheric Monitor
Emergency Cooling Tower
Emergency Core Cooling System
Emergency Diesel Generator
Emergency Equipment Cooling Water
Emergency Feedwater Actuation System
Emergency Feedwater Initiation and Control
Emergency Feedwater System
Emergency Gas Treatment System
Emergency Response Data System
Extraction steam
Feedwater
Fuel Pool Cooling and Cleanup
HVAC
High Pressure Coolant Injection
High Pressure Core Spray
Intermediate Range Monitor
Low Pressure Coolant Injection
Low Pressure Cooling Injection
Main Condenser
Main Steam
Main Steam Isolation Valve
Main Steam Line
Main Steam Safety Valve
Main Transformer
Main Turbine
Main Turbine Bypass System
Mechanical Pressure Regulator
Moisture Separator Reheater
Permanent Magnet Generator
Post Accident Monitoring
Primary Containment Isolation System
Primary containment
Qualified Safety Parameter Display System
[ENS]
|
[LER]
|
[Findings]
Site
Start date
Title
Description
ML24207A019
FitzPatrick
9 October 2024
SE Addendum Related to the License Amendment No. 338 for Implementation of the Alternative Source Term (DPO-2021-001)
ML24165A038
FitzPatrick
4 September 2024
Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis
JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis
FitzPatrick
29 July 2024
Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis
IR 05000333/2024001
FitzPatrick
9 May 2024
Integrated Inspection Report 05000333/2024001
ML24085A236
FitzPatrick
25 March 2024
Response to Request for Additional Information
ML23110A253
Peach Bottom
10 April 2023
9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Sections 1 Thru 8
ML21181A057
FitzPatrick
4 November 2021
Issuance of Amendment No. 344 Adoption of TSTF-545
IR 05000333/2021002
FitzPatrick
3 August 2021
James A. Fitpatrick Nuclear Power Plant - Integrated Inspection Report 05000333/2021002
IR 05000333/2021001
FitzPatrick
5 May 2021
Integrated Inspection Report 05000333/2021001
ML21109A103
Peach Bottom
8 April 2021
8 to Updated Final Safety Analysis Report, Chapter 13, Sections 1 Through 8
... further results
Category
:
System
Navigation menu
Personal tools
Create account
Log in
Namespaces
Page
Discussion
English
Views
Read
View source
View history
More
Search
Navigation
Main page
Recent changes
Random page
Community
Help
Patreon
Databases
ENS
LER
Findings
Inspections
TSTF
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
Browse properties