Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04
ML20083M808
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/12/1995
From: William Cahill
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20083M811 List:
References
GL-91-04, GL-91-4, NUDOCS 9505220073
Download: ML20083M808 (2)


Text

"

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION in the matter of )

NEW YORK POWER AUTHORITY ) Docket No. 50-333 James A. FitzPatrick Nuclear Power Plant )

AP_P_LICATION_ EOR _AMENDRENIlO_QEEBAIlliG_LLCENSE The New York Power Authority requests an amendment to the Technical Specifications contained in Appendix A to Facility Operating Ucense No. DPR-59 for the James A.

FitzPatrick Nuclear Power Plant. This application is filed in accordance with Section 10 CFR 50.90 of the Nuclear Regulatory Commission's regulations.

This application for an amendment to the James A. FitzPatrick Nuclear Power Plant Technical Specifications proposes to extend the surveillance test intervals for the emergency service water system to support 24 month operating cycles. The proposed changes follow the guidance of Generic Letter 91-04. Approval of these changes will eliminate the need to schedule mid-cycle outages to conduct these surveillance tests.

Surveillance test interval extensions that are justified will be denoted as being performed "every 24 months" or "at least once per 24 months" consistent with the guidance provided in NRC Generic Letter 91-04. Other surveillances currently performed "once each operating cycle," "at least once during each operating cycle," "each refueling," or similar notation, that are not being extended at this time will be denoted as being performed "at least once per 18 months."

The signed original of the Application for Amendment to the Technical Specifications is enclosed for filing. Attachments I and lil to this application contain the proposed changes to the Technical Specifications, and a mark-up of the current Technical Specification pages. Attachment 11 contains the associated Safety Evaluation for the emergency service water system.

New York Power Authority William J. Cahill, Jr.

Chief Nuclear Officer STATE OF NEW YORK E8 BIS.040NNOR COUNTY OF WESTCHESTER WTgdN8N Subscribed and swom to before me ommunesen weenshesear 1995. Comuniesten egeresJanuary21, , g this /gday of M . ,

[

ado e ~. A. " W Notary Public/

1 9505220073 950512 ^

PDR ADOCK 05000333 P PDR

ATTACHMENT I to JPN-95-025 Proposed Changes to Technical Specification Emergency Service Water System Surveillance Test intervals to Accommodate 24-MonttLOpstating_ Cycles (JPTS-95-001E)

New York Power Authority JAMES A. FITZPATRICK NUCLEAR PUu.51 PLAN, Docket No. 50-333 DPR-59