Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
JAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected | 14 October 1999 | Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected | Hydrostatic |
JAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation | 14 October 1999 | Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation | |
ML20216J832 | 29 September 1999 | Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer | |
ML20196F593 | 22 June 1999 | Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend | Hydrostatic |
ML20195B874 | 1 June 1999 | Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 | |
ML20206U135 | 19 May 1999 | Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys | |
ML20205K104 | 5 April 1999 | Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing | Fire Protection Program |
ML20205D827 | 26 March 1999 | Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 | Shutdown Margin High Radiation Area Ultimate heat sink Post Accident Monitoring Hydrostatic Scram Discharge Volume |
ML20199H351 | 15 January 1999 | Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 | |
JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld | 3 December 1998 | Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld | |
ML20236X781 | 3 August 1998 | Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 | Safety Limit Minimum Critical Power Ratio Fuel cladding |
ML20236M615 | 10 July 1998 | Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process | |
ML20236L274 | 6 July 1998 | Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys | |
ML20249B155 | 16 June 1998 | Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 | |
ML20217K036 | 30 March 1998 | Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 | |
ML20247F779 | 26 February 1998 | Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite | |
ML20202G855 | 6 February 1998 | Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels | Reactor Vessel Water Level |
ML20202D539 | 6 February 1998 | Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode | Hydrostatic |
ML20202D388 | 6 February 1998 | Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads | |
ML20203J667 | 12 December 1997 | Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions | |
ML20217H980 | 14 October 1997 | Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles | |
ML20217G299 | 8 October 1997 | Application for Amend to License DPR-59,reflecting Change in LCO | |
ML20140D801 | 14 April 1997 | Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 | |
ML20135B187 | 26 November 1996 | Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents | |
ML20115G058 | 12 July 1996 | Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit | Safety Limit Minimum Critical Power Ratio Fuel cladding Fire Protection Program |
ML20113B626 | 20 June 1996 | Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant | |
ML20112D566 | 30 May 1996 | Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements | |
ML20112D150 | 30 May 1996 | Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis | |
ML20112D267 | 30 May 1996 | Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure | |
ML20112B641 | 16 May 1996 | Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B | Safe Shutdown Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20108D115 | 24 April 1996 | Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day | |
ML20107M446 | 24 April 1996 | Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure | |
ML20101H667 | 27 March 1996 | Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day | |
ML20101F831 | 22 March 1996 | Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability | |
ML20101H367 | 22 March 1996 | Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements | |
ML20097A192 | 1 February 1996 | Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode | Hydrostatic |
ML20100C291 | 25 January 1996 | Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs | |
ML20097J666 | 25 January 1996 | Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle | |
ML20095F705 | 14 December 1995 | Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code | |
JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles | 30 November 1995 | Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles | |
ML20094B647 | 25 October 1995 | Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles | |
ML20092H534 | 15 September 1995 | Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles | |
ML20086P642 | 21 July 1995 | Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements | High Radiation Area Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20085G356 | 15 June 1995 | Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles | |
ML20083M808 | 12 May 1995 | Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 | |
JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles | 12 April 1995 | Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles | |
JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles | 2 March 1995 | Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles | |
JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation | 22 February 1995 | Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation | Reactor Vessel Water Level |
JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities | 2 December 1994 | Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities | |
ML20076F463 | 7 October 1994 | Application for Amend to License DPR-59,changing TS Re Safety/Relief Valve Testing Requirements |