MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program ML20154E5121988-05-0909 May 1988 Requests That Zip Code for Judge Es Bowers Address Be Changed as Stated,Per Iw Smith Request.Related Correspondence ML20153E3031988-05-0303 May 1988 Forwards NRR Input to Status of Regulatory Activities at Plants,In Response to J Curtis Request for Info ML20153E3381988-04-21021 April 1988 Requests Input on Status of Regulatory Activities for Listed Plants,Status of EPRI Research for RES & Status of California Low Level Waste Program.Response Requested by 880505 ML20151D4271988-03-24024 March 1988 Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda ML20148G2281988-03-22022 March 1988 Advises That Time for Commission to Review Naslap Decision (ALAB-880) Expired.Commission Declined Review.Decision Became Final Agency Action on 880318.Served on 880323 ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20236R7551987-11-20020 November 1987 Informs That Time Provided by NRC Regulations within Which Commission May Act to Review ALAB-877 Expired.Commission Declined Review.Decision Became Final Agency Action on 871117.Served on 871120 ML20236N8421987-11-12012 November 1987 Documents Reconstitution of Aslab for OL Amend Proceeding to Consist of as Rosenthal,Cn Kohl & Ha Wilber.Related Correspondence ML20236H2821987-10-30030 October 1987 Informs That Time Provided within Which Commission May Act to Review ALAB-873 Expired.Commission Declined Review. Decision Became Final Agency Action on 871028.Served on 871102 ML20235H6291987-09-25025 September 1987 Informs of Reconstitution of Aslab Consisting of Author as Chairman & TS Moore & Ha Wilber as Members ML20234F3831987-09-14014 September 1987 Documents Results of Exam of Bolted Connections of Raceway Supports at Plant.Exam Conducted Due to Allegations Received Re Adequacy of Anchor Bolts Securing Raceway Supports to Concrete ML20238A6481987-08-17017 August 1987 Forwards Page 7 of 870813 Pleading Entitled, Response of NRC Staff to Licensing Board Order of 870732 (Directing Parties to File Comments on Applicability of Appeal Boards Decision...), Which Was Inadvertently Omitted ML20195F8261987-08-0707 August 1987 Forwards Listed Data Tables for Use in Preparing Performance Analyses for Plant,Per DF Kirsch 870728 Memo.Salp Performance Analyses Should Be Submitted to J Burdoin by 870825 ML20235M1861987-07-13013 July 1987 Forwards Complete Footnote 5 as Appearing on Pages 8 & 9 of 870710 Answer to Sierra Club Motion to Admit Contention Re Generic Issue 82 & to Direct Preparation of Eis. Due to Quirk in Programming,Not All of Footnote 5 Printed ML20235G5441987-07-0808 July 1987 Forwards NRC Staff Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Re Licensee Amend Request to Expand Spent Fuel Pools at Plant ML20234F5101987-07-0606 July 1987 Informs of Large Number of Limited Appearance Statements Filed in Proceeding.Documents Will Not Be Served,Per Board Chairman Discussions.Documents Will Be Made Part of Official Record & Will Be Available for Insp.Served on 870706 ML20216D0931987-06-22022 June 1987 Forwards Transcript Pages 65-68 of J Mcdermott Limited Appearance Statement on 870615 Re Defective Weld at Plant Approved by QC Inspector for Appropriate Action.Served on 870624 ML20214W5681987-06-0505 June 1987 Forwards List of Exhibits Intended to Be Offered by Sierra Club in Upcoming Hearing in Proceeding Re Spent Fuel Pool. List Received Too Late for Inclusion in to ASLB ML20214T2031987-06-0505 June 1987 Forwards NRC Staff Disk in Ascii Form,Containing Staff Testimony & Draft Proposed Findings of Fact & Conclusions of Law,Per ASLB 870522 Memorandum & Order.Requests Database Compiled by ASLB Be Provided on Encl Blank Disks ML20214T1581987-06-0404 June 1987 Forwards NRC Staff Testimony of Hg Ashar,Hm Fishman,G Degrassi,Wl Brooks & a Singn on Sierra Club Contentions I(A)3 & 4;I(B)2,8 & 9;II(A)1-9 & II(B)1-9 & Dp Cleary on Sierra Club Contention I(B)7,per ASLB 870128 & 0409 Orders ML20214T2251987-06-0303 June 1987 Confirms 870602 Telcon Informing ASLB of Staff Intention to Offer Listed Documents as Staff Exhibits in Upcoming Hearing on Spent Fuel Pool ML20195G2301987-06-0202 June 1987 Discusses Plans for Response to Lessons Learned from Plant 870410 Loss of RHR Event.Crgr Review of 50.54(f) Ltr Providing Addl Info Requested at Earliest Opportunity ML20149M6491987-05-29029 May 1987 Forwards Proposed 10CFR50.54(f) Ltr Currently Being Reviewed for Transmittal to CRGR on 870602.Comments,if Necessary, Requested by 870601 ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B1911987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl IA-87-714, Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl1987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl ML20214A5501987-05-14014 May 1987 Partially Deleted Memo Re Recommendation for Diablo Canyon Board Notification Concerning 831019 Allegations ML20214A0311987-05-12012 May 1987 Notifies of 870514 Briefing on Licensing & Operational Status of Plants Assigned to Project Directorate V,Including Diablo Canyon,Palo Verde,Rancho Seco,San Onfore,Trojan & WPPSS 2 ML20215H9221987-05-0707 May 1987 Submits Results of Lll Exam of Facility Raceway Support Bolted Connections.Exams Conducted Due to Allegations Re Adequacy of Anchor Bolts & Feedback from Lll That Adequacy of Bolting Might Be Safety Issue 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20196D7021999-06-25025 June 1999 Informs That Reactor Sys Branch Prepared Suppl 1 to GL 83-11 Re Licensee Qualification for Performing Safety Analyses, Which Was Issued on 990624.Matl Related to Subj GL Should Be Placed in PDR & Made Available to Public DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205J2811999-04-0606 April 1999 Notification of 990422 Meeting for Dockets 7200026 & 7200027 with PG&E in Rockville,Md to Dicuss PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon IR 05000275/19993011999-03-25025 March 1999 Forwards NRC Operator Licensing Exam Repts 50-275/99-301 & 50-323/99-301 for Tests Administered on 990125-28 ML20205B2301999-03-25025 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990125-28 ML20207M3401999-03-0202 March 1999 Notification of Canceled Meeting Scheduled for 990309 Re 7200026 & 7200027 for PG&E Plans for Dry Cask Storage at Humboldt Bay & Diablo Canyon ML20155H9051998-11-0303 November 1998 Notification of 981117 Meeting for Dockets 7200026 & 7200027 with Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage ML20248K4451998-06-0202 June 1998 Notification of 980617 Meeting W/Util in Rockville,Md to Discuss PG&E Plans for Dry Cask Storage.Meeting Agenda Encl ML20247G9081998-04-0707 April 1998 Discusses Experts Needed for Plant Life Extension Cases,Per 980403 Discussion ML20136C1031997-03-0606 March 1997 Forwards Correspondence Transmitted Via Internet to J Zwolinski from P Blanch During 970102-31.Requests Correspondence Be Placed in PDR ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20134B5061994-04-13013 April 1994 Submits Plants Which Will Be Discussed in Categories Indicated Re Results of Screening Meetings for June 1994. Partially Deleted ML20057A9941993-09-14014 September 1993 Forwards NRC Proposed Transcript Corrections ML20056E5141993-08-12012 August 1993 Submits SALP Schedule for FY94 Per Mgt Directive 8.6 ML20127P4161993-01-19019 January 1993 Provides Summary of 930113 Operators Reactors Events Briefing.List of Attendees & Viewgraphs of Elements Discussed Encl ML20126F0201992-12-16016 December 1992 Discusses Discrepancies in Svcs Rendered for 3rd & 4th Quarters of 1991 & 1st,2nd & 3rd Quarters of 1992.TLD Program for Humbolt Bay Site Did Not Strictly Follow Ltr of Contract ML20127D4321992-09-0101 September 1992 Forwards 920818 Petition Submitted by N Culver on Behalf of San Luis Obispo Mothers for Peace,Filed in Response to NRC Notice of Issuance of Amend to Licenses for Plant,Extending Expiration Date from 080423 to 210922 ML20058P5021990-08-15015 August 1990 Forwards Three Analyses of Shutdown Events Evaluated by Accident Sequence Precursor Program ML20247M1881989-05-26026 May 1989 Notification of 890613,14 & 15 Meetings W/Util in San Francisco,Ca to Discuss PRA Topics Re NRC Questions on long-term Seismic Program NUREG-1353, Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-13531989-05-0202 May 1989 Board Notification 89-003:forwards Listed Documents Re Spent Fuel Pool Accidents for Resolution of Generic Issue 82, Beyond DBA in Spent Fuel Pools, Including NUREG-1353 NUREG/CR-5176, Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants1989-02-14014 February 1989 Updated Board Notification 89-01 Re Lll NUREG/CR-5176, Seismic Failure & Cask Drop Analyses of Spent Fuel Pools at Two Representative Nuclear Power Plants ML20154E5121988-05-0909 May 1988 Requests That Zip Code for Judge Es Bowers Address Be Changed as Stated,Per Iw Smith Request.Related Correspondence ML20153E3031988-05-0303 May 1988 Forwards NRR Input to Status of Regulatory Activities at Plants,In Response to J Curtis Request for Info ML20153E3381988-04-21021 April 1988 Requests Input on Status of Regulatory Activities for Listed Plants,Status of EPRI Research for RES & Status of California Low Level Waste Program.Response Requested by 880505 ML20151D4271988-03-24024 March 1988 Submits Summary of Actions Discussed at ACRS 335th Meeting on 880310-12 in Washington,Dc,Including ACRS Repts/ Recommendations,Other Actions,Agreements,Assignments & Requests & Future Agenda ML20148G2281988-03-22022 March 1988 Advises That Time for Commission to Review Naslap Decision (ALAB-880) Expired.Commission Declined Review.Decision Became Final Agency Action on 880318.Served on 880323 ML20148D9491988-03-15015 March 1988 Discusses 880315 Operating Reactors Events Meeting 88-11. List of Attendees,Events Discussed & Tabulation of long-term Followup Assignments Detailed in Encls ML20236Y1501987-12-0707 December 1987 Staff Requirements Memo Re 871125 Affirmation/Discussion & Vote.Commission Approved Order Directing Aslab to Issue Decision by 880131 Re Installation of high-density Spent Fuel Racks & Order Vacating Stay for Low Power Operations ML20236R7551987-11-20020 November 1987 Informs That Time Provided by NRC Regulations within Which Commission May Act to Review ALAB-877 Expired.Commission Declined Review.Decision Became Final Agency Action on 871117.Served on 871120 ML20236N8421987-11-12012 November 1987 Documents Reconstitution of Aslab for OL Amend Proceeding to Consist of as Rosenthal,Cn Kohl & Ha Wilber.Related Correspondence ML20236H2821987-10-30030 October 1987 Informs That Time Provided within Which Commission May Act to Review ALAB-873 Expired.Commission Declined Review. Decision Became Final Agency Action on 871028.Served on 871102 ML20235H6291987-09-25025 September 1987 Informs of Reconstitution of Aslab Consisting of Author as Chairman & TS Moore & Ha Wilber as Members ML20234F3831987-09-14014 September 1987 Documents Results of Exam of Bolted Connections of Raceway Supports at Plant.Exam Conducted Due to Allegations Received Re Adequacy of Anchor Bolts Securing Raceway Supports to Concrete ML20238A6481987-08-17017 August 1987 Forwards Page 7 of 870813 Pleading Entitled, Response of NRC Staff to Licensing Board Order of 870732 (Directing Parties to File Comments on Applicability of Appeal Boards Decision...), Which Was Inadvertently Omitted ML20195F8261987-08-0707 August 1987 Forwards Listed Data Tables for Use in Preparing Performance Analyses for Plant,Per DF Kirsch 870728 Memo.Salp Performance Analyses Should Be Submitted to J Burdoin by 870825 ML20235M1861987-07-13013 July 1987 Forwards Complete Footnote 5 as Appearing on Pages 8 & 9 of 870710 Answer to Sierra Club Motion to Admit Contention Re Generic Issue 82 & to Direct Preparation of Eis. Due to Quirk in Programming,Not All of Footnote 5 Printed ML20235G5441987-07-0808 July 1987 Forwards NRC Staff Proposed Findings of Fact & Conclusions of Law in Form of Initial Decision Re Licensee Amend Request to Expand Spent Fuel Pools at Plant ML20234F5101987-07-0606 July 1987 Informs of Large Number of Limited Appearance Statements Filed in Proceeding.Documents Will Not Be Served,Per Board Chairman Discussions.Documents Will Be Made Part of Official Record & Will Be Available for Insp.Served on 870706 ML20216D0931987-06-22022 June 1987 Forwards Transcript Pages 65-68 of J Mcdermott Limited Appearance Statement on 870615 Re Defective Weld at Plant Approved by QC Inspector for Appropriate Action.Served on 870624 ML20214W5681987-06-0505 June 1987 Forwards List of Exhibits Intended to Be Offered by Sierra Club in Upcoming Hearing in Proceeding Re Spent Fuel Pool. List Received Too Late for Inclusion in to ASLB ML20214T2031987-06-0505 June 1987 Forwards NRC Staff Disk in Ascii Form,Containing Staff Testimony & Draft Proposed Findings of Fact & Conclusions of Law,Per ASLB 870522 Memorandum & Order.Requests Database Compiled by ASLB Be Provided on Encl Blank Disks ML20214T1581987-06-0404 June 1987 Forwards NRC Staff Testimony of Hg Ashar,Hm Fishman,G Degrassi,Wl Brooks & a Singn on Sierra Club Contentions I(A)3 & 4;I(B)2,8 & 9;II(A)1-9 & II(B)1-9 & Dp Cleary on Sierra Club Contention I(B)7,per ASLB 870128 & 0409 Orders ML20214T2251987-06-0303 June 1987 Confirms 870602 Telcon Informing ASLB of Staff Intention to Offer Listed Documents as Staff Exhibits in Upcoming Hearing on Spent Fuel Pool ML20195G2301987-06-0202 June 1987 Discusses Plans for Response to Lessons Learned from Plant 870410 Loss of RHR Event.Crgr Review of 50.54(f) Ltr Providing Addl Info Requested at Earliest Opportunity ML20149M6491987-05-29029 May 1987 Forwards Proposed 10CFR50.54(f) Ltr Currently Being Reviewed for Transmittal to CRGR on 870602.Comments,if Necessary, Requested by 870601 ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B1911987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl IA-87-714, Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl1987-05-18018 May 1987 Presents Composite Set of NRC & Industry Recommended Remedial Actions Based on 1985 AEOD Case Study Rept C503 Re DHR Problems for PWR Operation.Table 1 Presenting Chronology of 37 events,cost-benefit Analysis & Related Info Encl 1999-08-27
[Table view] |
Text
!
S .
4 {
e
/'p'a aseg%., UNITED STATES y , s., 'j NUCLEAR REGULATORY COMMISSION
{ w AsHIN 3 T ON. D.C. 20565 s,...../
OPPICE OF THE CommissioNem November 28, 1983 MEMORANDUM TO SAMUEL J. CHILK SECRETARY FROM: William J. Mannin
SUBJECT:
SECY-83-377 - REVIEW OF ALAB-728 (PACIFIC GAS AND ELECTRIC COMPANY)
Attached are Commissioner Gilinsky's separate views on SECY-83-377 (Review of ALAB-728). Please ensure that they are served on the parties and are placed in the Commission Issuances.
cc W. Reamer M. Cutchin P. Davis S. Sohinki PDR F01A HAMLIN87-444 8905090425 8dO418 poq
)'Q t
.J n l
11/28/83 SEPARATE VIEWS OF COMMISSIONER GILINSKY
( S*ACY- 8 3- 3 7 7 ; REVIEW OF ALAb-728, DIABLO CANYON) l I am disappointed that in the following three instances the ,
Commission has failed to rise above giving participants in i its proceedings the legal run-around.
- 1. The intervenors wanted to litigate the adequacy of the !
hydrogen control system, which is. supposed to protect l against the burning of the large quantities of hydrogen which might be generated during an accident. The Board !
l refused to hear this contention on the grounds that this event is "not credible" and that the intervenors had not surmounted the artificial barriers which the Commission has placed in the way of considering this issue.
l
! l l
I should make clear at the outset that hydrogen control is not an acute problem at Diablo Canyon. The containment building, unlike that of certain plants, has a sufficiently large volume and high design pressure to withstand a hydrogen burn. While the effects cf a hydrogen fire on the continued operability of safety equipment inside the ,
containment are not yet clear, the situation here is the same as at other plants and the question is being considered l
in a rulemaking.
i 1
1
~
I
, . . a a The problem in this case, as in prior cases where hydrogen control was a more significant safety issue, is that the Commission persists in pretending that the accident which actually occurred at TMI nearly five years ago is "not credible". The hydrogen control system required by NRC's pre-Three Mile Island regulations -- which are still in force -- is designed to cope with the small amount of hydrogen which was thought to de the maximum that could be generated in an accident. Pf contrast, it is estimated that during the 1979 Three Mile Island accident approximately ten times as much hydrogen as this maximum -- several hundred kilograms -- was in fact generated, released into the surrounding containment, and ignited.
In 1980, during the course of the proceeding on whether to perrait Three Mile Island Unit 1 to restart, the Licensing Board asked the Commission two questions: (1) whether the regulation on hydrogen control should be waived since a prima facie case had been made that hydrogen generation at TMI-2 was well in excess of the design basis of the TMI-l hydrogen control system; and, (2) whether post-accident hydrogen gas control should be an issue in the proceeding.
The Commission's response was that the issue could be litigated but, instead of waiving the discredited regulation, it required any party wishing to discuss the hydrogen control system to first demonstrate that (1) a "credible" loss-of-coolant accident could occur, (2) which
3 _ _ _ _ . . ._
would entail the generation of hydrogen, (3) which would burn or explode, (4) causing the breach or leaking of the containment, (5) which, in turn, would result in off-site radiation doses in excess of Part ' 00 guideline values. The purpose seems to have been to keep this issue from being pursued here and elsewhere.
It is interesting that the Commission, a majority of whose members have persistently denounced NRC's excessive legalism, has consistently followed this most legalistic of precedents. The Commission should get on with the substantive task of deciding whether the various containments designs are strong enough to withstand a large hydrogen burn, and whether the equipment in the containment meets whatever environmental qualification standard the Commission chooses, and forget about this being an "incredible" accident.
- 2. The second issue is what consideration should be given in emergency planning to the effects of earthquakes on emergency preparedness. When this issue was first raised in the San onofre operating license proceeding, the Commission quashed a quite limited inquiry into the problem by ruling that this issue was of such magnitude that it should be resolved in a "generic proceeding" rather than in case-by-case licensing reviews or hearings.
3 _ . . . ..
4 i .
Now the NRC staff say that they will not undertake such a generic proceeding because they think that the probability of an earthquake severe enough to disrupt emergency preparedness occurring simultaneously with, or causing, a reactor accident is too low to justify a regulation. They want to deal with the problem, which affects only reactors on the West Coast, by doing plant-specific reviews.
Nonetheless, the Appeal Board in Diablo Canyon followed the Commission's directives in San onofre and affirmed the l Licensing Board's decision to exclude the earthquake I
l contention.
l
- 3. The third area of concern has to do with the Commission's policy on considering Class 9 accidents. These !
most serious accidents dominate the risk posed by nuclear power plants, even taking into account their very low probability. Indeed, it is pointless to look at the environmental consequences of reactor accidents in environmental statements unless class 9 accidents are 1 i
considered.
Prior to the Three Mile Island accident, the Commission's
- position was that Class 9 accidents were so improbable that they did not need to be considered in balancing the costs and benefits of a plant. After the accident (which was, in l
' effect, a Class 9 accident), the Commission changed its i policy to require that such accidents be considered in cases
in which the final Environmental Impact Statement had not I yet been issued or, if the final EIS had been issued, in which "special circumstances" were shown to exist.
Since the Diablo Canyon final EIS had been issued before that change in policy, the controversy in this case was over.
whether "special circumstances" existed. The difficulty is l that, instead of deciding this dispute, the Licensing Board resorted to the argument that, because the Appeal Board had found that Diablo Canyon meets the NRC's seismic design I requirements, no special circumstances exist. Since no ,
plant will receive a license unless it is found to meet i NRC's requirements, the Licensing Board's approach amounts a
to defining away the "special circumstances" which might justify consideration of Class 9 accidents. This was not ;
]
the result intended by the Commission when it adopted the new policy.