=_.
o J.e}.. m.g'e
[
'f f,
UNITED STATES j.
NUCLEAR REGULATORY COMMISSION
{..
j REGION V 1480 MARIA LANE,sulTE 210 t,
,#g WALNUT CREEK. CALIFORNIA 94596 MEMORANDUM FOR:
T. W. Bishop, Director, Division of Resident, a
Reactor Projects and Engineering Programs i
THRU:
D. F. Kirsch, Chief, Reactor Projects 'Section No. 3 FROM:
P. J. Morrill, Reactor Inspector 1
SUBJECT:
INSPECTION RESULTS, LAWRENCE LIVERMORE NATIONAL 4
LABORATORY PERSONNEL EXAMINATION OF RACEWAY SUPPORT BOLTED CONNECTIONS AT DIABLO CANYON (DN 50-275 AND 50-323)
The purpose of this memorandum is to document the results of an examination of bolted connections of raceway supports at Diablo Canyon. This effort was conducted for two reasons; first, we have received allegations related to the l
adequcy of the anchor bolts which secure raceway supports to concerte (RV-83-A-033), and second, based on the feed-back I have been receiving from fL the Lawrence Livermore National Laboratory (contract) personnel, it appeared that adequacy of bolting of raceway supports might be a safety issue.
I requested the contract inspectors to tabulate and transmit to me the number of i
raceway supports examined, the number of bolts / nuts examined, and the number and type of deficiencies observed. This information was transmitted to me on November 8, 1983 and is current as of October 28, 1983.
i i
Raceway Supports Examined In Detail ---- 81 I
l Raceway Supports Partially Examined ---- estimated to be 200 to 300 Through Wall Anchor nuts / bolts ---- 10 to 20 examined:
One found deficient, item of non-compliance issued, licensee
' reinspected all similiar installations,10 out of several hundred j
(estimated) found lose and tightened.
Other Anchor nuts / bolts ---- 1,000 to 1,500 examined:
i Two were found loose, licensee tightened and documented with Minor Variation Reports (MVR)
Spring Nuts ---- 1,000 to 1,500 examined:
4 Four were found loose, licensee tightened and documented with NCRs j
1 8705070149 870505 PDR FOIA A
^
GARDE 84-21 PDR
{
/ S}
d',*-
I (u-1 o
T. W. Bishop 2-Conduit Nuts ---- 1,000 to 1,500 examined:
One was found loose, licensee tightened and documented with a MVR Lack of Thread Engagement ---- Several Thousand examined:
One lacked proper engagement, licensee corrected and documented with a MVR Based on this information, I recommend we continue to use our contract inspectors to examine raceway supports at the current level of effort. Should the licensee's deficiency rate decrease further however, I think we should examine some other area with potential problems.
I i
l W
l P. J. Morrill Reactor Inspector cc:
M. Mendonca, RV, Diablo Site l