Submits Design Verification Activities Per 841122 Request. Actions Taken in Past & Activities in Process or Scheduled Identified for Providing Assurance That Facility Designed in Accordance W/Fsar Commitments
ML20137J018
Person / Time
Site: Beaver Valley
Issue date: 01/17/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Thompson H
Office of Nuclear Reactor Regulation
References
2NRC-6-009, 2NRC-6-9, TAC-62939, NUDOCS 8601220203
Download: ML20137J018 (6)


Text

.

$VL

'A@

Duquesne Lidit Nuclear Construction Omsson Telecopy mar StsugO*l'is2Os" January 17, 1986 United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Mr. Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Design Verification Activities

References:

1) Duquesne Light Company Nuclear Construction Division Presen-tation to the Nuclear Regulatory Commission, Region I, King of Prussia, PA, dated October 21, 1983
2) NRC Region I SALP Audit, 50-334/84-13 and 50-412/84-06, dated May,1984 (Section 4-10)
3) NRC Region I Inspection Reports 50-412/84-14, dated October 31, 1984 and 50-412/85-21, dated November 22, 1985
4) NRC Region I Inspection Report 50-412/85-07, dated June 7, 1985
5) NRC Region I Inspection Report 50-412/85-99, dated June 7, 1985
6) NRC ACRS Report, dated November 1,1985, " Advisory Committee on Reactor Safeguards Subcommittee on Beaver Valley Power Station Unit No. 2 (pages 144 and 145)
7) NRC Letter to Duquesne Light Company, " Design, Verification Activities - Beaver Valley 2", dated November 22, 1985

Dear Mr. Thompson:

In your letter of November 22,1984 (Reference #7), Duquesne Light Company (DLC) was requested to "... present any plans you have for assuring that your plant has been designed in accordance with FSAR commitments and NRC regul at ions ." The purpose of this letter is to provide a detailed response to the above request, identifying the actions taken in the past and activities which are in process or scheduled for providing strong assurance that BVPS-2 has been designed in accordance with FSAR commitments and NRC regulations.

With awareness of methods in general use within the Nuclear Industry to demonstrate that the design process meets all applicable requirements, DLC has initiated multiple programs. These include design reviews utilizing inde-pendent outside contractors for specific tasks, utilizing in-house DLC engi-neering personnel with nuclear plant experience for in-depth reviews, and uti-lizing Stone and Webster Engineering Corporation (SWEC) engineering personnel and engineering assurance programs for in-depth and overall program reviews.

All of these reviews and programs have been controlled and are auditable. A number of these programs have been formally presented to the NRC and are as follows:

8601220203 DR 860117 i O ADOCK 05000412 PDR

r 1

. i United States Nuclear Regulatory Commission Mr. Hugh L. Thompson, Jr., Director Design Verification Activities Page 2

1. Engineering Confirmation Program - (Reference #1)

This program was developed in the second quarter of 1983 and was formally presented to the NRC Region I on October 21, 1983. The program, a joint DLC/SWEC effort, included the following objectives utilizing DLC engineers and SWEC project engineering personnel:

a) DLC o Endorse the Plant Design Bases o Implement the Engineering Charter and provide additional engi-neering procedures o Define the "As-Built" program b) SWEC o Confinn the adequacy of engineering information o Assure consistency of information o Confirm Design Criteria and Licensing Document Correlation o Scope and schedule "As-Built" program o Strengthen design interface and design control implementation The DLC portion has been completed in the DBE program (see item #2, below) with centinuing efforts in a defined follow-on program. Engi-neering personnel have been in-place and procedures have been devel-oped and are being impl emented. The "As-Built" program has been defined and is in process of implementation compatible with schedule and document releases.

The SWEC portion is parallel and integrated with the DLC 08E program (see item #2, below). All objectives have been met or are in pro-cess, as scheduled. The "As-Buil t" program has been defined and integrated with design and construction activities.

2. Design Bases Endorsement Program This program, an integral part of the Engineering Confirmation Pro-gram, was initiated by DLC in March , 1983, to provide a thorough documented review and evaluation which led to the endorsement of SWEC Design Criteria Documents and Confirmation of SWEC Design Process and Control Documents. Included in this program was review and evalua-tion of design output documents and validation of key attributes of the installed design for selected, sample systems. Comments devel-oped by the DLC review were resolved mutually between DLC and SWEC, involving 48 DLC engineers for approximately 11,000 man-hours and involving approximately 50 SWEC engineers.

L

F United States Nuclear Regulatory Commission Mr. Hugh L. Thompson, Jr., Director Design Verification Activities Page 3 The completion of this program in June, 1984, as documented in an auditable DLC report, concluded that the DLC Design Bases Endorsement (DBE) Program has demonstrated that the BVPS-2 Plant Design Bases, as defined in this report, have no significant unresolved concerns and are considered acceptable by DLC. The program enabled DLC to effec-tively identify potential design discrepancies. Each of these has been addressed and either resolved to DLC's satisfaction or included in a follow-on program which is expected to result in a satisfactory resol ution .

As a continuing function, follo.;-on activities were formally estab-lished by DLC in August,1984, with DLC diract involvement and con-trol.

The NRC Region I periodically reviewed and/or audited the DBE program and portions of the Engineering Confirmation (References #2, #3 and

  1. 5). In particular, the NRC Region I stated that they found the Engineering Confirmation Program and Design Bases Endorsement Program to be thorough. The following is a quote from Reference #5, Section 9:

"The Duquesne Light Company (DLC) manpower commitment has been substantial. An example of such commitment is illu-strated by the expenditure of approximately 11,000 man. hours by forty-eight DLC engineers in completing the Design Bases Endorsement effort of the " Engineering Confirmation Program" with the major conclusion drawn that DLC has no unresolved concerns with Beaver Valley Power Station - Unit No. 2 Plant Design Bases. NRC found this effort to be thorough. DLC did identify some specific design discrepancies, but these are being resolved with Stone and Webster through an effec-tive follow-on program."

3. Engineering Assurance Program The SWEC Engineering Assurance Division (EA) has completed two spe-cial in-depth technical audits of the BVPS-2 design process to verify that various plant systems are consistent with licensing commitments with a third audit of this type currently in progress. These special in-depth audits involve highly qualified personnel independent of the BVPS-2 project and include all appropriate engineering disciplines.

The purpose, scope and conduct of a collection of such audits is similar to an IDI or IDVP. Similar audits for other SWEC designed nuclear units have been found by the NRC Staff to be acceptable alternatives to an IDI or IDVP. One of the technical audits was reviewed by the NRC special inspection team that conducted the most recent CTI in March,1985, and was cited as a strength for BVPS-2

7--

United States Nuclear Regulatory Commission Mr. Hugh L. Thompson, Jr., Director Design Verification Activities Page 4 (Reference #4). The following is quoted directly from Appendix B, Part B of Reference 4:

"Part B:

(3) The engineering audit EA-319 was found to be exceptionally technical hi ere and scope. It involved SWEC engineer-ing spe ialists from several divisions / departments in addf-tion 60 SWEC engineering assurance personnel, thus provid-ing additional scope and technical depth. The audit responses were required to be thorough as evidenced by the depth of response, evaluation and follow-up actions (Sec-tion 4.2.4.2)."

One of these in-depth, EA technical audits remains to be performed at BVPS-2 and is currently scheduled to commence in April,1986. This audit will involve a design review of a safety related system and associated systems and structures. Selected site activities relating to the design of this system will be incl uded in the scope of the audit. The results of the four in-depth technical audits discussed above will be analyzed in a summary report which is scheduled to be completed by November,1986. This report is expected to document the bases for concluding that the BVPS-2 design and design process have satisfactorily addressed applicable regulatory requirements.

4 DLC Quality Assurance Program OLC is responsible for overall quality assurance functions associated with BVPS-2 and major BVPS-2 contractors. The DLC QA program is extensive and involves independent reviews and verification of all phases of the design, engineering, construction, and operation of the BVPS-2 plant. The NRC has eval uated this QA program in many instances and determined it to be adequate and in compliance with applicable regulatory requirements. Conclusions of the adequacy of the BVPS-2 Program are noted in the most recent Construction Team Inspection (Reference #4), and the most recent NRC Systematic Assess-ment of Licensee Performance (Reference #5).

5. Other BVPS-2 Program _s In addition to the above program efforts, the other BVPS-2 programs which are intrinsic to the BVPS-2 engineering and deste,n process, provide an additional verification of adequacy of tht process.

These programs include the following:

L_ -

United States Nuclear Regulatory Comission Mr. Hugh L. Thompson, Jr., Director Design Verification Activities Page 5 a) Fluid Systems Design Review of entire plant mechanical items conducted by outside contractor in support of DLC Mechanical Engineering Department during 1978 (50,000 man-hours).

b) Fluid System Design Finalization Program (1980 through 1982) which addressed plant operations, startup, and maintenance con-cerns identified in BVPS-1 and their application to BVPS-2 plant systems design. Also included were proper applications of later industry codes and standards and regulatory requirements, c) Establishment and resolution of the "BVPS-2 Open Items List" as a follow-on to the Fluid System Finalization Program, as well as including open design items in other disciplines (licensing, electrical, structural, etc.). A separate open items list was devel oped for Westinghouse Electric Corporation NSSS supplied items. This program was initiated in March,1982 and completed in July,1984, with resolution for all (375) items.

d) Design reviews utilizing independent outside contractors for specific design assessments, verifications and reviews were con-ducted during the period 1982-1984. These included the following programs:

o Review of Equipment Qualification Program - NUS o Review of Hydrogen Recombiner Adequacy -

Quadrex and Duke Power o Review of the ASME Program - Duke Power, Teledyne & R. L. Cloud Associates o Review of the Site Engineering Processes - Duke Power o Review of BVPS-2 Soil Structure Interaction and Site Specific Response Spectra - Team of Five DLC Consultants and Several SWEC Consultants These independent design reviews resulted in confirming that the plant design bases and the regulatory commitments are consistent and coordinated.

Involvement of DLC has been significant in the Design Finalization Program through the evolution to the BVPS-2 Open Items List and- to the present Design Change Control Program. Personnel from DLC Engi-neering Departments and DLC Startup Group interfaced with various SWEC engineering disciplines and Westinghouse Corporation for approx-imately 4.5 years with more than 20 man-years (40,000 man-hours) of effort.

1

United States Nuclear Regulatory Commission Mr. Hugh L. Thompson, Jr., Director Design Verification Activities Page 6 In conclusion, DLC has instituted an extensive and diverse set of programs that fulfill the NRC's request for additional assurance that BVPS-2 has been designed and constructed in full compliance with applicable commit-ments and regulations. Due to the historically high costs associated with IDI/IDVP efforts, DLC must ensure that such expenditures are prudent and are justified by re3,'atory requirements or by potential positive impacts on the project in its latt stages of construction. For the reasons cited above, DLC firmly believes that 9 additional effort utilizing an IDI or IDVP is unwar-ranted. This conclusivi. was apparently endorsed in comments by the NRC Staff in the recently concluded - BVPS-2 ACRS Meeting (Reference 6, Pages 144 and 145). We trust that the requirements of 10CFR50.54(f) will be appropriately applied by the staff if an IDI or IDVP is found to be necessary.

DUQUESNE LIGHT COMPANY By . _

ud.y;4 rey _ f' Vice President JRH/sim cc: Mr. P. Tam, Project Manager Mr. G. Walton, NRC Resident Inspector SUBSGRIBED ANDAWORN TO BEFORE E THIS 47// DAY OF L/,t'h ,1986.