Forwards Evidence Documenting That Continuing S&W Detailed Design Reviews Provide Addl Assurance Sought by NRC That Design Process Used for Constructing Plant in Full Compliance W/Fsar & NRC Regulations
ML20155K343
Person / Time
Site: Beaver Valley
Issue date: 05/21/1986
From: Carey J
DUQUESNE LIGHT CO.
To: Grimes B, Imbro E
NRC, NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20155K347 List:
References
2NRC-6-052, 2NRC-6-52, TAC-62939, NUDOCS 8605280097
Download: ML20155K343 (4)


Text

o

'Af Duquesrie Lisfit ver alley No. 2 Unit Project Organization 2NRC-6-052 (412) 643 5200 P.O. Son 328 Telecopy (412) 643 5200 Shfocingport. PA 1507; fat. 160 May 21, 1986 Mr. Brian K. Grimes, Director Quality Assurance Programs Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Mr. E. V. Imbro 3058 East West South

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Design Verification Activities

REFERENCES:

(1) NRC Letter (H. L. Thompson), dated November 22, 1985 (2) DLC Letter 2NRC-6-009, dated January 17, 1986 Gentlemen:

DLC has proposed that the continuing detailed design reviews conducted by DLC, SWEC, or contractor personnel under DLC direction throughout the BV-2 project design effort provide the additional assurance sought by the NRC that the design process used for constructing BV-2 has fully complied with the FSAR commitments and NRC regulations. We feel that the SWEC Engineering Assurance In-Depth Technical Audit Program supplemented by the various special DLC review programs provides a prudent alternative to an IDI.

As further evidence of the efforts described, we have attached the following:

1) Final Summary Report of the DLC Design Bases Endorsement Progran (dated June 1984).
2) SWEC Engineering Assurance Audit No. 44 of BV-2 design (conducted November 28, 1983, to February 13,1984).
3) SWEC Engineering Assurance Audit of the BV-2 Site Engineering Group (conducted April 23 to June 20,1984). j
4) SWEC Engineering Assurance Audit #50 of the BV-2 Hazards Analysis Progran (conducted November 12, 1985, to January 31,1986).
5) Program for Completion of the Engineering Assurance In-Depth Technical Audits of the BV-2 Project (approved by DLC on April 23, 1986). -

O l 8605280097 860521 I PDR ADOCK 05000412 1 i

(

A PDR

United States Nuclear Regulatory Commission Mr. Brian K. Grimes, Director Design Verification Activities Page 2 We have had discussions with your personnel on February 28, 1986, and April 8, 1986, in Bethesda, at a site visit on April 24, 1986, and in the SWEC Boston office on April 28-30, 1986. Your personnel have reviewed the detailed inspection plans for the joint DLC/SWEC May 1986 Final Audit.

Based upon these meetings, we understand that you have determined that our program, when complete, will provide adequate evidence for your review to determine that the BV-2 design process has met the license requirements.

The final report evaluating the four (4) Engineering Assurance audits is to be completed in November 1986.

DUQUESNE LIGHT COMPANY By J.vJ. Ctrey v Vice President REM /ijr At tpcfiinents AR/g NR/ GRIMES cc: Mr. P. Tam, Project Manager (w/a)

Mr. J. M. Taylor, Director (3) (w/a)

Mr. W. Troskoski, Sr. Resident Inspector (w/o)

Mr. L. Prividy, NRC Resident Inspector (w/o)

INP0 Records Center (w/o)

NRC Document Control Desk (w/a)

TO BEFORE ME THIS SJUSCRBEDANDS d AY OF - , 1986.

NJ k- Std&26 Notary Public SHULA M. FAff0RE. NOTARY PUBUC SHIPPIMPORT 90a0, SEAVER COUNIT MY COMMISSION EXPitES OCT. 23.1989 4 Pa ew. 8Merynnah Association of Motsries e _

United States Nuclear Regulatory Commission Mr. Brian K. Grimes, Director Design Verification Activities Page 3 COMMONWEALTH OF PENNSYLVANIA )

SS:

COUNTY OF BEAVER 1 On this ( N J(( ' day of b ,

/fM , before me, a Notary Public in and for said Commonw[alth and County, personally appeared J. J. Carey, who being duly sworn, deposed and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statenents set i

forth in the Submittal are true and correct to the best of his knowledge.

h'Notary Public SHEILA M. FATTORE, NOT#WY PUCUC SHIPPINGPORT BORD, BEAVER COUNTY MY COMMISSION EXPIRES OCT. 23,1919 U+mbw, Ponesylvula Asso@iw cf ibb+:

m -- -+- " n -e-

O 1, 2NCD-03617 July 20, 1984 DUQUESNE LIGHT COMPANY NUCLEAR CX)NSTRUCTION DIVISION ENGINEERING DEPARTMENT TO: R. E. Dougher G. R. Brandenberger R. E. Martin J. H. Lacshaw J. F. Zagorski DESIGN BASES ENDORSEMENT PROGRAM Attached is a copy of the text from the Design Bases Endorsement (DBE) Program report. The supporting documentation is quite extensive and is being maintained by NCD Docussent Control.

The report concludes that the DLC DBE Program demonstrated that the BVPS-2 Plant Design Bases, as de fined in the report, have no significant unresolved concerns and are considered acceptable by DLC. This program ena-bled DLC to effectively identify specific design discrepancies.

Each of these has been addressed and either resolved to DLC's satis faction or included in a recommanded follow-on program which is expected to result in a satisf actory resolution. Recommendations are listed in Section VII, Part E, of the report.

Sincerely yours, H. M. Siegel Engineering Manager VJC/ani Attachment MC/ LETTER /DBE cc: Js A. Mults - w/ attachment E. F. Kurtz - w/ attachment J . F. Ankney - w/ attachment P. A. Cadena - w/o/ attachment L. W. Hawkins - w/ attachment H. J. Nickl - w/o/ attachment J. R. Houghton - w/ attachment M. A. Zaki - w/o/ attachment L. R. Knapp - w/ attachment V. Lechpammer - w/ attachment W. F. Reimer - w/ attachment P. RaySircar (6) - w/actachment MCE - w/ attachment NCD File - w/ attachment

-