Notifies of Review of Util Re Proposed Program for Completion of Engineering Assurance In-Depth Technical Audit. Proposed Engineering Assurance Program Acceptable for Integrated Design Insp or Idvp
ML20199L742
Person / Time
Site: Beaver Valley
Issue date: 07/07/1986
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Carey J
DUQUESNE LIGHT CO.
References
TAC-62939, NUDOCS 8607090597
Download: ML20199L742 (3)


Text

.

) pmm('g UNITED STATES

[g '

g NUCLEAR REGULATORY COMMISSION e g; j WASHING TON. D. C. 20555 l

JUL 07 E Docket No.: 50-412 Mr. J. J. Carey, Vice President Duquesne Light Company Nuclear Group P. O. Box 4 Shippingport, PA 15077

Dear Mr. Carey:

SUBJECT:

BEAVER VALLEY POWER STATION-UNIT NO. 2 (BV-2) ENGINEERING ASS PROGRAM (EAP)

We have reviewed your May 21, 1986 letter which submitted your proposed " Program for Completion dated April of the Engineering Assurance In-Depth Technical Audit" EA-111 23, 1986, supplemented by other Stone and Webster Engineering Corporation (SWEC) EA Audits (Ref. Audit Nos. 44, 50, and the audit of BV-2 Site Engineering Group) as well as other Duquesne Light Company (DLC) review programs.

Based on our discussions during the February 28, 1986 and April 8, 1986 meetings, the scope of EA-111 was limited in recognition of the supplemental audits performed by both SWEC and DLC, particularly SWEC EA Audit #50 of the BV-2 hazards analysis program, SWEC Audit #44 covering the fuel pool cooling and cleanup system plus portions of the fuel building, and DLC's Design Bases Endorsement program. The NRC staff plans to inspect the implementation of corrective actions and follow-on items identified by these programs to ensure that their intended objectives were met and the items have been successfully completed.

We also had discussions with SWEC and DLC personnel during our scope inspection of this subject at SWEC offices in Boston, Massachusetts on April 28-30, 1986.

Based on our review and discussions with your staff, the NRC staff finds the proposed BV-2 EAP an acceptable substitute for an IDI or IDVP as a means of providing the NRC additional assurance that the design of the BV-2 complies with FSAR commitments and NRC regulatory requirements.

Sincerely, 8607090597 860707 PDR ADOCK 05000412 Daniel Mcdonald, Acting Director A PDR Project Directorate #2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation cc: See next page l

1 Mr. J. J. Carey Duquesne Light Company Beaver Valley 2 Power Station ec:

Gerald Charnoff, Esq. Mr. R. E. Martin, Manager Jay E. Silberg, Esq. Regulatory Affairs Shaw, Pittman, Potts & Trowbridge Duquesne Light Company -

1800 M Street, N.W. Beaver Valley Two Pro.iect Washington, DC 20036 P. O. Box 328 Pittsburgh, Pennsylvania 15077 Mr. C. W. Ewing, Quality Assurance Zori Ferkin Manager Assistant Counsel Quality Assurance Department Governor Energy Council Duquesne Light Company 1625 N. Front Street P. O. Box 186 Harrisburg, PA 15105 Shippingport, Pennsylvania 15077 Director, Pennsylvania Emergency Management Agency Room B-151 Transportation & Safety Building Harrisburg, Pennsylvania 17120 Mr. T. J. Lex Mr. Thomas Gerusky Westinghouse Electric Corporation Bureau of Radiation Protection Power Systems PA Department of Environmental P. O. Box 355 Resources Pittsburgh, Pennsylvania 15230 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Mr. P. RaySircar Stone & Webster Engineering Corporation BVPS-2 Records Management Supervisor P. O. Box 2325 Duquesne Light Company Boston, Massachusetts 02107 Post Office Bo . 4 Shippingport, Pennsylvania 15077 Mr. W. Troskoski U. S. NRC John A. Lee, Esq.

P. O. 181 Duquesne Light Company Shippingport, Pennsylvania 15077 1 0xford Centre 301 Grant Street Mr. Thomas E. Murley, Regional Admin. Pittsburgh, Pennsylvania 15?79 U. S. NRC, Region I 631 Park Avenue King of Prussia, Pennsylvania 15229

\ .

l

. .(

Distribution:

DC5 016 NRC PDR Local PDR QAB Reading DQAVT Reading JMTaylor, IE RHVollmer, IE BKGrimes, IE HJMiller, IE GTAnkrum, IE EVImbro, IE HBWang, IE P. Tam, NRR LSRubenstein, NRR PKEapen, RI LETripp, RI DMcDonald, NRR QAB: QAVT:IE QAB:DQAVT:IE C:QAB:D T:IE IE HBWang EVImbro m o# GTAn iller 06/f// y 6 06 /86 86 A T- :NRR B e

^^ cDonald b

86 9 sfi 07/1/86