ML20134L966

From kanterella
Jump to navigation Jump to search
TS Change Request 196 to Licenses DPR-24 & DPR-27, Respectively,Relocating Turbine Overspeed Protection Surveillances,Limiting Conditions for Operation (Lcos),Per NRC GL 95-10
Date released: 05/27/2020 Download: ML20134L966


Proposed Tech Specs Re Relocation of Turbine Overspeed Protection
ML20134L979
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 02/12/1997
From:
WISCONSIN ELECTRIC POWER CO.
To:
References
Download: ML20134L979 (7)
TS Change Request 196 to Licenses DPR-24 & DPR-27, Respectively,Relocating Turbine Overspeed Protection Surveillances,Limiting Conditions for Operation (Lcos),Per NRC GL 95-10
ML20134L962
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 02/12/1997
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20134L962 (5)