ESAsCo SERVICES INCORPORATED WATERERD STEAM ELECTRIC STATION - UNIT NO 3 PROCEURE FOR:
INSUL.CION RESISTANCE TE!!!NO CF ROTATING EI.EC~RICAL EQUI? MENT AND PC'a'ER CABLES l.80V SERV:CE AND A30VE FEDE,mu-a CP-425 W
ISSUE
SUMMARY
3 5w IS SUE /DA*E l
PREPARED I
APPROVED I
RDd. ARKS l
u>
A Draft /
S. Rlot:
O e
h
.l( k. E h C-W i3 A/12/30/76 S.Klod:
J. O. Booth
=
3 Orait
- 5. Riot:
E11=inated paragraphs 3.3, 3
5.2 and 6.7.
Re -is ed so
=ini=u= resistances in 4
paragraph 6.2.
e fr,<
).c.rw 3 2/1S/77 S..J o t"z J. O. Booth Revised 6.2, 6.5.3, 6.5.4, and 6.6.
Eli=inated 6.5.1 g
and 6.5.5.
.a 8
C 3 raft R C Munter Elisinated Paragraph 6.4.2 fUAhwW I ~
~&-
m
=
C 5/13/77 R C..unter J. O. Booth Revised 6.1, 6.2 and 6.3 e
z D Orafe R C Munter Revised paragraphs 5.1, 6.1, h l.l h j. C' &~L' O
g 3 8/1/77 R C Munter J. O. Booth E
b b e-1 L
E Draft G. Banquer 5-29-79 s
hk G.Banh J. Cp ich Revised paragraphs 2.4, 5.1, E
08-22-79
/
//
6.2 and added paragraph 6.6 s
- l. b'+nVm A
F Draft Sarg ue r J. Crnich Revised paragraph
/#<* net
//
6.3, and added a new section, F 5-13-80
. '3ar.!!t:e J. C =ich 6.5.
8510020236 850227 PDR FOIA DERilAB E84-206 PDR 9
fo/AL 1Y-A n d FORM NO. ASP-III-1-3 (10-13-75)
O///
' h CASCS SERVIC~S INCORPORAT"3 4
- ATERFORD STEAM EI.ICRIC STATICN - UNIT ::C 3
=
?ROCCCC FOR: INSULCICS RES! STANCE TESTING CF ROTATING EEC RICAL EQUIPMENT.CD
?ROCDURE.C 3IR:
?ONER CABES ASOV SERVICE AND A30VI C?-425 b
ISSUE SCDIARY W=$
2
- .a i
i w
e RDiAR.KS I
i IS S's /O ATE I
PRE 5ARD f
APPROVED aa w>
J. Crnich Revised paragraphs 5.1, 6.4, wM G " raft G. San er 6.4.2, and added paragraph g
/
g 3.4 3
i3 Revised paragraphs 1.1, 2.5, E Draf:
M. Murtha
=
3.5, 3.6,1. 1,
., 6.2, 6.4, S
6.4.1, 6.4.2, 6.4.3, 6.5.1, 6.5.3, 6.5.4, 6.6,
=
3 6.7, 6.8.
w 4
ve Added paragraphs 4.2, e
deleted paragraph 6.5.2 EE5 5
.m
=.
e-z e
m=
.c e-.<H9 l
TOW. NO.
ASP-III-1-3 (10-13-75)
-=
1
l ET.'.';CO CT.~.*.*1CE 1::C2 n: J:.AT ::
ND.
CP-425 l
I 1i Dra.a.
ISSUC:
M A T r2.r C n D 7 7 7.*.*4 Cl ". C C C S T A ! ! ::
'J:::T ::0 : k'Acr.:.1 cr 4 l.
" f
1 1.0 PURPOSE i
1.1 To provide work instrue:1ons for periodically ceasuring the insulation i
E resistance of rotating electrical equip =en: and/or power cable in order
- o develop an historical record of the condition of the insulation and to deter =ine if :he insulation is clean and drf.
2.0
' SCOPE 2.1 This procedure shall apply to all per=anen: plant three phase indue:1on
=otors.ra:ed one horsepower and above.
2.2 *his procedure shall apply :o generators as qualified in :he applicable Care and Maintenance Instruc:1on (CMI).
2.3 This procedure shall apply to any motor not included in Paragraph 2.1 if the applicable Care and Maintenance Instrue:1on (CMI) requires in-sulation resistance :esting.
E 2.4 This procedure shall apply to the above equip =ent from the time it is received on site to :he ti=e it is turned over to the client.
E 2.5 This procedure shall apply to 480V and above power cables, safety and non-safety, once pulled and after lugs installed but prior to =aking connections.
3.0 REFERENCES
3.1 ANSI N45.2.2 - Packaging, Sh:.pping, Receiving, Storage and Handling of ite=s for Nuclear Power Plants.
4 3.2 IEEE Standard 43 - Recorr:: ended Guide for Testing Insulation Resistance of Rotating Machinery.
3.3 ASP-IV-19, Caring and Maintaining of Permanent Plant Equipment.
G 3.4 ASP-IV-48, Safety Tagging Procedure.
I a
3.5 WQC-4, Calibration and Control of Measuring and Test Equip =ent.
E 3.6 CP-696, Cable Ter=ination and Splices.
I 4.0 DE71NITION d
4.1 Du:::y 3reaker - A grounding and test device with three studs which can be placed in position to engage the line contacts and provide safe access to the load side of the circuit.
H 4.2 Polarization Index - A ratio of a 10 minute megger reading to a one minute reading (10 min /l min) 5.0 RESPONSI3II.ITY The Start-Up '-(OOR.Dl484 TI OAJ ' = Superintendent,
G 5.1 or his designee, shall
~ ~ r*
bfre'sp8ns ible Tf Frritsp fea9nting shts rprocedu re p
- u, n i r : S. %. n,, p. p :..a.,
- f.. i N.,,,
t 4
c.c f [,L A h,J.g N..:.) N d h t [
(jk.
e t r.
s, s.s. p.. g,...u. t e
& g.g.p-.s 4
g s
-c LdU c
Eg
+
l
..~
I EUACCO CCT.*.*10E3 1: 00:!PC::AT:.~0 pD. C?-425 l
H Draf:
ISSUC:
MATrnrC*:D *:7F.*21 C'.. O~ :10 *C.*.T!O:: - U::!T ::0 2 k'AC..
2 cr 4 l
6.0 PROCIOURE E
6.1 Within 72 hqurs af ter receipt, if required by the applicable CMI, connect the =otor or generator space heater :o a power supply of :he correc:
vol: age.
NOTE: Assure that hea:er is properly wired prior :o energi:ing.
H 6.2 Wi:hin :venty working days after receipt, the =otor or generator shall be iden:1fied by using the nu=ber of :he CMI :o which it is associated.
If = ore than one =otor is a par: of the CMI, an alphabetical suffix will be used to uniquely identify each =otor or generator in a sui:able nanner as near as possible to the na=eplate.
6.3 Within twenty working days af:er receipt, when needed to facili: ate periodic
=easure=en: of :he insulation resistance, connec: all of the =otor winding leads in c~=:en :o a pigtail. For c nnections to generator winding leads, see the applicable CMI. Also provide a pig: ail to the motor or generator -
fra=e.
Bring the two pigtails out of the connection box and seal around
- he opening vi:h an approved sealant or tape.
NOTE: If =otor or generator has been ter=inated as part of the installation sequence or has been supplied already wired into a control circuit or syste=,
l proceed per step 6.5 of this procedure.
H 6.4 Measure the insulation resistance between the =ocor or generator windings and :he fra=e, by means of a polarization index,upon receipt, and every 6 =en:hs thereaf ter, unless specified otherwise in the applicable CMI.
The one =inute reading, can =inute reading as well as the polarization index shall be recorded.
Test Voltage Motor Rated Voltage 500 480V and below 1000 4000-4160V 2500V ABOVE 4160V j
-f*l l
E Dre:.t
-j
..:..o.a r.
..o cr.s t.:Cc:a w.u a
. >. CP 425 s-k ISSUE:
WATEnr0RD ::T:*./.'t E!.EC RIC STi.TIO:: - U::I T !:0 3 PACr.:. 3 0F 4
/
H 6. l. 1 Material Q.C. Inspector' ust witness =eggering of all class IE equipment during varehouse storage.
H 6.4.2 3efore* and af ter the insulatica resistance test is =ade, assure that the Octor vinding insulation has been co=pletely discharged.
CAC !ON: On very large motors under dry conditions and having high insulation resistance (greated than 1000 magoh=s), the time required for co=pletely discharging the vinding insulation =ay be 20 =inutes or more.
G.E 6.4.3 The segger used cust be in accordance with the Ebasco WQC-4 program or approved Contractor's program and the calibration =ust be current. Check date on calibration tag before using /*d /ff8/88 M8I, calibration has not expired.
ID nu=ber and calibration due date
=ust be recorded on testing docu=entation.
For meggering terminated =ocors or generators or those which have been 5.5 supplied already vired into control circuits, systa=s, ete:
H 6.5.1 Test voltage shall be the same as in step 6.4.,
H 6.5.2 Test personnel shall isolate equipment which could be damaged fro: the equipment being =eggered.
If any doubt exists, consult Ebasco Engineering.
H 6.5.3 Meggering is to be performed at the most readily accessible location which is as electrically close to the equipment as possible.
Examples:
a) Load side of MCC contactors and breakers, b)- Load side of power center breakers.
c) Load side of medium voltage switchgear by the use of a "du mf" heeaker for access to line or downstream side and for bus protection l
l
~._,--
3
.)'
CP-. 9.o.
..i 1
+.
s
.... s. t. J
- ..#Y...
... %.s., p
..s h e e..J a.. Y
..a
,d Draf:
., Lr...>+ Oe l
t..-..3 y A.
,,.n.t D...... 4.....c.. T +. C S. A...a..
- s s-u om A
.. v.
..6
..w E.E 6.6 ne.Equipnen: Maintenance Superviser, or his designee, shall naintain wri::en schedules and re:Ords of insulation resistance :escing per AS?-IV-19 aM evaluate these resul:s. ;*nen una::ep:able, a ':iscrepancy Report will be genera:ed per A5F ~V-19.
Accettable Values 5 Max Folari:a:1cn Index (10/1-cinu:e ra:io) 2 Min E
6.7 For final insula:icn resis:ance :esting prior to operation of nachine, refer to IEEE ST3.'.3-1.97/. per Ref. 3.2.
l 3
6.3 Megger power cables, safety and non-safety, for LSOV se:vi:e and above, phase 4
to phase and phas :o ground in accordance with Megger Slip (See CP-696
['
Exhibi: 7.1) ini:ia:ed by Engineering. Mini =.:= acceptable value is 15M.1%
j-Record resul:s :n Megger Slip per CP-696.
Q.C. shall wi: ness safety relatec work and sign off Megger Slip in spaces provided per CP-696.
i 7.0 AT*'AC'-2 DINTS
[