MONTHYEARML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20206G4841999-04-30030 April 1999 Summary of 990315 Meeting with STP Nuclear Operating Co Re Util Submittal of Draft Request for Exemption from Special Treatment Requirements for Components That Are Low Safety Significant or non-risk Significant, ML20199D1931999-01-11011 January 1999 Summary of 981208 Meeting with STPNOC Re Status of Current & Future Licensing Actions & Activities.List of Meeting Attendees & Handout Provided by Licensee Encl ML20195G0641998-11-17017 November 1998 Summary of 980915 Meeting with STP Nuclear Operating Co Re Graded Quality Assurance Implementation & Challenges.List of Attendees & Handout Provided by Licensee Encl ML20155E1271998-11-0202 November 1998 Summary of 981008 Conference Call with Util to Discuss Course Action That Would Be Anticipated If Licensee Were to Submit risk-informed Inservice Insp &/Or risk-informed Inservice Testing Program ML20154J7961998-10-13013 October 1998 Summary of 980915 Meeting with Licensee Re risk-informed Operations at Stp.Copies of Slides Presented Encl ML20247L7411998-05-20020 May 1998 Summary of 980506 Meeting W/Util in Re Proposed Merger Between America Electric Power Co,Inc & Central & Southwest Corp (Csw).Meeting Attendees & Handout Provided by Csw Encl ML20217Q6491998-05-0505 May 1998 Summary of 980413 Meeting W/South Texas Project Nuclear Operating Company Re Current South Texas Project Improved TS Schedule.List of Meeting Attendees & Schedule Encl ML20217N0851998-04-0606 April 1998 Summary of 980303 Meeting W/South Texas Project Re long-term Resolution of Bulletin 88-08, Thermal Stresses in Piping Connected to Reactor Coolant System. Proprietary & non-proprietary Handouts Provided by Licensee Encl ML20199J3371998-02-0202 February 1998 Summary of 980121 Meeting W/Stp Nuclear Operating Co Re Schedule for NRC Review of STPNOC Application for Conversion to Improved Standard Ts.List of Attendees & Handout Provided by Licensee Encl ML20198K4781998-01-0606 January 1998 Summary of 971204 Meeting W/Licensee & Representatives from W Re Proposed 3 Volt Alternate Repair Criteria for Plants Unit 2 Sg.List of Attendees & Handout Encl ML20198G4601997-12-19019 December 1997 Summary of 971210 Meeting W/Licensee Re SG Replacement for Unit 1.List of Attendees & Handout Matls Provided by Licensee Encl ML20199E5771997-11-13013 November 1997 Trip Rept of 971105-06 Visit to Facility for Interviews in Preparation of SALP for Plant ML20212G5041997-10-29029 October 1997 Summary of 971002 Meeting W/Util in Rockville,Md to Discuss Staff Review Schedule for Plant Improved Std TS Conversion Amend.List of Attendees Encl ML20217E4511997-09-22022 September 1997 Summary of 970911 Meeting W/Util in Rockville,Md Re STP 3-train Design & Improved Std TSs Format ML20141C0811997-05-14014 May 1997 Summary of 970424 Meeting W/Util to Discuss Hl&P Plans Re Incomplete Control Rod Insertion at Stp,Units 1 & 2.Meeting Attendees & Handout Provided by Hl&P,Encl ML20140H7801997-05-0808 May 1997 Summary of 970421 Meeting W/Hl&P to Discuss Hl&P Proposed QA Program Change to Implement Graded QA ML20137Z3651997-04-22022 April 1997 Summary of 970403 Meeting W/Util in Rockville,Md to Discuss Staff Review of Licensee Pilot Submittal for Section 3.5 of Project Conversion Amend.List of Attendees & Staff Handouts Encl ML20137Q8641997-04-0909 April 1997 Summary of 970331 Meeting W/Util Re Util Graded QA Application.List of Attendees Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20133N3821997-01-17017 January 1997 Summary of 970109 Meeting W/Hl&P Re Response to NRC Bulletin 96-01, Control Rod Insertion Problems. List of Attendees & Licensee Handout Encl ML20133M2671997-01-15015 January 1997 Summary of 961212 Meeting W/Util Re Status of Staff Review of Licensee Request to Convert Plant TS to Improved Std TS Format.List of Attendees Encl ML20134L7841996-11-20020 November 1996 Summary of 961114 Meeting W/Hl&P in Rockville,Md to Discuss Status of NRC Review of Licensee Request to Convert STP TSs to Improved STS Format.List of Attendees Encl ML20206R4701996-11-0707 November 1996 Summary of 960821-22 Meetings with Hl&P in Wadsworth,Texas Re Graded Quality Assurance Program at Stp.List of Meeting Attendees for Initial Meeting,List of Meetings Held During Two Day Session & Handouts for Meetings Encl ML20128L2901996-10-0808 October 1996 Summary of 960916 Meeting W/Hl&P to Discuss Plans for SG Replacement at STP-1.List of Attendees & Handout Encl ML20059K1731994-01-27027 January 1994 Summary of 940121 Meeting W/Utils Re Results of Operational Readiness Assessment Team Insp at Plant.Various Deficiencies Noted.Media Representatives in Attendance ML20059F3491994-01-0606 January 1994 Summary of 931217 Meeting W/Hl&P Re Analysis Performed on Ecw Sys.W/Attendance List & Meeting Agenda ML20058L7311993-12-13013 December 1993 Summary of 931108-09 Meeting W/Licensee in Rockville,Md Re Resolution of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Agenda & List of Attendees Encl ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062B3771990-10-15015 October 1990 Summary of 900919 Meeting W/Util & Sandia Re Fire Protection Portion of Probability Safety Assessment ML20056A0011990-07-27027 July 1990 Summary of 900530-31 Meeting W/Sandia Natl Labs & Util Re PRA Review.Meeting Attendees Listed in Encl 1 ML20058L0521990-07-19019 July 1990 Summary of 891128 & 29 Meetings W/Util,Sandia & Sea,Inc Re Plant Probability & Safety Assessment.List of Attendees & Sandia Questions W/Licensee Answers Encl ML20246P6111989-09-0505 September 1989 Summary of 881130 Meeting W/Util at Plant Re Ability of Pressurizer Surge Line to Withstand Effects of Thermal Stratification.Discussions Concentrated in Areas of Design Documentation,Thermal Hydraulics & Stratification ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245J4261989-08-11011 August 1989 Summary of 890808 Meeting W/Util & Sandia at Sandia Re PRA Study for Plant.Attendance List & Viewgraphs Encl ML20246P1811989-05-0909 May 1989 Summary of 890506 Meeting W/Utils & Westinghouse Re Licensee Decision to Remove Remainder of Excessive Cooldown Protection Circuitry & Amend to Tech Specs.List of Meeting Attendees & Licensee Meeting Handout Encl NUREG-0781, Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl1989-05-0909 May 1989 Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl ML20246L2621989-05-0909 May 1989 Summary of 880517 Meeting W/Util & Westinghouse Re Results of bottom-mounted Instrumentation Thimble Tube Insp. List of Meeting Attendees.Presentation Matl Handout Withheld ML20245F5081989-04-25025 April 1989 Summary of 890127 Meeting W/Util Re Status of Licensee Pra. List of Attendees,Agenda & Util Presentation Slides Encl ML20196E2621988-12-0202 December 1988 Summary of 881129 Meeting W/Util & Newman & Holtzinger Re Readiness for Low Power License.List of Attendees & Viewgraphs Encl ML20204D5431988-10-12012 October 1988 Summary of 880908 Meeting W/Util in Arlington,Tx Re Schedule for Completion of Certain Security Tasks ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153D4941988-08-26026 August 1988 Summary of 880810 Meeting W/Util,Westinghouse & BNL Re Status of Studies on Bmi Thimble Tube Wear Problems. Discussions & Licensee Handout Withheld ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20151W5141988-04-21021 April 1988 Summary of Operating Reactors Events Meeting 88-016 on 880419 in Rockville,Md.List of Attendees & Viewgraphs Encl ML20237D8231987-12-17017 December 1987 Summary of 871030 Meeting W/Util Re Assessment of Util Compliance W/License Condition on Physical Security During Low Power Operation ML20237C6061987-12-14014 December 1987 Summary of 871202 Meeting W/Util & Bechtel Re Causes & Mods Relative to Pipe Failures in Auxiliary Feedwater Sys at Plant.List of Meeting Attendees & Util Handouts Encl 1999-09-24
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20206G4841999-04-30030 April 1999 Summary of 990315 Meeting with STP Nuclear Operating Co Re Util Submittal of Draft Request for Exemption from Special Treatment Requirements for Components That Are Low Safety Significant or non-risk Significant, ML20199D1931999-01-11011 January 1999 Summary of 981208 Meeting with STPNOC Re Status of Current & Future Licensing Actions & Activities.List of Meeting Attendees & Handout Provided by Licensee Encl ML20195G0641998-11-17017 November 1998 Summary of 980915 Meeting with STP Nuclear Operating Co Re Graded Quality Assurance Implementation & Challenges.List of Attendees & Handout Provided by Licensee Encl ML20155E1271998-11-0202 November 1998 Summary of 981008 Conference Call with Util to Discuss Course Action That Would Be Anticipated If Licensee Were to Submit risk-informed Inservice Insp &/Or risk-informed Inservice Testing Program ML20154J7961998-10-13013 October 1998 Summary of 980915 Meeting with Licensee Re risk-informed Operations at Stp.Copies of Slides Presented Encl ML20247L7411998-05-20020 May 1998 Summary of 980506 Meeting W/Util in Re Proposed Merger Between America Electric Power Co,Inc & Central & Southwest Corp (Csw).Meeting Attendees & Handout Provided by Csw Encl ML20217Q6491998-05-0505 May 1998 Summary of 980413 Meeting W/South Texas Project Nuclear Operating Company Re Current South Texas Project Improved TS Schedule.List of Meeting Attendees & Schedule Encl ML20217N0851998-04-0606 April 1998 Summary of 980303 Meeting W/South Texas Project Re long-term Resolution of Bulletin 88-08, Thermal Stresses in Piping Connected to Reactor Coolant System. Proprietary & non-proprietary Handouts Provided by Licensee Encl ML20199J3371998-02-0202 February 1998 Summary of 980121 Meeting W/Stp Nuclear Operating Co Re Schedule for NRC Review of STPNOC Application for Conversion to Improved Standard Ts.List of Attendees & Handout Provided by Licensee Encl ML20198K4781998-01-0606 January 1998 Summary of 971204 Meeting W/Licensee & Representatives from W Re Proposed 3 Volt Alternate Repair Criteria for Plants Unit 2 Sg.List of Attendees & Handout Encl ML20198G4601997-12-19019 December 1997 Summary of 971210 Meeting W/Licensee Re SG Replacement for Unit 1.List of Attendees & Handout Matls Provided by Licensee Encl ML20212G5041997-10-29029 October 1997 Summary of 971002 Meeting W/Util in Rockville,Md to Discuss Staff Review Schedule for Plant Improved Std TS Conversion Amend.List of Attendees Encl ML20217E4511997-09-22022 September 1997 Summary of 970911 Meeting W/Util in Rockville,Md Re STP 3-train Design & Improved Std TSs Format ML20141C0811997-05-14014 May 1997 Summary of 970424 Meeting W/Util to Discuss Hl&P Plans Re Incomplete Control Rod Insertion at Stp,Units 1 & 2.Meeting Attendees & Handout Provided by Hl&P,Encl ML20140H7801997-05-0808 May 1997 Summary of 970421 Meeting W/Hl&P to Discuss Hl&P Proposed QA Program Change to Implement Graded QA ML20137Z3651997-04-22022 April 1997 Summary of 970403 Meeting W/Util in Rockville,Md to Discuss Staff Review of Licensee Pilot Submittal for Section 3.5 of Project Conversion Amend.List of Attendees & Staff Handouts Encl ML20137Q8641997-04-0909 April 1997 Summary of 970331 Meeting W/Util Re Util Graded QA Application.List of Attendees Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20133N3821997-01-17017 January 1997 Summary of 970109 Meeting W/Hl&P Re Response to NRC Bulletin 96-01, Control Rod Insertion Problems. List of Attendees & Licensee Handout Encl ML20133M2671997-01-15015 January 1997 Summary of 961212 Meeting W/Util Re Status of Staff Review of Licensee Request to Convert Plant TS to Improved Std TS Format.List of Attendees Encl ML20134L7841996-11-20020 November 1996 Summary of 961114 Meeting W/Hl&P in Rockville,Md to Discuss Status of NRC Review of Licensee Request to Convert STP TSs to Improved STS Format.List of Attendees Encl ML20206R4701996-11-0707 November 1996 Summary of 960821-22 Meetings with Hl&P in Wadsworth,Texas Re Graded Quality Assurance Program at Stp.List of Meeting Attendees for Initial Meeting,List of Meetings Held During Two Day Session & Handouts for Meetings Encl ML20128L2901996-10-0808 October 1996 Summary of 960916 Meeting W/Hl&P to Discuss Plans for SG Replacement at STP-1.List of Attendees & Handout Encl ML20059K1731994-01-27027 January 1994 Summary of 940121 Meeting W/Utils Re Results of Operational Readiness Assessment Team Insp at Plant.Various Deficiencies Noted.Media Representatives in Attendance ML20059F3491994-01-0606 January 1994 Summary of 931217 Meeting W/Hl&P Re Analysis Performed on Ecw Sys.W/Attendance List & Meeting Agenda ML20058L7311993-12-13013 December 1993 Summary of 931108-09 Meeting W/Licensee in Rockville,Md Re Resolution of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Agenda & List of Attendees Encl ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062B3771990-10-15015 October 1990 Summary of 900919 Meeting W/Util & Sandia Re Fire Protection Portion of Probability Safety Assessment ML20056A0011990-07-27027 July 1990 Summary of 900530-31 Meeting W/Sandia Natl Labs & Util Re PRA Review.Meeting Attendees Listed in Encl 1 ML20058L0521990-07-19019 July 1990 Summary of 891128 & 29 Meetings W/Util,Sandia & Sea,Inc Re Plant Probability & Safety Assessment.List of Attendees & Sandia Questions W/Licensee Answers Encl ML20246P6111989-09-0505 September 1989 Summary of 881130 Meeting W/Util at Plant Re Ability of Pressurizer Surge Line to Withstand Effects of Thermal Stratification.Discussions Concentrated in Areas of Design Documentation,Thermal Hydraulics & Stratification ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245J4261989-08-11011 August 1989 Summary of 890808 Meeting W/Util & Sandia at Sandia Re PRA Study for Plant.Attendance List & Viewgraphs Encl ML20246L2621989-05-0909 May 1989 Summary of 880517 Meeting W/Util & Westinghouse Re Results of bottom-mounted Instrumentation Thimble Tube Insp. List of Meeting Attendees.Presentation Matl Handout Withheld ML20246P1811989-05-0909 May 1989 Summary of 890506 Meeting W/Utils & Westinghouse Re Licensee Decision to Remove Remainder of Excessive Cooldown Protection Circuitry & Amend to Tech Specs.List of Meeting Attendees & Licensee Meeting Handout Encl NUREG-0781, Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl1989-05-0909 May 1989 Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl ML20245F5081989-04-25025 April 1989 Summary of 890127 Meeting W/Util Re Status of Licensee Pra. List of Attendees,Agenda & Util Presentation Slides Encl ML20196E2621988-12-0202 December 1988 Summary of 881129 Meeting W/Util & Newman & Holtzinger Re Readiness for Low Power License.List of Attendees & Viewgraphs Encl ML20204D5431988-10-12012 October 1988 Summary of 880908 Meeting W/Util in Arlington,Tx Re Schedule for Completion of Certain Security Tasks ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153D4941988-08-26026 August 1988 Summary of 880810 Meeting W/Util,Westinghouse & BNL Re Status of Studies on Bmi Thimble Tube Wear Problems. Discussions & Licensee Handout Withheld ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20151W5141988-04-21021 April 1988 Summary of Operating Reactors Events Meeting 88-016 on 880419 in Rockville,Md.List of Attendees & Viewgraphs Encl ML20237D8231987-12-17017 December 1987 Summary of 871030 Meeting W/Util Re Assessment of Util Compliance W/License Condition on Physical Security During Low Power Operation ML20237C6061987-12-14014 December 1987 Summary of 871202 Meeting W/Util & Bechtel Re Causes & Mods Relative to Pipe Failures in Auxiliary Feedwater Sys at Plant.List of Meeting Attendees & Util Handouts Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl 1999-09-24
[Table view] |
Text
,
- o g UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION l
%, ...../
SEP 2 31965 Docket Nos: 50-498 and 50-499 APPLICANT: Houston Lighting & Power Company FACILITY: South Texas Project, Units 1 and 2
SUBJECT:
SIMMARY OF MEETING HELD ON SEPTEMBER 17, 1985 TO DISCUSS FIRE PROTECTION AT CABLE CONCENTRATIONS The applicant requested this meeting to discuss with NRC staff a proposed approach to improving the fire protection provided in areas of cable concentrations. The attendees at the meeting are shown in Enclosure 1. No presared audio-visual aids were used.
Discussion:
The applicant reiterated their position that the fire protection measures currently described in the Fire Hazards Analysis Report are adequate.
However, additional measures have been considered to meet the staff guidelines. The applicant made the following commitments in the effort to meet the guidelines:
- 1. The applicant has connitted to provide fixed automatic fire suppression systems in the Cable Spreading Rooms and the Cable Vaults. These systems will be sprinkler heads mounted at the ceiling with full coverage of the room. The systems will be designed as Seismic Category II. The specific design criteria for these systems will be submitted in the near future.
- 2. The applicant connitted to provide additional infonnation regarding concentration of cable outside of the cable spreading rooms and the cable vaults which will identify the locations in the plant that have concentrations of more than six twenty-four inch wide cable trays in close proximity. For each such locations, the information will:
(1) describe the fixed automatic suppression system protecting the configuration or the physical attributes of the configuration which justify the omission of a Tixed automatic suppression systems.
gRloo10023 e50923 p ADOCK 05000498 PDR
{
(2) describe the physical attributes of the configuration that limit the accessibility of an effective hose stream or fire brigade and make manual suppression difficult.
/S/
N. P. Kadambi, Project Manager Licensing Branch No. 3 Division of Licensing
Enclosures:
As stated cc: See next page hk DL:LB#3 I
NPKadambi/es CMEB RFerguson Q(h#3 GEKr Ighton 9/y/85 9/;)/85 9/ /85 i
i
South Texas Mr. J. H. Goldberg William S. Jordan, III. Esq.
Gr-oup Vice President, Nuclear Harmon, Weiss & Jordan Houston Lighting and Power Company 2001 S Street, N.W.
P. O. Box 1700 Suite 430 Houston, Texas 77001 Washington, D. C. 20009 Brian Berwick, Esq.
Mr. J. T. Westermeir Assistant Attorney General Manager, South Texas Project Environmental Protection Division Houston Lighting and Power Company P. O. Box 12548 P. O. Box 1700 Capitol Station Houston, Texas 77001 Austin, Texas 78711 Mr. E. R. Brooks Mr. Claude E. Johnson, Resident
. Mr. R. L. Range Inspector / South Texas Project Central Power and Light Company c/o U. S. NRC P. O. Box 2121 P. O. Box 910 Corpus Christi, Texas 78403 Bay City, Texas 77414 Mr. H. L. Peterson Mr. Jonathan Davis Mr. G. Pokorny Assistant City Attorney City of Austin City of Austin P. O. Box 1088 P. O. Box 1088 Austin, Texas 78767 Austin, Texas 78767 Mr. J. B. Poston Mr. A. Von Rosenberg Ms. Pat Coy City Public Service Board Citizens Concerned About Nuclear P. O. Box 1771 Power San Antonio, Texas 78296 5106 Casa Oro San Antonio, Texas 78233 Jack R. Newman, Esq.
Newman & Holtzinger, P.C. Mr. Mark R. Wisenberg 1615 L Street, NW Manager, Nuclear Licensing Washington, DC 20036 Houston Lighting and Power Company P. O. Box 1700 1
Melbert Schwartz,Jr., Esq. Houston, Texas 77001 Baker & Botts One Shell Plaza Mr. Charles Halligan Houston, Texas 77002 Mr. Burton L. Lex Bechtel Corporation Mrs. Peggy Buchorn P. O. Box 2166 Executive Director Houston, Texas 77001 Citizens for Equitable Utilities, Inc.
Route 1, Box 1684 Brazoria, Texas 77422 l
Regional Administrator - Region IV U. S. Nuclear Regulatory Commission 2
611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 Mr. Lanny Sinkin Citizens Concerned About Nuclear Power 3022 Porter St. N. W. #304 Washington, D. C. 20008 Mr. S. Head
- HL&P Representative Suite 1309 7910 Woodmont Avenue Bethesda, Maryland 20814 i
t O
. Enclosure MEETING WITH SOUTH TEXAS PROJECT
/
FIRE PROTECTION IN CABLE CONCENTRATED AREAS SEPTEMBER 17, 1985 Nate Affiliation N. Prasad Kadambi NRC/NRR/DL Mark Wisenburg HL&P J. L. LaVallee- HL&P Jack Bailey HL&P Robert E. Sweeney EBASCO James T. Westerheter HL&P Erroll W. Dotson HL&P R. L. Ferguson NRC/NRR/DE K. S. West NRC/NRR/DE/ CME 8
1 W 2 31985 j.
MEETING
SUMMARY
DISTRIBUTION Docket,Ne(s):d 50-498/499 NRC POR Local POR NSIC PRC System LB3 Reading Attorney, OELD GWKnighton Project Manager NPKadambi JLee NRC PARTICIPANTS .
N. P. Kadambi R. L. Ferguson K. S. West bec: Applicant & Service List
.