MONTHYEARML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20206G4841999-04-30030 April 1999 Summary of 990315 Meeting with STP Nuclear Operating Co Re Util Submittal of Draft Request for Exemption from Special Treatment Requirements for Components That Are Low Safety Significant or non-risk Significant, ML20199D1931999-01-11011 January 1999 Summary of 981208 Meeting with STPNOC Re Status of Current & Future Licensing Actions & Activities.List of Meeting Attendees & Handout Provided by Licensee Encl ML20195G0641998-11-17017 November 1998 Summary of 980915 Meeting with STP Nuclear Operating Co Re Graded Quality Assurance Implementation & Challenges.List of Attendees & Handout Provided by Licensee Encl ML20155E1271998-11-0202 November 1998 Summary of 981008 Conference Call with Util to Discuss Course Action That Would Be Anticipated If Licensee Were to Submit risk-informed Inservice Insp &/Or risk-informed Inservice Testing Program ML20154J7961998-10-13013 October 1998 Summary of 980915 Meeting with Licensee Re risk-informed Operations at Stp.Copies of Slides Presented Encl ML20247L7411998-05-20020 May 1998 Summary of 980506 Meeting W/Util in Re Proposed Merger Between America Electric Power Co,Inc & Central & Southwest Corp (Csw).Meeting Attendees & Handout Provided by Csw Encl ML20217Q6491998-05-0505 May 1998 Summary of 980413 Meeting W/South Texas Project Nuclear Operating Company Re Current South Texas Project Improved TS Schedule.List of Meeting Attendees & Schedule Encl ML20217N0851998-04-0606 April 1998 Summary of 980303 Meeting W/South Texas Project Re long-term Resolution of Bulletin 88-08, Thermal Stresses in Piping Connected to Reactor Coolant System. Proprietary & non-proprietary Handouts Provided by Licensee Encl ML20199J3371998-02-0202 February 1998 Summary of 980121 Meeting W/Stp Nuclear Operating Co Re Schedule for NRC Review of STPNOC Application for Conversion to Improved Standard Ts.List of Attendees & Handout Provided by Licensee Encl ML20198K4781998-01-0606 January 1998 Summary of 971204 Meeting W/Licensee & Representatives from W Re Proposed 3 Volt Alternate Repair Criteria for Plants Unit 2 Sg.List of Attendees & Handout Encl ML20198G4601997-12-19019 December 1997 Summary of 971210 Meeting W/Licensee Re SG Replacement for Unit 1.List of Attendees & Handout Matls Provided by Licensee Encl ML20199E5771997-11-13013 November 1997 Trip Rept of 971105-06 Visit to Facility for Interviews in Preparation of SALP for Plant ML20212G5041997-10-29029 October 1997 Summary of 971002 Meeting W/Util in Rockville,Md to Discuss Staff Review Schedule for Plant Improved Std TS Conversion Amend.List of Attendees Encl ML20217E4511997-09-22022 September 1997 Summary of 970911 Meeting W/Util in Rockville,Md Re STP 3-train Design & Improved Std TSs Format ML20141C0811997-05-14014 May 1997 Summary of 970424 Meeting W/Util to Discuss Hl&P Plans Re Incomplete Control Rod Insertion at Stp,Units 1 & 2.Meeting Attendees & Handout Provided by Hl&P,Encl ML20140H7801997-05-0808 May 1997 Summary of 970421 Meeting W/Hl&P to Discuss Hl&P Proposed QA Program Change to Implement Graded QA ML20137Z3651997-04-22022 April 1997 Summary of 970403 Meeting W/Util in Rockville,Md to Discuss Staff Review of Licensee Pilot Submittal for Section 3.5 of Project Conversion Amend.List of Attendees & Staff Handouts Encl ML20137Q8641997-04-0909 April 1997 Summary of 970331 Meeting W/Util Re Util Graded QA Application.List of Attendees Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20133N3821997-01-17017 January 1997 Summary of 970109 Meeting W/Hl&P Re Response to NRC Bulletin 96-01, Control Rod Insertion Problems. List of Attendees & Licensee Handout Encl ML20133M2671997-01-15015 January 1997 Summary of 961212 Meeting W/Util Re Status of Staff Review of Licensee Request to Convert Plant TS to Improved Std TS Format.List of Attendees Encl ML20134L7841996-11-20020 November 1996 Summary of 961114 Meeting W/Hl&P in Rockville,Md to Discuss Status of NRC Review of Licensee Request to Convert STP TSs to Improved STS Format.List of Attendees Encl ML20206R4701996-11-0707 November 1996 Summary of 960821-22 Meetings with Hl&P in Wadsworth,Texas Re Graded Quality Assurance Program at Stp.List of Meeting Attendees for Initial Meeting,List of Meetings Held During Two Day Session & Handouts for Meetings Encl ML20128L2901996-10-0808 October 1996 Summary of 960916 Meeting W/Hl&P to Discuss Plans for SG Replacement at STP-1.List of Attendees & Handout Encl ML20059K1731994-01-27027 January 1994 Summary of 940121 Meeting W/Utils Re Results of Operational Readiness Assessment Team Insp at Plant.Various Deficiencies Noted.Media Representatives in Attendance ML20059F3491994-01-0606 January 1994 Summary of 931217 Meeting W/Hl&P Re Analysis Performed on Ecw Sys.W/Attendance List & Meeting Agenda ML20058L7311993-12-13013 December 1993 Summary of 931108-09 Meeting W/Licensee in Rockville,Md Re Resolution of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Agenda & List of Attendees Encl ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062B3771990-10-15015 October 1990 Summary of 900919 Meeting W/Util & Sandia Re Fire Protection Portion of Probability Safety Assessment ML20056A0011990-07-27027 July 1990 Summary of 900530-31 Meeting W/Sandia Natl Labs & Util Re PRA Review.Meeting Attendees Listed in Encl 1 ML20058L0521990-07-19019 July 1990 Summary of 891128 & 29 Meetings W/Util,Sandia & Sea,Inc Re Plant Probability & Safety Assessment.List of Attendees & Sandia Questions W/Licensee Answers Encl ML20246P6111989-09-0505 September 1989 Summary of 881130 Meeting W/Util at Plant Re Ability of Pressurizer Surge Line to Withstand Effects of Thermal Stratification.Discussions Concentrated in Areas of Design Documentation,Thermal Hydraulics & Stratification ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245J4261989-08-11011 August 1989 Summary of 890808 Meeting W/Util & Sandia at Sandia Re PRA Study for Plant.Attendance List & Viewgraphs Encl ML20246P1811989-05-0909 May 1989 Summary of 890506 Meeting W/Utils & Westinghouse Re Licensee Decision to Remove Remainder of Excessive Cooldown Protection Circuitry & Amend to Tech Specs.List of Meeting Attendees & Licensee Meeting Handout Encl NUREG-0781, Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl1989-05-0909 May 1989 Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl ML20246L2621989-05-0909 May 1989 Summary of 880517 Meeting W/Util & Westinghouse Re Results of bottom-mounted Instrumentation Thimble Tube Insp. List of Meeting Attendees.Presentation Matl Handout Withheld ML20245F5081989-04-25025 April 1989 Summary of 890127 Meeting W/Util Re Status of Licensee Pra. List of Attendees,Agenda & Util Presentation Slides Encl ML20196E2621988-12-0202 December 1988 Summary of 881129 Meeting W/Util & Newman & Holtzinger Re Readiness for Low Power License.List of Attendees & Viewgraphs Encl ML20204D5431988-10-12012 October 1988 Summary of 880908 Meeting W/Util in Arlington,Tx Re Schedule for Completion of Certain Security Tasks ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153D4941988-08-26026 August 1988 Summary of 880810 Meeting W/Util,Westinghouse & BNL Re Status of Studies on Bmi Thimble Tube Wear Problems. Discussions & Licensee Handout Withheld ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20151W5141988-04-21021 April 1988 Summary of Operating Reactors Events Meeting 88-016 on 880419 in Rockville,Md.List of Attendees & Viewgraphs Encl ML20237D8231987-12-17017 December 1987 Summary of 871030 Meeting W/Util Re Assessment of Util Compliance W/License Condition on Physical Security During Low Power Operation ML20237C6061987-12-14014 December 1987 Summary of 871202 Meeting W/Util & Bechtel Re Causes & Mods Relative to Pipe Failures in Auxiliary Feedwater Sys at Plant.List of Meeting Attendees & Util Handouts Encl 1999-09-24
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20206G4841999-04-30030 April 1999 Summary of 990315 Meeting with STP Nuclear Operating Co Re Util Submittal of Draft Request for Exemption from Special Treatment Requirements for Components That Are Low Safety Significant or non-risk Significant, ML20199D1931999-01-11011 January 1999 Summary of 981208 Meeting with STPNOC Re Status of Current & Future Licensing Actions & Activities.List of Meeting Attendees & Handout Provided by Licensee Encl ML20195G0641998-11-17017 November 1998 Summary of 980915 Meeting with STP Nuclear Operating Co Re Graded Quality Assurance Implementation & Challenges.List of Attendees & Handout Provided by Licensee Encl ML20155E1271998-11-0202 November 1998 Summary of 981008 Conference Call with Util to Discuss Course Action That Would Be Anticipated If Licensee Were to Submit risk-informed Inservice Insp &/Or risk-informed Inservice Testing Program ML20154J7961998-10-13013 October 1998 Summary of 980915 Meeting with Licensee Re risk-informed Operations at Stp.Copies of Slides Presented Encl ML20247L7411998-05-20020 May 1998 Summary of 980506 Meeting W/Util in Re Proposed Merger Between America Electric Power Co,Inc & Central & Southwest Corp (Csw).Meeting Attendees & Handout Provided by Csw Encl ML20217Q6491998-05-0505 May 1998 Summary of 980413 Meeting W/South Texas Project Nuclear Operating Company Re Current South Texas Project Improved TS Schedule.List of Meeting Attendees & Schedule Encl ML20217N0851998-04-0606 April 1998 Summary of 980303 Meeting W/South Texas Project Re long-term Resolution of Bulletin 88-08, Thermal Stresses in Piping Connected to Reactor Coolant System. Proprietary & non-proprietary Handouts Provided by Licensee Encl ML20199J3371998-02-0202 February 1998 Summary of 980121 Meeting W/Stp Nuclear Operating Co Re Schedule for NRC Review of STPNOC Application for Conversion to Improved Standard Ts.List of Attendees & Handout Provided by Licensee Encl ML20198K4781998-01-0606 January 1998 Summary of 971204 Meeting W/Licensee & Representatives from W Re Proposed 3 Volt Alternate Repair Criteria for Plants Unit 2 Sg.List of Attendees & Handout Encl ML20198G4601997-12-19019 December 1997 Summary of 971210 Meeting W/Licensee Re SG Replacement for Unit 1.List of Attendees & Handout Matls Provided by Licensee Encl ML20212G5041997-10-29029 October 1997 Summary of 971002 Meeting W/Util in Rockville,Md to Discuss Staff Review Schedule for Plant Improved Std TS Conversion Amend.List of Attendees Encl ML20217E4511997-09-22022 September 1997 Summary of 970911 Meeting W/Util in Rockville,Md Re STP 3-train Design & Improved Std TSs Format ML20141C0811997-05-14014 May 1997 Summary of 970424 Meeting W/Util to Discuss Hl&P Plans Re Incomplete Control Rod Insertion at Stp,Units 1 & 2.Meeting Attendees & Handout Provided by Hl&P,Encl ML20140H7801997-05-0808 May 1997 Summary of 970421 Meeting W/Hl&P to Discuss Hl&P Proposed QA Program Change to Implement Graded QA ML20137Z3651997-04-22022 April 1997 Summary of 970403 Meeting W/Util in Rockville,Md to Discuss Staff Review of Licensee Pilot Submittal for Section 3.5 of Project Conversion Amend.List of Attendees & Staff Handouts Encl ML20137Q8641997-04-0909 April 1997 Summary of 970331 Meeting W/Util Re Util Graded QA Application.List of Attendees Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20133N3821997-01-17017 January 1997 Summary of 970109 Meeting W/Hl&P Re Response to NRC Bulletin 96-01, Control Rod Insertion Problems. List of Attendees & Licensee Handout Encl ML20133M2671997-01-15015 January 1997 Summary of 961212 Meeting W/Util Re Status of Staff Review of Licensee Request to Convert Plant TS to Improved Std TS Format.List of Attendees Encl ML20134L7841996-11-20020 November 1996 Summary of 961114 Meeting W/Hl&P in Rockville,Md to Discuss Status of NRC Review of Licensee Request to Convert STP TSs to Improved STS Format.List of Attendees Encl ML20206R4701996-11-0707 November 1996 Summary of 960821-22 Meetings with Hl&P in Wadsworth,Texas Re Graded Quality Assurance Program at Stp.List of Meeting Attendees for Initial Meeting,List of Meetings Held During Two Day Session & Handouts for Meetings Encl ML20128L2901996-10-0808 October 1996 Summary of 960916 Meeting W/Hl&P to Discuss Plans for SG Replacement at STP-1.List of Attendees & Handout Encl ML20059K1731994-01-27027 January 1994 Summary of 940121 Meeting W/Utils Re Results of Operational Readiness Assessment Team Insp at Plant.Various Deficiencies Noted.Media Representatives in Attendance ML20059F3491994-01-0606 January 1994 Summary of 931217 Meeting W/Hl&P Re Analysis Performed on Ecw Sys.W/Attendance List & Meeting Agenda ML20058L7311993-12-13013 December 1993 Summary of 931108-09 Meeting W/Licensee in Rockville,Md Re Resolution of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Agenda & List of Attendees Encl ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062B3771990-10-15015 October 1990 Summary of 900919 Meeting W/Util & Sandia Re Fire Protection Portion of Probability Safety Assessment ML20056A0011990-07-27027 July 1990 Summary of 900530-31 Meeting W/Sandia Natl Labs & Util Re PRA Review.Meeting Attendees Listed in Encl 1 ML20058L0521990-07-19019 July 1990 Summary of 891128 & 29 Meetings W/Util,Sandia & Sea,Inc Re Plant Probability & Safety Assessment.List of Attendees & Sandia Questions W/Licensee Answers Encl ML20246P6111989-09-0505 September 1989 Summary of 881130 Meeting W/Util at Plant Re Ability of Pressurizer Surge Line to Withstand Effects of Thermal Stratification.Discussions Concentrated in Areas of Design Documentation,Thermal Hydraulics & Stratification ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245J4261989-08-11011 August 1989 Summary of 890808 Meeting W/Util & Sandia at Sandia Re PRA Study for Plant.Attendance List & Viewgraphs Encl ML20246L2621989-05-0909 May 1989 Summary of 880517 Meeting W/Util & Westinghouse Re Results of bottom-mounted Instrumentation Thimble Tube Insp. List of Meeting Attendees.Presentation Matl Handout Withheld ML20246P1811989-05-0909 May 1989 Summary of 890506 Meeting W/Utils & Westinghouse Re Licensee Decision to Remove Remainder of Excessive Cooldown Protection Circuitry & Amend to Tech Specs.List of Meeting Attendees & Licensee Meeting Handout Encl NUREG-0781, Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl1989-05-0909 May 1989 Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl ML20245F5081989-04-25025 April 1989 Summary of 890127 Meeting W/Util Re Status of Licensee Pra. List of Attendees,Agenda & Util Presentation Slides Encl ML20196E2621988-12-0202 December 1988 Summary of 881129 Meeting W/Util & Newman & Holtzinger Re Readiness for Low Power License.List of Attendees & Viewgraphs Encl ML20204D5431988-10-12012 October 1988 Summary of 880908 Meeting W/Util in Arlington,Tx Re Schedule for Completion of Certain Security Tasks ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153D4941988-08-26026 August 1988 Summary of 880810 Meeting W/Util,Westinghouse & BNL Re Status of Studies on Bmi Thimble Tube Wear Problems. Discussions & Licensee Handout Withheld ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20151W5141988-04-21021 April 1988 Summary of Operating Reactors Events Meeting 88-016 on 880419 in Rockville,Md.List of Attendees & Viewgraphs Encl ML20237D8231987-12-17017 December 1987 Summary of 871030 Meeting W/Util Re Assessment of Util Compliance W/License Condition on Physical Security During Low Power Operation ML20237C6061987-12-14014 December 1987 Summary of 871202 Meeting W/Util & Bechtel Re Causes & Mods Relative to Pipe Failures in Auxiliary Feedwater Sys at Plant.List of Meeting Attendees & Util Handouts Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl 1999-09-24
[Table view] |
Text
'~
t'
- 'o UNITED STATES
[
g
~ ,j
- E NUCLEAR REGULATORY COMMISSION WASHING TON, D. C. 20555 o #
December 13, 1993
\ . . . . + j# ,
Docket Nos. 50-498 and 50-499 LICENSEE: Houston Lighting and Power Cc:::pany (HL&P)
FACILITY: South Texas Project, Units 1 and 2
SUBJECT:
SUMMARY
OF MEETING BETWEEN HOUSTON LIGHTING AND POWER, WESTINGHOUSE AND NRC TO DISCUSS RESOLUTION OF NRC BULLETIN 88-08, " THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMS" The subject meeting was held on November 8 and 9, 1993. Enclosure 1 is the '
meeting agenda used. The list of attendees for each day is provided in Enclosure 2.
BACKGROUND On June 22, 1988, NRC issued Bulletin 88-08 requesting that each licensee (1) review the reactor coolant system (RCS) to identify any connected, unisolable piping that could be subjected to temperature distributions which would result in unacceptable thermal stresses, and (2) take action, where such piping is identified, to ensure that the piping will not be subjected to unacceptable thermal stresses. Supplement 1 of the Balletin, dated June 24, 1988, expanded the bulletin to include examinations of high stress locations including the base metal, as appropriate.
In a letter on November 20, 1989, Houston Lighting and Power Company, the licensee for South Texas Project (STP), stated that it had installed instrumentation at STP Unit I to monitor temperatures in unisolable sections of piping connected to the reactor coolant system (RCS), in accordance with Action 3 of Bulletin 88-08. By letter dated September 21, 1990, HL&P reported that an engineering evaluation (Westinghouse Electric Corporation report WCAP-12598) had determined that the ASME Section III, Class I design fatigue limit was satisfied for the normal charging, alternative charging, and auxiliary spray lines, under the assumption that the leakage continued over the life of the plant. Based on the evaluation, HL&P decided to remove the temperature monitoring instrumentation requested by Action 3. By letter of September 23, '
1992, NRC requested HL&P for additional information (RAI) regarding their response to Action 3 of Bulletin 88-08. By letter dated December 1, 1992, it was decided that a meeting to discuss the data, as well as the Westinghouse ;
conclusions would be beneficial. ,
l MC Em C&HB CWV l 9312170163 931213 gDR ADOCK 0500 8 jo j m
MEETING
SUMMARY
At the November 8 and 9, 1993, meeting, the licensee and representatives from Westinghouse and Electric Power Research Institute (EPRI) informed the NRC staff of the progress made in addressing the issue of Bulletin 88-08 for STP.
An EPRI representative gave a brief overview of the objectives, program contents, and future plans of their program on thermal stratification, cycling and striping (TASCS). Westinghouse personnel presented a discussion of the ,
TASCS and Mitsubishi Heavy Industries (MHI) testing programs, including a brief description of the low temperature turbulent penetration test program, and the low and high temperature stratification test programs. They continued with a presentation on TASCS evaluation methodology as it pertained to STP.
The areas covered included height of stratified flows, heat transfer of stratified flows, thermal cycling zone, turbulent penetration length and thermal striping.
The licensee and its contractors presented the results of HL&P's monitoring and analysis efforts. This consisted of a description of the monitoring program, method of analysis, the residual heat removal analysis, the charging and alternate charging analysis, and the auxiliary spray line analysis. These -
lines were originally analyzed in 1990, and were subsequently evaluated using the current TASCS methodology. Both the 1990 analysis results and the TASCS methodology results were presented. An additional presentation on charging line stratification loading was provided to help answer questions posed by the NRC. The meeting concluded with a tour of the Westinghouse Test facilities and a discussion summarizing NRC concerns, and short- and long-term actions required by the licensee.
Because the discussions involved proprietary information, no information is included with this meeting summary. The licensee will comply with the requirements of 10 CFR 2.790 to provide proprietary and non-proprietary versions of the meeting handouts together with an affidavit as soon as the -
proprietary and non-proprietary versions have been prepared.
A resolution to Bulletin 88-08 was agreed upon. Since the EPRI TASCS methodology final report has not been published or reviewed, the staff decided not to make any determinatien regarding the TASCS methodology or turbulence penetration. Rather, the staff stated that if the fatigue life of critical components could be shown to be reasonably long, assuming worst-case expected temperature distribution and optimum cycling period, the licensee will have provided an acceptable plant-specific resolution to the bulletin. The licensee agreed to provide the NRC with the appropriate fatigue evaluations by December 1, 1993, which, following staff's review, will allow closure of Bulletin 88-08 for STP. The licensee also committed to provide a
6 f
supplement to WCAP-12598 (Proprietary) and WCAP-12646 (Nonproprietary), "NRC Bulletin 88-08, Evolution of Auxiliary Piping for South Texas Units 1 and 2", I that includes the new information presented during the meeting at a later i date. >
Original Signed By: -
Lawrence E. Kokajko, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Enclosures:
DISTRIBUTION '
- 1. Meeting Agenda Docket File ' OGC
- 2. Attendance List NRC PDR EJordan .
Local PDR ACRS (10)
TMurley WJohnson, RGN-IV FMiraglia NRC Participants JCallan EPeyton JRoe TBergman EAdensam PDIV-2 R/F F
i F
i t
II E PDIV-2/LA PDIV-2/ INT. Phlf-2,4RM PDIV-2fD r NAME (p (n $Wjtk rg [ajko:RK SBlac[
o^tE ITKdb/93 11/ 4 /93 IS/ Ci /93 11/ 1 /93 / / t ewy (Ye2)/No (YeDNo
'~'
/be 40 Yes/f6)
'~
Yes/No 0FFICIAL RECORD COPY FILENAME: G:\ BULL 8808.MTG
.. . i cc w/ enclosures:
Mr. David P. Loveless Jack R. Newman, Esq.
Senior Resident inspector Newman & Holtzinger, P.C. ,
U.S. Nuclear Regulatory Commission 1615 L Street, N.W.
P. O. Box 910 Washington, D.C. 20036 Bay City, Texas 77414
-Licensing Representative Mr. J. C. Lanier/M. B. Lee Houston Lighting and Power Company City of Austin Suite 610 Electric Utility Department Three Metro Center 721 Barton Springs Road Bethesda, Maryland 20814 Austin, Texas 78704 Nreau of Radiation Control Mr. K. J. Fiedler State of Texas Mr. M. T. Hardt 1101 West 49th Street City Public Service Board Austin, Texas 78756 P. O. Box 1771 San Antonio, Texas 78290 Pufus S. Scott Associate Gene *al Counsel Mr. G. E. Vaughn Houston Lighting and Power Company Mr. T. M. Puckett P. O. Box 61867 Central Power and Light Company Houston, Texas 77208 P. O. Box 2121 Corpus Christi, Texas 78403 Mr. William T. Cottle Group Vice-President, Nuclear INPO Houston Lighting & Power Company Records Center South Texas Project Electric 700 Galleria Parkway Generating Station Atlanta, Georgia 30339-3064 Post Office Box 289 Wadsworth, Texas 77483 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. Joseph M. Hendrie 50 Bellport Lane Bellport, New York 11713 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, Texas 77414 Mr. James J. Sheppard General Manager, Nuclear Licensing Houston Lighting and Power Company ,
P. O. Box 289 ;
Wadsworth, Texas 77483 i
l
Enclosure 1 Acenda for Meetino Between i HL&P. Westinohouse. and NRC in Recard to Bulletin 88-08 t
Monday. November 8. 1993 1:30 pm Start of Meeting and Introductions
- NRC & Contractual support personnel (BNL and subcontractor)
- Houston Lighting and Power Company personnel
- Westinghouse personnel
- Others (e.g., EPRI) 1:45 pm ~ Meeting Objectives
- 2
- 00 pm ~ Discussion of Phenomena (PROPRIETARY)
- TASCS testing program
- MHI testing program
- Videotape 3:00 pm - TASCS Evaluation Methodology (PROPRIETARY)
- Note: Primary focus on South Texas Project, no'. generic
- Height of stratified flows
- Heat transfer of stratified flows
- Thermal cycling zone
- Turbulent penetration length
- Heat transfer of uniform flows 4:30 pm - Discussion and Question / Answer Session (PROPRIETARY) 6:30 PM - Adjourn ;
Tuesday. November 9. 1993 ,
8:30 am Reconvene Meeting (PROPRIETARY) :
- Continuation of discussion from previous day, if necessary 9:00 am ~ Review of HL&P Monitoring and Analysis (PROPRIETARY)
- Monitoring program
- Residual heat removal analysis
- Charging and alternate charging analysis
- Auxiliary spray line analysis 11:30 am - Lunch 1
12:30 pm ~ Discussion and Question / Answer Session (PROPRIETARY) ,
- Continuation of morning session, if necessary
- Time available for independent study, if necessary 4:00 pm ~ Tour of Westinghouse Test Facilities 6:00 pm ~ Summary and Conclusion
- Follow-up actions and documentation
- Final Remarks 6:30 pm Adjourn Meeting !
f i
Enclosure 2 Atter, dance List Monday. November 8. 1993 NRC Lawrence E. Kokajko Suzie M. Wittenberg Mark Hartzman Terence L. Chan Westinahouse Seth Swamy David H. Roarty Pat Strauch i T.H. Liu Mary Ann Sinwell Bradley F. Maurer David P. Dominicis R. Michael Roidt Houston Liahtina and Power Comoany H. Ray Pate Patel Sam Michael Pacy fEl Jong H. Kim Brookhaven National Lab (NRC contractor)
Giuliano DeGrassi Georaia Tech (NRC contractor)
Prateen V. Desai I
2-Tuesd8Y. November 9. 1993 liRC Lawrence E. Kokajko Suzie M. Wittenberg Mark Hartzman Terence L. Chan Westinahouse Seth Swamy David H. Roarty Pat Strauch T.H. Liu Mary Ann Sinwell Bradley F. Maurer Houston Liahtino and Power Company H. Ray Pate Patel Sam ;
Michael Pacy IfR1 .
Jong H. Kim Brookhaven National Lab (NRC contractor)
Giuliano DeGrassi Georaia Tech (NRC contractor)
Prateen V. Desai I
,