MONTHYEARML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20206G4841999-04-30030 April 1999 Summary of 990315 Meeting with STP Nuclear Operating Co Re Util Submittal of Draft Request for Exemption from Special Treatment Requirements for Components That Are Low Safety Significant or non-risk Significant, ML20199D1931999-01-11011 January 1999 Summary of 981208 Meeting with STPNOC Re Status of Current & Future Licensing Actions & Activities.List of Meeting Attendees & Handout Provided by Licensee Encl ML20195G0641998-11-17017 November 1998 Summary of 980915 Meeting with STP Nuclear Operating Co Re Graded Quality Assurance Implementation & Challenges.List of Attendees & Handout Provided by Licensee Encl ML20155E1271998-11-0202 November 1998 Summary of 981008 Conference Call with Util to Discuss Course Action That Would Be Anticipated If Licensee Were to Submit risk-informed Inservice Insp &/Or risk-informed Inservice Testing Program ML20154J7961998-10-13013 October 1998 Summary of 980915 Meeting with Licensee Re risk-informed Operations at Stp.Copies of Slides Presented Encl ML20247L7411998-05-20020 May 1998 Summary of 980506 Meeting W/Util in Re Proposed Merger Between America Electric Power Co,Inc & Central & Southwest Corp (Csw).Meeting Attendees & Handout Provided by Csw Encl ML20217Q6491998-05-0505 May 1998 Summary of 980413 Meeting W/South Texas Project Nuclear Operating Company Re Current South Texas Project Improved TS Schedule.List of Meeting Attendees & Schedule Encl ML20217N0851998-04-0606 April 1998 Summary of 980303 Meeting W/South Texas Project Re long-term Resolution of Bulletin 88-08, Thermal Stresses in Piping Connected to Reactor Coolant System. Proprietary & non-proprietary Handouts Provided by Licensee Encl ML20199J3371998-02-0202 February 1998 Summary of 980121 Meeting W/Stp Nuclear Operating Co Re Schedule for NRC Review of STPNOC Application for Conversion to Improved Standard Ts.List of Attendees & Handout Provided by Licensee Encl ML20198K4781998-01-0606 January 1998 Summary of 971204 Meeting W/Licensee & Representatives from W Re Proposed 3 Volt Alternate Repair Criteria for Plants Unit 2 Sg.List of Attendees & Handout Encl ML20198G4601997-12-19019 December 1997 Summary of 971210 Meeting W/Licensee Re SG Replacement for Unit 1.List of Attendees & Handout Matls Provided by Licensee Encl ML20199E5771997-11-13013 November 1997 Trip Rept of 971105-06 Visit to Facility for Interviews in Preparation of SALP for Plant ML20212G5041997-10-29029 October 1997 Summary of 971002 Meeting W/Util in Rockville,Md to Discuss Staff Review Schedule for Plant Improved Std TS Conversion Amend.List of Attendees Encl ML20217E4511997-09-22022 September 1997 Summary of 970911 Meeting W/Util in Rockville,Md Re STP 3-train Design & Improved Std TSs Format ML20141C0811997-05-14014 May 1997 Summary of 970424 Meeting W/Util to Discuss Hl&P Plans Re Incomplete Control Rod Insertion at Stp,Units 1 & 2.Meeting Attendees & Handout Provided by Hl&P,Encl ML20140H7801997-05-0808 May 1997 Summary of 970421 Meeting W/Hl&P to Discuss Hl&P Proposed QA Program Change to Implement Graded QA ML20137Z3651997-04-22022 April 1997 Summary of 970403 Meeting W/Util in Rockville,Md to Discuss Staff Review of Licensee Pilot Submittal for Section 3.5 of Project Conversion Amend.List of Attendees & Staff Handouts Encl ML20137Q8641997-04-0909 April 1997 Summary of 970331 Meeting W/Util Re Util Graded QA Application.List of Attendees Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20133N3821997-01-17017 January 1997 Summary of 970109 Meeting W/Hl&P Re Response to NRC Bulletin 96-01, Control Rod Insertion Problems. List of Attendees & Licensee Handout Encl ML20133M2671997-01-15015 January 1997 Summary of 961212 Meeting W/Util Re Status of Staff Review of Licensee Request to Convert Plant TS to Improved Std TS Format.List of Attendees Encl ML20134L7841996-11-20020 November 1996 Summary of 961114 Meeting W/Hl&P in Rockville,Md to Discuss Status of NRC Review of Licensee Request to Convert STP TSs to Improved STS Format.List of Attendees Encl ML20206R4701996-11-0707 November 1996 Summary of 960821-22 Meetings with Hl&P in Wadsworth,Texas Re Graded Quality Assurance Program at Stp.List of Meeting Attendees for Initial Meeting,List of Meetings Held During Two Day Session & Handouts for Meetings Encl ML20128L2901996-10-0808 October 1996 Summary of 960916 Meeting W/Hl&P to Discuss Plans for SG Replacement at STP-1.List of Attendees & Handout Encl ML20059K1731994-01-27027 January 1994 Summary of 940121 Meeting W/Utils Re Results of Operational Readiness Assessment Team Insp at Plant.Various Deficiencies Noted.Media Representatives in Attendance ML20059F3491994-01-0606 January 1994 Summary of 931217 Meeting W/Hl&P Re Analysis Performed on Ecw Sys.W/Attendance List & Meeting Agenda ML20058L7311993-12-13013 December 1993 Summary of 931108-09 Meeting W/Licensee in Rockville,Md Re Resolution of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Agenda & List of Attendees Encl ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062B3771990-10-15015 October 1990 Summary of 900919 Meeting W/Util & Sandia Re Fire Protection Portion of Probability Safety Assessment ML20056A0011990-07-27027 July 1990 Summary of 900530-31 Meeting W/Sandia Natl Labs & Util Re PRA Review.Meeting Attendees Listed in Encl 1 ML20058L0521990-07-19019 July 1990 Summary of 891128 & 29 Meetings W/Util,Sandia & Sea,Inc Re Plant Probability & Safety Assessment.List of Attendees & Sandia Questions W/Licensee Answers Encl ML20246P6111989-09-0505 September 1989 Summary of 881130 Meeting W/Util at Plant Re Ability of Pressurizer Surge Line to Withstand Effects of Thermal Stratification.Discussions Concentrated in Areas of Design Documentation,Thermal Hydraulics & Stratification ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245J4261989-08-11011 August 1989 Summary of 890808 Meeting W/Util & Sandia at Sandia Re PRA Study for Plant.Attendance List & Viewgraphs Encl ML20246P1811989-05-0909 May 1989 Summary of 890506 Meeting W/Utils & Westinghouse Re Licensee Decision to Remove Remainder of Excessive Cooldown Protection Circuitry & Amend to Tech Specs.List of Meeting Attendees & Licensee Meeting Handout Encl NUREG-0781, Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl1989-05-0909 May 1989 Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl ML20246L2621989-05-0909 May 1989 Summary of 880517 Meeting W/Util & Westinghouse Re Results of bottom-mounted Instrumentation Thimble Tube Insp. List of Meeting Attendees.Presentation Matl Handout Withheld ML20245F5081989-04-25025 April 1989 Summary of 890127 Meeting W/Util Re Status of Licensee Pra. List of Attendees,Agenda & Util Presentation Slides Encl ML20196E2621988-12-0202 December 1988 Summary of 881129 Meeting W/Util & Newman & Holtzinger Re Readiness for Low Power License.List of Attendees & Viewgraphs Encl ML20204D5431988-10-12012 October 1988 Summary of 880908 Meeting W/Util in Arlington,Tx Re Schedule for Completion of Certain Security Tasks ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153D4941988-08-26026 August 1988 Summary of 880810 Meeting W/Util,Westinghouse & BNL Re Status of Studies on Bmi Thimble Tube Wear Problems. Discussions & Licensee Handout Withheld ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20151W5141988-04-21021 April 1988 Summary of Operating Reactors Events Meeting 88-016 on 880419 in Rockville,Md.List of Attendees & Viewgraphs Encl ML20237D8231987-12-17017 December 1987 Summary of 871030 Meeting W/Util Re Assessment of Util Compliance W/License Condition on Physical Security During Low Power Operation ML20237C6061987-12-14014 December 1987 Summary of 871202 Meeting W/Util & Bechtel Re Causes & Mods Relative to Pipe Failures in Auxiliary Feedwater Sys at Plant.List of Meeting Attendees & Util Handouts Encl 1999-09-24
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20206G4841999-04-30030 April 1999 Summary of 990315 Meeting with STP Nuclear Operating Co Re Util Submittal of Draft Request for Exemption from Special Treatment Requirements for Components That Are Low Safety Significant or non-risk Significant, ML20199D1931999-01-11011 January 1999 Summary of 981208 Meeting with STPNOC Re Status of Current & Future Licensing Actions & Activities.List of Meeting Attendees & Handout Provided by Licensee Encl ML20195G0641998-11-17017 November 1998 Summary of 980915 Meeting with STP Nuclear Operating Co Re Graded Quality Assurance Implementation & Challenges.List of Attendees & Handout Provided by Licensee Encl ML20155E1271998-11-0202 November 1998 Summary of 981008 Conference Call with Util to Discuss Course Action That Would Be Anticipated If Licensee Were to Submit risk-informed Inservice Insp &/Or risk-informed Inservice Testing Program ML20154J7961998-10-13013 October 1998 Summary of 980915 Meeting with Licensee Re risk-informed Operations at Stp.Copies of Slides Presented Encl ML20247L7411998-05-20020 May 1998 Summary of 980506 Meeting W/Util in Re Proposed Merger Between America Electric Power Co,Inc & Central & Southwest Corp (Csw).Meeting Attendees & Handout Provided by Csw Encl ML20217Q6491998-05-0505 May 1998 Summary of 980413 Meeting W/South Texas Project Nuclear Operating Company Re Current South Texas Project Improved TS Schedule.List of Meeting Attendees & Schedule Encl ML20217N0851998-04-0606 April 1998 Summary of 980303 Meeting W/South Texas Project Re long-term Resolution of Bulletin 88-08, Thermal Stresses in Piping Connected to Reactor Coolant System. Proprietary & non-proprietary Handouts Provided by Licensee Encl ML20199J3371998-02-0202 February 1998 Summary of 980121 Meeting W/Stp Nuclear Operating Co Re Schedule for NRC Review of STPNOC Application for Conversion to Improved Standard Ts.List of Attendees & Handout Provided by Licensee Encl ML20198K4781998-01-0606 January 1998 Summary of 971204 Meeting W/Licensee & Representatives from W Re Proposed 3 Volt Alternate Repair Criteria for Plants Unit 2 Sg.List of Attendees & Handout Encl ML20198G4601997-12-19019 December 1997 Summary of 971210 Meeting W/Licensee Re SG Replacement for Unit 1.List of Attendees & Handout Matls Provided by Licensee Encl ML20212G5041997-10-29029 October 1997 Summary of 971002 Meeting W/Util in Rockville,Md to Discuss Staff Review Schedule for Plant Improved Std TS Conversion Amend.List of Attendees Encl ML20217E4511997-09-22022 September 1997 Summary of 970911 Meeting W/Util in Rockville,Md Re STP 3-train Design & Improved Std TSs Format ML20141C0811997-05-14014 May 1997 Summary of 970424 Meeting W/Util to Discuss Hl&P Plans Re Incomplete Control Rod Insertion at Stp,Units 1 & 2.Meeting Attendees & Handout Provided by Hl&P,Encl ML20140H7801997-05-0808 May 1997 Summary of 970421 Meeting W/Hl&P to Discuss Hl&P Proposed QA Program Change to Implement Graded QA ML20137Z3651997-04-22022 April 1997 Summary of 970403 Meeting W/Util in Rockville,Md to Discuss Staff Review of Licensee Pilot Submittal for Section 3.5 of Project Conversion Amend.List of Attendees & Staff Handouts Encl ML20137Q8641997-04-0909 April 1997 Summary of 970331 Meeting W/Util Re Util Graded QA Application.List of Attendees Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20133N3821997-01-17017 January 1997 Summary of 970109 Meeting W/Hl&P Re Response to NRC Bulletin 96-01, Control Rod Insertion Problems. List of Attendees & Licensee Handout Encl ML20133M2671997-01-15015 January 1997 Summary of 961212 Meeting W/Util Re Status of Staff Review of Licensee Request to Convert Plant TS to Improved Std TS Format.List of Attendees Encl ML20134L7841996-11-20020 November 1996 Summary of 961114 Meeting W/Hl&P in Rockville,Md to Discuss Status of NRC Review of Licensee Request to Convert STP TSs to Improved STS Format.List of Attendees Encl ML20206R4701996-11-0707 November 1996 Summary of 960821-22 Meetings with Hl&P in Wadsworth,Texas Re Graded Quality Assurance Program at Stp.List of Meeting Attendees for Initial Meeting,List of Meetings Held During Two Day Session & Handouts for Meetings Encl ML20128L2901996-10-0808 October 1996 Summary of 960916 Meeting W/Hl&P to Discuss Plans for SG Replacement at STP-1.List of Attendees & Handout Encl ML20059K1731994-01-27027 January 1994 Summary of 940121 Meeting W/Utils Re Results of Operational Readiness Assessment Team Insp at Plant.Various Deficiencies Noted.Media Representatives in Attendance ML20059F3491994-01-0606 January 1994 Summary of 931217 Meeting W/Hl&P Re Analysis Performed on Ecw Sys.W/Attendance List & Meeting Agenda ML20058L7311993-12-13013 December 1993 Summary of 931108-09 Meeting W/Licensee in Rockville,Md Re Resolution of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Agenda & List of Attendees Encl ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062B3771990-10-15015 October 1990 Summary of 900919 Meeting W/Util & Sandia Re Fire Protection Portion of Probability Safety Assessment ML20056A0011990-07-27027 July 1990 Summary of 900530-31 Meeting W/Sandia Natl Labs & Util Re PRA Review.Meeting Attendees Listed in Encl 1 ML20058L0521990-07-19019 July 1990 Summary of 891128 & 29 Meetings W/Util,Sandia & Sea,Inc Re Plant Probability & Safety Assessment.List of Attendees & Sandia Questions W/Licensee Answers Encl ML20246P6111989-09-0505 September 1989 Summary of 881130 Meeting W/Util at Plant Re Ability of Pressurizer Surge Line to Withstand Effects of Thermal Stratification.Discussions Concentrated in Areas of Design Documentation,Thermal Hydraulics & Stratification ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245J4261989-08-11011 August 1989 Summary of 890808 Meeting W/Util & Sandia at Sandia Re PRA Study for Plant.Attendance List & Viewgraphs Encl ML20246L2621989-05-0909 May 1989 Summary of 880517 Meeting W/Util & Westinghouse Re Results of bottom-mounted Instrumentation Thimble Tube Insp. List of Meeting Attendees.Presentation Matl Handout Withheld ML20246P1811989-05-0909 May 1989 Summary of 890506 Meeting W/Utils & Westinghouse Re Licensee Decision to Remove Remainder of Excessive Cooldown Protection Circuitry & Amend to Tech Specs.List of Meeting Attendees & Licensee Meeting Handout Encl NUREG-0781, Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl1989-05-0909 May 1989 Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl ML20245F5081989-04-25025 April 1989 Summary of 890127 Meeting W/Util Re Status of Licensee Pra. List of Attendees,Agenda & Util Presentation Slides Encl ML20196E2621988-12-0202 December 1988 Summary of 881129 Meeting W/Util & Newman & Holtzinger Re Readiness for Low Power License.List of Attendees & Viewgraphs Encl ML20204D5431988-10-12012 October 1988 Summary of 880908 Meeting W/Util in Arlington,Tx Re Schedule for Completion of Certain Security Tasks ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153D4941988-08-26026 August 1988 Summary of 880810 Meeting W/Util,Westinghouse & BNL Re Status of Studies on Bmi Thimble Tube Wear Problems. Discussions & Licensee Handout Withheld ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20151W5141988-04-21021 April 1988 Summary of Operating Reactors Events Meeting 88-016 on 880419 in Rockville,Md.List of Attendees & Viewgraphs Encl ML20237D8231987-12-17017 December 1987 Summary of 871030 Meeting W/Util Re Assessment of Util Compliance W/License Condition on Physical Security During Low Power Operation ML20237C6061987-12-14014 December 1987 Summary of 871202 Meeting W/Util & Bechtel Re Causes & Mods Relative to Pipe Failures in Auxiliary Feedwater Sys at Plant.List of Meeting Attendees & Util Handouts Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl 1999-09-24
[Table view] |
Text
.
r May 80 1997 LICENSEE: HOUSTON LIGHTING AND POWER COMPANY (HL&P)
FACILITY: South Texas Project, Units 1 and 2 (STP)
SUBJECT:
SUMMARY
OF APRIL 21, 1997, MEETING ON HL&P'S GRADED QUALITY ASSURANCE (QA) APPLICATION On April 21, 1997, HL&P met with the Nuclear Regulatory Commission staff to discuss HL&P's proposed QA program change to implement graded QA. Meeting attendees are listed in the attachment.
The staff elaborated on the issues contained in its request for additional information (RAI) issued on April 14, 1997. HL&P indicated their general willingness to amend the QA program description so that the QA controls for low safety significant items are more clearly described. The licensee also indicated a willingness to modify the approach used to categorize the safety significance of plant equipment to more closely correspond to the process embodied in the staff's RAI. The process embodied in the staff's RAI is related to recent staff work in developing Draft Regulatory Guide 1064 (which the license has not seen, because it has not been released for public comment). The license also agreed to provide some level of description of the categorization process in the 0A program description.
Regarding followup activities, HL&P plans to respond to the RAI within the next few weeks. The staff plans to continue its review and evaluation of :
HL&P's graded QA application during a site visit in early May 1997. {
ORIGINAL SIGNED BY:
Thomas W. Alexion, Project Manager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Attachment:
List of Meeting Attendees cc w/att: See next page '
DISTRIBUTION: See next page q Document Name: ST042197. HTS *See previous concurrence /4 0FC PM/PD d h1A/PD4-1 BC/HQMB* (A)BC/SPSB*
NAME TAlexiokvh CHawes f/h/) SBlack MCunningham DATE b /$/97 f/8/97 04/28/97 05/06/97 j COPY (YEhNO YES/N0 YES/N0 YES/N0 v 0FFICIAL RECORD COPY 9705 30274 970508 PDR ADOCK 05000498 i P PDR 1
s puro g 4 UNITED STATES s* j 2
NUCLEAR REGULATORY COMMISSION WASHINGTON, D,C. 3066dH001
% e
..... May 8, 1997 LICENSEE: HOUSTON LIGHTING AND POWER COMPANY (HL&P)
FACILITY: South Texas Project, Units 1 and 2 (STP) 4
SUBJECT:
SUMMARY
OF APRIL 21, 1997, MEETING ON HL&P'S GRADED QUALITY ASSURANCE (QA) APPLICATION On April 21, 1997, HL&P met with the Nuclear Regulatory Commission staff to discuss HL&P's proposed QA program change to implement graded QA. Meeting attendees are listed in the attachment.
The staff elaborated on the issues contained in its request for additional information (RAI) issued on April 14, 1997. HL&P indicated their general willingness to amend the QA program description so that the QA controls for low safety significant items are more clearly described. The licensee also indi.cated a willingness to modify the. approach used to categorize the safety significance of plant equipment to more closely correspond to the process embodied in the staff's RAI. The process embodied in the staff's RAI is related to recent staff work in developing Draft Regulatory Guide 1064 (which the license has not seen, because it has not been released for public comment). The license also agreed to provide some level of description of the categorization process in the QA program description.
Regarding followup activities, HL&P plans to respond to the RAI within the next few weeks. The staff plans to continue its review and evaluation of HL&P's graded QA application during a site visit in early May 199/.
QQyW4) ,
Thomas W. Alexion, Project anager Project Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499
Attachment:
List of Meeting Attendees cc w/att: See next page
5 l
4 DISTRIBUTION:
HARD COPY E-MAIL Docket File SCollins/FMiraglia (SJC1/FJM) RZimmerman (RPZ)
PUBLIC JRoe (JWR) EAdensam (EGA1)
PD4-1 r/f- TAlexion (TWA) CHawes (CMH2)
OGC WBeckner (WDB) PGwynn (TPG)
ACRS SBlack (SCB) RGramm (RAG)
WHaass (WPH) LCampbell (LLC 3)
AKeim (ATK) MBugg (MTB)
MCunningham (MAC3) MRubin-(MPR)
SDinsmore (SCD1) WMcDowell (WDM)
4 Houston Lighting & Power Company South Texas, Units 1 & 2 cc:
Mr. David P. Loveless Jack R. Newman, Esq.
Senior Resident Inspector Morgan, Lewis & Bockius U.S. Nuclear Regulatory Commission 1800 M Street, N.W. i P. O. Box 910 Washington, DC 20036-5869 Bay City, TX 77414 l Mr. Lawrence E. Martin Mr. J. C. Lanier/M. B. Lee General Manager, Nuclear Assurance Licensing City of Austin Houston Lighting and Power Company Electric Utility Department P. O. Box 289 )
721 Barton Springs Road Wadsworth, TX 77483 Austin, TX 78704 Rufus S. Scott {
Mr. M. T. Hardt Associate General Counsel Mr. W. C. Gunst Houston Lighting and Power Company City Public Service Board P. O. Box 61867 P. O. Box 1771 Houston, TX 77208 San Antonio, TX 78296 l Joseph R. Egan, Esq.
Mr. G. E. Vaughn/C. A. Johnson Egan & Associates, P.C.
Central Power and Light Company 2300 N Street, N.W.
P. O. Box 289 Washington, DC 20037 Mail Code: N5012 Wadsworth, TX 74483 Office of the Governor ATTN: Andy Barrett, Director INP0 Environmental Policy Records Center- P. O. Box 12428 700 Galleria Parkway Austin, TX 78711 Atlanta, GA 30339-3064 Arthur C. Tate, Director Regional Administrator, Region IV Division of Compliance & Inspection U.S. Nuclear Regulatory Commission Bureau of Radiation Control 611 Ryan Plaza Drive, Suite 400 Texas Department of Health 1 Arlington, TX 76011 1100 West 49th Street i Austin, TX 78756 Dr. Bertram Wolfe 15453 Via Vaquero Texas Public Utility Commission Monte Sereno, CA 95030 ATTN: Mr. Glenn W. Dishong )
7800 Shoal Creek Blvd.
Judge, Matagorda County Suite 400N Matagorda County Courthouse Austin, TX 78757-1024 1700 Seventh Street Bay City, TX 77414 Mr. William T. Cottle Executive VP & General Manager Nuclear Houston Lighting & Power Company 1 South Texas Project Electric '
Generating Station ,
P. O. Box 289 Wadsworth, TX 77483 l
i i
- MEETING WITH HL&P ON QRADED OVALITY ASSURANCE i
4 April 21, 1997
! Hamt Oraanization M. McBurnett HL&P R. Rehkugler HL&P R. Grantom HL&P S. Black NRC R. Gramm NRC W. Haass NRC L. Campbell NRC A. Keim NRC M. Bugg NRC M. Cunningham NRC M. Rubin NRC S. Dinsmore NRC W. McDowell NRC T. Alexion NRC l
l l
l l
9 ATTACHMENT