MONTHYEARML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20206G4841999-04-30030 April 1999 Summary of 990315 Meeting with STP Nuclear Operating Co Re Util Submittal of Draft Request for Exemption from Special Treatment Requirements for Components That Are Low Safety Significant or non-risk Significant, ML20199D1931999-01-11011 January 1999 Summary of 981208 Meeting with STPNOC Re Status of Current & Future Licensing Actions & Activities.List of Meeting Attendees & Handout Provided by Licensee Encl ML20195G0641998-11-17017 November 1998 Summary of 980915 Meeting with STP Nuclear Operating Co Re Graded Quality Assurance Implementation & Challenges.List of Attendees & Handout Provided by Licensee Encl ML20155E1271998-11-0202 November 1998 Summary of 981008 Conference Call with Util to Discuss Course Action That Would Be Anticipated If Licensee Were to Submit risk-informed Inservice Insp &/Or risk-informed Inservice Testing Program ML20154J7961998-10-13013 October 1998 Summary of 980915 Meeting with Licensee Re risk-informed Operations at Stp.Copies of Slides Presented Encl ML20247L7411998-05-20020 May 1998 Summary of 980506 Meeting W/Util in Re Proposed Merger Between America Electric Power Co,Inc & Central & Southwest Corp (Csw).Meeting Attendees & Handout Provided by Csw Encl ML20217Q6491998-05-0505 May 1998 Summary of 980413 Meeting W/South Texas Project Nuclear Operating Company Re Current South Texas Project Improved TS Schedule.List of Meeting Attendees & Schedule Encl ML20217N0851998-04-0606 April 1998 Summary of 980303 Meeting W/South Texas Project Re long-term Resolution of Bulletin 88-08, Thermal Stresses in Piping Connected to Reactor Coolant System. Proprietary & non-proprietary Handouts Provided by Licensee Encl ML20199J3371998-02-0202 February 1998 Summary of 980121 Meeting W/Stp Nuclear Operating Co Re Schedule for NRC Review of STPNOC Application for Conversion to Improved Standard Ts.List of Attendees & Handout Provided by Licensee Encl ML20198K4781998-01-0606 January 1998 Summary of 971204 Meeting W/Licensee & Representatives from W Re Proposed 3 Volt Alternate Repair Criteria for Plants Unit 2 Sg.List of Attendees & Handout Encl ML20198G4601997-12-19019 December 1997 Summary of 971210 Meeting W/Licensee Re SG Replacement for Unit 1.List of Attendees & Handout Matls Provided by Licensee Encl ML20199E5771997-11-13013 November 1997 Trip Rept of 971105-06 Visit to Facility for Interviews in Preparation of SALP for Plant ML20212G5041997-10-29029 October 1997 Summary of 971002 Meeting W/Util in Rockville,Md to Discuss Staff Review Schedule for Plant Improved Std TS Conversion Amend.List of Attendees Encl ML20217E4511997-09-22022 September 1997 Summary of 970911 Meeting W/Util in Rockville,Md Re STP 3-train Design & Improved Std TSs Format ML20141C0811997-05-14014 May 1997 Summary of 970424 Meeting W/Util to Discuss Hl&P Plans Re Incomplete Control Rod Insertion at Stp,Units 1 & 2.Meeting Attendees & Handout Provided by Hl&P,Encl ML20140H7801997-05-0808 May 1997 Summary of 970421 Meeting W/Hl&P to Discuss Hl&P Proposed QA Program Change to Implement Graded QA ML20137Z3651997-04-22022 April 1997 Summary of 970403 Meeting W/Util in Rockville,Md to Discuss Staff Review of Licensee Pilot Submittal for Section 3.5 of Project Conversion Amend.List of Attendees & Staff Handouts Encl ML20137Q8641997-04-0909 April 1997 Summary of 970331 Meeting W/Util Re Util Graded QA Application.List of Attendees Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20133N3821997-01-17017 January 1997 Summary of 970109 Meeting W/Hl&P Re Response to NRC Bulletin 96-01, Control Rod Insertion Problems. List of Attendees & Licensee Handout Encl ML20133M2671997-01-15015 January 1997 Summary of 961212 Meeting W/Util Re Status of Staff Review of Licensee Request to Convert Plant TS to Improved Std TS Format.List of Attendees Encl ML20134L7841996-11-20020 November 1996 Summary of 961114 Meeting W/Hl&P in Rockville,Md to Discuss Status of NRC Review of Licensee Request to Convert STP TSs to Improved STS Format.List of Attendees Encl ML20206R4701996-11-0707 November 1996 Summary of 960821-22 Meetings with Hl&P in Wadsworth,Texas Re Graded Quality Assurance Program at Stp.List of Meeting Attendees for Initial Meeting,List of Meetings Held During Two Day Session & Handouts for Meetings Encl ML20128L2901996-10-0808 October 1996 Summary of 960916 Meeting W/Hl&P to Discuss Plans for SG Replacement at STP-1.List of Attendees & Handout Encl ML20059K1731994-01-27027 January 1994 Summary of 940121 Meeting W/Utils Re Results of Operational Readiness Assessment Team Insp at Plant.Various Deficiencies Noted.Media Representatives in Attendance ML20059F3491994-01-0606 January 1994 Summary of 931217 Meeting W/Hl&P Re Analysis Performed on Ecw Sys.W/Attendance List & Meeting Agenda ML20058L7311993-12-13013 December 1993 Summary of 931108-09 Meeting W/Licensee in Rockville,Md Re Resolution of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Agenda & List of Attendees Encl ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062B3771990-10-15015 October 1990 Summary of 900919 Meeting W/Util & Sandia Re Fire Protection Portion of Probability Safety Assessment ML20056A0011990-07-27027 July 1990 Summary of 900530-31 Meeting W/Sandia Natl Labs & Util Re PRA Review.Meeting Attendees Listed in Encl 1 ML20058L0521990-07-19019 July 1990 Summary of 891128 & 29 Meetings W/Util,Sandia & Sea,Inc Re Plant Probability & Safety Assessment.List of Attendees & Sandia Questions W/Licensee Answers Encl ML20246P6111989-09-0505 September 1989 Summary of 881130 Meeting W/Util at Plant Re Ability of Pressurizer Surge Line to Withstand Effects of Thermal Stratification.Discussions Concentrated in Areas of Design Documentation,Thermal Hydraulics & Stratification ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245J4261989-08-11011 August 1989 Summary of 890808 Meeting W/Util & Sandia at Sandia Re PRA Study for Plant.Attendance List & Viewgraphs Encl ML20246P1811989-05-0909 May 1989 Summary of 890506 Meeting W/Utils & Westinghouse Re Licensee Decision to Remove Remainder of Excessive Cooldown Protection Circuitry & Amend to Tech Specs.List of Meeting Attendees & Licensee Meeting Handout Encl NUREG-0781, Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl1989-05-0909 May 1989 Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl ML20246L2621989-05-0909 May 1989 Summary of 880517 Meeting W/Util & Westinghouse Re Results of bottom-mounted Instrumentation Thimble Tube Insp. List of Meeting Attendees.Presentation Matl Handout Withheld ML20245F5081989-04-25025 April 1989 Summary of 890127 Meeting W/Util Re Status of Licensee Pra. List of Attendees,Agenda & Util Presentation Slides Encl ML20196E2621988-12-0202 December 1988 Summary of 881129 Meeting W/Util & Newman & Holtzinger Re Readiness for Low Power License.List of Attendees & Viewgraphs Encl ML20204D5431988-10-12012 October 1988 Summary of 880908 Meeting W/Util in Arlington,Tx Re Schedule for Completion of Certain Security Tasks ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153D4941988-08-26026 August 1988 Summary of 880810 Meeting W/Util,Westinghouse & BNL Re Status of Studies on Bmi Thimble Tube Wear Problems. Discussions & Licensee Handout Withheld ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20151W5141988-04-21021 April 1988 Summary of Operating Reactors Events Meeting 88-016 on 880419 in Rockville,Md.List of Attendees & Viewgraphs Encl ML20237D8231987-12-17017 December 1987 Summary of 871030 Meeting W/Util Re Assessment of Util Compliance W/License Condition on Physical Security During Low Power Operation ML20237C6061987-12-14014 December 1987 Summary of 871202 Meeting W/Util & Bechtel Re Causes & Mods Relative to Pipe Failures in Auxiliary Feedwater Sys at Plant.List of Meeting Attendees & Util Handouts Encl 1999-09-24
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20206G4841999-04-30030 April 1999 Summary of 990315 Meeting with STP Nuclear Operating Co Re Util Submittal of Draft Request for Exemption from Special Treatment Requirements for Components That Are Low Safety Significant or non-risk Significant, ML20199D1931999-01-11011 January 1999 Summary of 981208 Meeting with STPNOC Re Status of Current & Future Licensing Actions & Activities.List of Meeting Attendees & Handout Provided by Licensee Encl ML20195G0641998-11-17017 November 1998 Summary of 980915 Meeting with STP Nuclear Operating Co Re Graded Quality Assurance Implementation & Challenges.List of Attendees & Handout Provided by Licensee Encl ML20155E1271998-11-0202 November 1998 Summary of 981008 Conference Call with Util to Discuss Course Action That Would Be Anticipated If Licensee Were to Submit risk-informed Inservice Insp &/Or risk-informed Inservice Testing Program ML20154J7961998-10-13013 October 1998 Summary of 980915 Meeting with Licensee Re risk-informed Operations at Stp.Copies of Slides Presented Encl ML20247L7411998-05-20020 May 1998 Summary of 980506 Meeting W/Util in Re Proposed Merger Between America Electric Power Co,Inc & Central & Southwest Corp (Csw).Meeting Attendees & Handout Provided by Csw Encl ML20217Q6491998-05-0505 May 1998 Summary of 980413 Meeting W/South Texas Project Nuclear Operating Company Re Current South Texas Project Improved TS Schedule.List of Meeting Attendees & Schedule Encl ML20217N0851998-04-0606 April 1998 Summary of 980303 Meeting W/South Texas Project Re long-term Resolution of Bulletin 88-08, Thermal Stresses in Piping Connected to Reactor Coolant System. Proprietary & non-proprietary Handouts Provided by Licensee Encl ML20199J3371998-02-0202 February 1998 Summary of 980121 Meeting W/Stp Nuclear Operating Co Re Schedule for NRC Review of STPNOC Application for Conversion to Improved Standard Ts.List of Attendees & Handout Provided by Licensee Encl ML20198K4781998-01-0606 January 1998 Summary of 971204 Meeting W/Licensee & Representatives from W Re Proposed 3 Volt Alternate Repair Criteria for Plants Unit 2 Sg.List of Attendees & Handout Encl ML20198G4601997-12-19019 December 1997 Summary of 971210 Meeting W/Licensee Re SG Replacement for Unit 1.List of Attendees & Handout Matls Provided by Licensee Encl ML20212G5041997-10-29029 October 1997 Summary of 971002 Meeting W/Util in Rockville,Md to Discuss Staff Review Schedule for Plant Improved Std TS Conversion Amend.List of Attendees Encl ML20217E4511997-09-22022 September 1997 Summary of 970911 Meeting W/Util in Rockville,Md Re STP 3-train Design & Improved Std TSs Format ML20141C0811997-05-14014 May 1997 Summary of 970424 Meeting W/Util to Discuss Hl&P Plans Re Incomplete Control Rod Insertion at Stp,Units 1 & 2.Meeting Attendees & Handout Provided by Hl&P,Encl ML20140H7801997-05-0808 May 1997 Summary of 970421 Meeting W/Hl&P to Discuss Hl&P Proposed QA Program Change to Implement Graded QA ML20137Z3651997-04-22022 April 1997 Summary of 970403 Meeting W/Util in Rockville,Md to Discuss Staff Review of Licensee Pilot Submittal for Section 3.5 of Project Conversion Amend.List of Attendees & Staff Handouts Encl ML20137Q8641997-04-0909 April 1997 Summary of 970331 Meeting W/Util Re Util Graded QA Application.List of Attendees Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20133N3821997-01-17017 January 1997 Summary of 970109 Meeting W/Hl&P Re Response to NRC Bulletin 96-01, Control Rod Insertion Problems. List of Attendees & Licensee Handout Encl ML20133M2671997-01-15015 January 1997 Summary of 961212 Meeting W/Util Re Status of Staff Review of Licensee Request to Convert Plant TS to Improved Std TS Format.List of Attendees Encl ML20134L7841996-11-20020 November 1996 Summary of 961114 Meeting W/Hl&P in Rockville,Md to Discuss Status of NRC Review of Licensee Request to Convert STP TSs to Improved STS Format.List of Attendees Encl ML20206R4701996-11-0707 November 1996 Summary of 960821-22 Meetings with Hl&P in Wadsworth,Texas Re Graded Quality Assurance Program at Stp.List of Meeting Attendees for Initial Meeting,List of Meetings Held During Two Day Session & Handouts for Meetings Encl ML20128L2901996-10-0808 October 1996 Summary of 960916 Meeting W/Hl&P to Discuss Plans for SG Replacement at STP-1.List of Attendees & Handout Encl ML20059K1731994-01-27027 January 1994 Summary of 940121 Meeting W/Utils Re Results of Operational Readiness Assessment Team Insp at Plant.Various Deficiencies Noted.Media Representatives in Attendance ML20059F3491994-01-0606 January 1994 Summary of 931217 Meeting W/Hl&P Re Analysis Performed on Ecw Sys.W/Attendance List & Meeting Agenda ML20058L7311993-12-13013 December 1993 Summary of 931108-09 Meeting W/Licensee in Rockville,Md Re Resolution of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Agenda & List of Attendees Encl ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062B3771990-10-15015 October 1990 Summary of 900919 Meeting W/Util & Sandia Re Fire Protection Portion of Probability Safety Assessment ML20056A0011990-07-27027 July 1990 Summary of 900530-31 Meeting W/Sandia Natl Labs & Util Re PRA Review.Meeting Attendees Listed in Encl 1 ML20058L0521990-07-19019 July 1990 Summary of 891128 & 29 Meetings W/Util,Sandia & Sea,Inc Re Plant Probability & Safety Assessment.List of Attendees & Sandia Questions W/Licensee Answers Encl ML20246P6111989-09-0505 September 1989 Summary of 881130 Meeting W/Util at Plant Re Ability of Pressurizer Surge Line to Withstand Effects of Thermal Stratification.Discussions Concentrated in Areas of Design Documentation,Thermal Hydraulics & Stratification ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245J4261989-08-11011 August 1989 Summary of 890808 Meeting W/Util & Sandia at Sandia Re PRA Study for Plant.Attendance List & Viewgraphs Encl ML20246L2621989-05-0909 May 1989 Summary of 880517 Meeting W/Util & Westinghouse Re Results of bottom-mounted Instrumentation Thimble Tube Insp. List of Meeting Attendees.Presentation Matl Handout Withheld ML20246P1811989-05-0909 May 1989 Summary of 890506 Meeting W/Utils & Westinghouse Re Licensee Decision to Remove Remainder of Excessive Cooldown Protection Circuitry & Amend to Tech Specs.List of Meeting Attendees & Licensee Meeting Handout Encl NUREG-0781, Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl1989-05-0909 May 1989 Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl ML20245F5081989-04-25025 April 1989 Summary of 890127 Meeting W/Util Re Status of Licensee Pra. List of Attendees,Agenda & Util Presentation Slides Encl ML20196E2621988-12-0202 December 1988 Summary of 881129 Meeting W/Util & Newman & Holtzinger Re Readiness for Low Power License.List of Attendees & Viewgraphs Encl ML20204D5431988-10-12012 October 1988 Summary of 880908 Meeting W/Util in Arlington,Tx Re Schedule for Completion of Certain Security Tasks ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153D4941988-08-26026 August 1988 Summary of 880810 Meeting W/Util,Westinghouse & BNL Re Status of Studies on Bmi Thimble Tube Wear Problems. Discussions & Licensee Handout Withheld ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20151W5141988-04-21021 April 1988 Summary of Operating Reactors Events Meeting 88-016 on 880419 in Rockville,Md.List of Attendees & Viewgraphs Encl ML20237D8231987-12-17017 December 1987 Summary of 871030 Meeting W/Util Re Assessment of Util Compliance W/License Condition on Physical Security During Low Power Operation ML20237C6061987-12-14014 December 1987 Summary of 871202 Meeting W/Util & Bechtel Re Causes & Mods Relative to Pipe Failures in Auxiliary Feedwater Sys at Plant.List of Meeting Attendees & Util Handouts Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl 1999-09-24
[Table view] |
Text
.. _ _
l '; j UN;TED STATES g *
' g- NUCLEAR REGULATORY COMMISSION O. 'j. tNASHINGTON, D. C. 20555 1 September 5, 1989
- - -...../
Docket Nos. 50-498 and 50-499 LICENSEE: Houston Lighting & Power Company
-FACILITY: South Texas Project, Units 1 and 2-
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS THE ABILITY OF THE PRESSURIZER SURGE LINE AT SOUTH TEXAS 1 (STP-1) AND 2 (STP-2) TO WITHSTAND THE EFFECTS OF THERMAL STRATIFICATION.
The subject meeting was held on November 30, 1988. The enclosure is the list of attendees.
BACKGROU,ND The licensee for the Trojan Plant has observed unexpected novement of the
. pressurizer surge line during inspections performad at each refueling outage since 1982, when monitoring of the line movemer,ts began. During the last refueling outage, the licensee found that in addition to unexpected gap closures in the pipe whip restraints, the piping actually contacted two restraints. The most'recent investigation by the licensee confirmed that the movement of piping was caused by themal stratification in the line. This phenotrenon was not considered in the origiral piping design. On October 7, 1988, the staff issued Information Notice 88-80, " Unexpected Piping Movement Attributed to Thermal Stratification," regarding the Trojan experience. Other licensees have also noticed larger than expected displacement of their pressurizer surge lines.
The staff developed a proposed course of action in late 1988 and was preparing to publish an NRC Bulletin (88-11) shortly before planned issuerce of the low power license.for STP-2. Further, the staff's position regarding resolution of the issue was that it had to be done before plant licensing.
MEETING
SUMMARY
At the November 30, 1988 meeting, the licensee and representatives from Westinghouse informed the staff of progress made in addressing the issue for South Texas. Since the units at South Texas are duplicates of each other, the discussion and results applied to both units.
The methodology and results to date in substantiating the design basis life of 40 years were presented. The discussions concentrated in the areas of design documentation, thermal hydraulics and stratification, monitoring programs, operations survey, heat transfer and stress analysis, stratification profiles, transient types, heatup-coodown transients, and design transients w/stratifice-tion. Because the discussions involved proprietary information, no information is included with this meeting sumtrary. However a copy of the handout is retained in the project manager's files. During the course of the meeting, the staff provided comments and ask questions for clarification of the presentation. At 8909110186 890905 ( /
DR ADOCK0500g8 /
l1 ,
the end of the meeting, the licensee committed to submit the study on the docket. The submittal was made on December 9, 1988 and was the basis for the staff review for the low power license. The results of staff's review is reported in section 5.2.1 of the Safety Evaluation Report related to the operation of South Texas Project, Unit 2, (NUREG-0781), Supplement 6 (January 1989).
Auditional information on the subject of thermal stratification in the pressurizer surge line for South Texas may be found in the licensee's submittals of: January 17, 1989, February 1,1989, and February 15, 1989; NRC Bulletin No. 88-11 (December 20,1988); and Supplement 7 to NUREG-0781 (March 1989).
NC Geor h&
F. Dick, Jf. , Project Manager Project Directorate IV Division of Reactor Proje<ts - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page
5
'?
4 i .. .4 !
w .;
(,
Enclosure 1 gdp:
1 Pressurizer Surge Line Meetini E
-c November 11, 1988 L U.S. ' Nuclear Regulatory . Houston Lighting & Power Company Jack Bailey.
'. P. George Dick-T. Kuo Wayne Harrison.
S. Hou~ S. B. Patel
- .CE Y.'Cheng-
, Claudia Abbate-Melinde Malloy Chu-yu 5.iang TU Electric T. J. Konyon Anthony Marvray S. Lee J. W. Muffett
- P. Kadambi' Jack Redding Barry Elliot
. Westinghouse Duquesne Light Company
- Dave Roarh Michael Testa
- George Antaki. Sanjb K. Mukherjee
-Bill Coslow=
Sam Palusamy:
Ed R.' Johnson
-Mark Barlow Ken: Chang-Brad Maurer-
. Gary - Ellis
. Warren Bamford
. Robert:W. Carlson R.. Michael'Roidt-Ron Coffield
-__:--________--__u__
161 - Mr. :.J. H. Goldberg South Texas Project-Houston Lighting and Power Company cc:
Brian .Berwick, Esq. Resident Inspector / South Texas Assistant Attorney General Project Environmental Protection Division c/o U.S. Nuclear Regulatory Commission P. 0. Box 12548 P. O. Box 910
. Capitol Station Bay City, Texas 77414 Austin, Texas 78711 Ms. Iris J. Jones Mr. J. T. Westermeier. Acting City Attorney General Manager,' South Texas Project City of Austin Houston Lighting and Power Company P. O. Box 1088 P. 0. Box 289 Austin, Texas 78767 Houston, Texas 77483 Mr. S. L. Rosen Vice President, Nuclear Engineering Mr. R. J. Miner and Construction Chief Operating Officer Houston Lighting & Power Company City of Austin Electric Utility P. O. Box 289 721 Barton Springs Road Wadsworth, Texas 77483 Austin, Texas 78704 Mr. M. A. McBurnett Mr. R. J. Costello Manager, Operations Support Licensing Mr. M; T. Hardt Houston Lighting and Power Company City Public. Service Board P. O. Box 289 P. O. Box 1771 Wadsworth, Texas 77483 San Antonio, Texas 78296 Mr. E. T. Molnar Jack R. Newman, Esq. . Mr. L. W. Hurst Newman & Holtzinger, P. C. Bechtel Corporation 1615 L Street, NW P. O. Box 2166 Washington, D.C. 20036 Houston, Texas 77252-2166
-Melbert-Schwartz, Jr...Esq. Mr. R. P. Verret Baker & Botts Mr. R. L. Range One Shell Plaza Central Power and Light Company Houston, Texas 77002 P. O. Box 2121 Corpus Christi, Texas 78403 Doub, Muntzing and Glasgow Attorneys at Law Suite 400 808 Seventeenth Street, N.W.
Washington, D.C. 20006 l
t.4 Mr. J. H. Goldberg South Texas Project V Houston Lighting & Power Company cc:
Regional-Administrator, Region IV Bureau of Radiation Control U.S. Nuclear Regulatory Connission State of Texas Office of Executive Director 1101 West 49th Street
. for Operations Austin, Texas 78756 611 Pyan Plaza Drive, Suite 1000 Arlington, Texas 76011 Office of the Governor ATTN: Ms. Darla Parker Joseph M. Hendrie Office of Intergovernmental Relations 50 Bellport Lane Post Office Box 13561 Be11 port, New York 11713 Austin, Texas 78711 Judge, Matagorda County Gerald E. Vaughn, Vice President Natagorda' County Courthouse Nuclear Operations 1700 Seventh Street Houston Lighting & Power Company Bay City, Texas 77414 P. O. Box 289 Wadsworth, Texas 77483 Licensing Representative Houston Lighting and Power Company R. W. Chewning, Chairman Suite 610 Nuclear Safety Review Board Three Metro Center Houston Lighting & Power Company Bethesda, Maryland 20814 P. O. Box 289 Wadsworth, Texas 77483 Rufus S. Scott Associate General Counsel Houston Lighting & Power-Company P. O. Bcx 1700 Houston, Texas 77001 l
_______.____________m.___.__.m__ __
... - - September 5,1989
.( -
the end of the meeting, the licensee connitted to submit the study on the docket. The submittal was made on December 9, 1988 and was the basis for the staff review for the low power license. The results of staff's review is.
reported in section 5.2.1 of the Safety Evaluation Report related to the operation of South Texas Project, Unit 2, (NUREG-0781), Supplement 6 (January 1989).
Additional information on the subject of thermal stratification in the pressurizer. surge line for South Texas may be found in the licensee's submittals of: January 17, 1989, February 1,1989, and February 15, 1989; NRC Bulletin No. 88-11 (December 20,1988); and Supplement 7 to NUREG-0781 (March 1989).
/s/
George F. Dick, Jr., Project Manager Project Directorate IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION
- Docket F11ef
'NRC PDRT~~
Local .PDR J. Sniezek PD4 Reading F. Hebdon G. Dick OGC-Rockville E. Jordan B. Grimes NRC Participants ACRS (10)
T.. Martin (RegionIV) l , DOCUMENT NAME: MEETING
SUMMARY
STP r
iPD4/LA PD4/04 -
PNoonan /)d]4/PM Rick:bj FHebdor 09/5/89 09/05/89 09/5/89 : g
_ __ _ _ _ - _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ __