MONTHYEARML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20206G4841999-04-30030 April 1999 Summary of 990315 Meeting with STP Nuclear Operating Co Re Util Submittal of Draft Request for Exemption from Special Treatment Requirements for Components That Are Low Safety Significant or non-risk Significant, ML20199D1931999-01-11011 January 1999 Summary of 981208 Meeting with STPNOC Re Status of Current & Future Licensing Actions & Activities.List of Meeting Attendees & Handout Provided by Licensee Encl ML20195G0641998-11-17017 November 1998 Summary of 980915 Meeting with STP Nuclear Operating Co Re Graded Quality Assurance Implementation & Challenges.List of Attendees & Handout Provided by Licensee Encl ML20155E1271998-11-0202 November 1998 Summary of 981008 Conference Call with Util to Discuss Course Action That Would Be Anticipated If Licensee Were to Submit risk-informed Inservice Insp &/Or risk-informed Inservice Testing Program ML20154J7961998-10-13013 October 1998 Summary of 980915 Meeting with Licensee Re risk-informed Operations at Stp.Copies of Slides Presented Encl ML20247L7411998-05-20020 May 1998 Summary of 980506 Meeting W/Util in Re Proposed Merger Between America Electric Power Co,Inc & Central & Southwest Corp (Csw).Meeting Attendees & Handout Provided by Csw Encl ML20217Q6491998-05-0505 May 1998 Summary of 980413 Meeting W/South Texas Project Nuclear Operating Company Re Current South Texas Project Improved TS Schedule.List of Meeting Attendees & Schedule Encl ML20217N0851998-04-0606 April 1998 Summary of 980303 Meeting W/South Texas Project Re long-term Resolution of Bulletin 88-08, Thermal Stresses in Piping Connected to Reactor Coolant System. Proprietary & non-proprietary Handouts Provided by Licensee Encl ML20199J3371998-02-0202 February 1998 Summary of 980121 Meeting W/Stp Nuclear Operating Co Re Schedule for NRC Review of STPNOC Application for Conversion to Improved Standard Ts.List of Attendees & Handout Provided by Licensee Encl ML20198K4781998-01-0606 January 1998 Summary of 971204 Meeting W/Licensee & Representatives from W Re Proposed 3 Volt Alternate Repair Criteria for Plants Unit 2 Sg.List of Attendees & Handout Encl ML20198G4601997-12-19019 December 1997 Summary of 971210 Meeting W/Licensee Re SG Replacement for Unit 1.List of Attendees & Handout Matls Provided by Licensee Encl ML20199E5771997-11-13013 November 1997 Trip Rept of 971105-06 Visit to Facility for Interviews in Preparation of SALP for Plant ML20212G5041997-10-29029 October 1997 Summary of 971002 Meeting W/Util in Rockville,Md to Discuss Staff Review Schedule for Plant Improved Std TS Conversion Amend.List of Attendees Encl ML20217E4511997-09-22022 September 1997 Summary of 970911 Meeting W/Util in Rockville,Md Re STP 3-train Design & Improved Std TSs Format ML20141C0811997-05-14014 May 1997 Summary of 970424 Meeting W/Util to Discuss Hl&P Plans Re Incomplete Control Rod Insertion at Stp,Units 1 & 2.Meeting Attendees & Handout Provided by Hl&P,Encl ML20140H7801997-05-0808 May 1997 Summary of 970421 Meeting W/Hl&P to Discuss Hl&P Proposed QA Program Change to Implement Graded QA ML20137Z3651997-04-22022 April 1997 Summary of 970403 Meeting W/Util in Rockville,Md to Discuss Staff Review of Licensee Pilot Submittal for Section 3.5 of Project Conversion Amend.List of Attendees & Staff Handouts Encl ML20137Q8641997-04-0909 April 1997 Summary of 970331 Meeting W/Util Re Util Graded QA Application.List of Attendees Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20133N3821997-01-17017 January 1997 Summary of 970109 Meeting W/Hl&P Re Response to NRC Bulletin 96-01, Control Rod Insertion Problems. List of Attendees & Licensee Handout Encl ML20133M2671997-01-15015 January 1997 Summary of 961212 Meeting W/Util Re Status of Staff Review of Licensee Request to Convert Plant TS to Improved Std TS Format.List of Attendees Encl ML20134L7841996-11-20020 November 1996 Summary of 961114 Meeting W/Hl&P in Rockville,Md to Discuss Status of NRC Review of Licensee Request to Convert STP TSs to Improved STS Format.List of Attendees Encl ML20206R4701996-11-0707 November 1996 Summary of 960821-22 Meetings with Hl&P in Wadsworth,Texas Re Graded Quality Assurance Program at Stp.List of Meeting Attendees for Initial Meeting,List of Meetings Held During Two Day Session & Handouts for Meetings Encl ML20128L2901996-10-0808 October 1996 Summary of 960916 Meeting W/Hl&P to Discuss Plans for SG Replacement at STP-1.List of Attendees & Handout Encl ML20059K1731994-01-27027 January 1994 Summary of 940121 Meeting W/Utils Re Results of Operational Readiness Assessment Team Insp at Plant.Various Deficiencies Noted.Media Representatives in Attendance ML20059F3491994-01-0606 January 1994 Summary of 931217 Meeting W/Hl&P Re Analysis Performed on Ecw Sys.W/Attendance List & Meeting Agenda ML20058L7311993-12-13013 December 1993 Summary of 931108-09 Meeting W/Licensee in Rockville,Md Re Resolution of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Agenda & List of Attendees Encl ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062B3771990-10-15015 October 1990 Summary of 900919 Meeting W/Util & Sandia Re Fire Protection Portion of Probability Safety Assessment ML20056A0011990-07-27027 July 1990 Summary of 900530-31 Meeting W/Sandia Natl Labs & Util Re PRA Review.Meeting Attendees Listed in Encl 1 ML20058L0521990-07-19019 July 1990 Summary of 891128 & 29 Meetings W/Util,Sandia & Sea,Inc Re Plant Probability & Safety Assessment.List of Attendees & Sandia Questions W/Licensee Answers Encl ML20246P6111989-09-0505 September 1989 Summary of 881130 Meeting W/Util at Plant Re Ability of Pressurizer Surge Line to Withstand Effects of Thermal Stratification.Discussions Concentrated in Areas of Design Documentation,Thermal Hydraulics & Stratification ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245J4261989-08-11011 August 1989 Summary of 890808 Meeting W/Util & Sandia at Sandia Re PRA Study for Plant.Attendance List & Viewgraphs Encl ML20246P1811989-05-0909 May 1989 Summary of 890506 Meeting W/Utils & Westinghouse Re Licensee Decision to Remove Remainder of Excessive Cooldown Protection Circuitry & Amend to Tech Specs.List of Meeting Attendees & Licensee Meeting Handout Encl NUREG-0781, Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl1989-05-0909 May 1989 Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl ML20246L2621989-05-0909 May 1989 Summary of 880517 Meeting W/Util & Westinghouse Re Results of bottom-mounted Instrumentation Thimble Tube Insp. List of Meeting Attendees.Presentation Matl Handout Withheld ML20245F5081989-04-25025 April 1989 Summary of 890127 Meeting W/Util Re Status of Licensee Pra. List of Attendees,Agenda & Util Presentation Slides Encl ML20196E2621988-12-0202 December 1988 Summary of 881129 Meeting W/Util & Newman & Holtzinger Re Readiness for Low Power License.List of Attendees & Viewgraphs Encl ML20204D5431988-10-12012 October 1988 Summary of 880908 Meeting W/Util in Arlington,Tx Re Schedule for Completion of Certain Security Tasks ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153D4941988-08-26026 August 1988 Summary of 880810 Meeting W/Util,Westinghouse & BNL Re Status of Studies on Bmi Thimble Tube Wear Problems. Discussions & Licensee Handout Withheld ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20151W5141988-04-21021 April 1988 Summary of Operating Reactors Events Meeting 88-016 on 880419 in Rockville,Md.List of Attendees & Viewgraphs Encl ML20237D8231987-12-17017 December 1987 Summary of 871030 Meeting W/Util Re Assessment of Util Compliance W/License Condition on Physical Security During Low Power Operation ML20237C6061987-12-14014 December 1987 Summary of 871202 Meeting W/Util & Bechtel Re Causes & Mods Relative to Pipe Failures in Auxiliary Feedwater Sys at Plant.List of Meeting Attendees & Util Handouts Encl 1999-09-24
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20212H2231999-09-24024 September 1999 Summary of 990831-0901 Meeting with STPNOC in Rockville, Maryland Re 990713 Request for 14 risk-informed Exemptions to Exclude safety-related LSSC & non-risk Significant Components from Special Treatment Requirements ML20210Q1841999-08-11011 August 1999 Summary of 990722 Meeting with Util Re Proposed TS for SG Water Level low-top Trip Setpoint.List of Meeting Attendees & Handout Provided by Util Encl ML20206G4841999-04-30030 April 1999 Summary of 990315 Meeting with STP Nuclear Operating Co Re Util Submittal of Draft Request for Exemption from Special Treatment Requirements for Components That Are Low Safety Significant or non-risk Significant, ML20199D1931999-01-11011 January 1999 Summary of 981208 Meeting with STPNOC Re Status of Current & Future Licensing Actions & Activities.List of Meeting Attendees & Handout Provided by Licensee Encl ML20195G0641998-11-17017 November 1998 Summary of 980915 Meeting with STP Nuclear Operating Co Re Graded Quality Assurance Implementation & Challenges.List of Attendees & Handout Provided by Licensee Encl ML20155E1271998-11-0202 November 1998 Summary of 981008 Conference Call with Util to Discuss Course Action That Would Be Anticipated If Licensee Were to Submit risk-informed Inservice Insp &/Or risk-informed Inservice Testing Program ML20154J7961998-10-13013 October 1998 Summary of 980915 Meeting with Licensee Re risk-informed Operations at Stp.Copies of Slides Presented Encl ML20247L7411998-05-20020 May 1998 Summary of 980506 Meeting W/Util in Re Proposed Merger Between America Electric Power Co,Inc & Central & Southwest Corp (Csw).Meeting Attendees & Handout Provided by Csw Encl ML20217Q6491998-05-0505 May 1998 Summary of 980413 Meeting W/South Texas Project Nuclear Operating Company Re Current South Texas Project Improved TS Schedule.List of Meeting Attendees & Schedule Encl ML20217N0851998-04-0606 April 1998 Summary of 980303 Meeting W/South Texas Project Re long-term Resolution of Bulletin 88-08, Thermal Stresses in Piping Connected to Reactor Coolant System. Proprietary & non-proprietary Handouts Provided by Licensee Encl ML20199J3371998-02-0202 February 1998 Summary of 980121 Meeting W/Stp Nuclear Operating Co Re Schedule for NRC Review of STPNOC Application for Conversion to Improved Standard Ts.List of Attendees & Handout Provided by Licensee Encl ML20198K4781998-01-0606 January 1998 Summary of 971204 Meeting W/Licensee & Representatives from W Re Proposed 3 Volt Alternate Repair Criteria for Plants Unit 2 Sg.List of Attendees & Handout Encl ML20198G4601997-12-19019 December 1997 Summary of 971210 Meeting W/Licensee Re SG Replacement for Unit 1.List of Attendees & Handout Matls Provided by Licensee Encl ML20212G5041997-10-29029 October 1997 Summary of 971002 Meeting W/Util in Rockville,Md to Discuss Staff Review Schedule for Plant Improved Std TS Conversion Amend.List of Attendees Encl ML20217E4511997-09-22022 September 1997 Summary of 970911 Meeting W/Util in Rockville,Md Re STP 3-train Design & Improved Std TSs Format ML20141C0811997-05-14014 May 1997 Summary of 970424 Meeting W/Util to Discuss Hl&P Plans Re Incomplete Control Rod Insertion at Stp,Units 1 & 2.Meeting Attendees & Handout Provided by Hl&P,Encl ML20140H7801997-05-0808 May 1997 Summary of 970421 Meeting W/Hl&P to Discuss Hl&P Proposed QA Program Change to Implement Graded QA ML20137Z3651997-04-22022 April 1997 Summary of 970403 Meeting W/Util in Rockville,Md to Discuss Staff Review of Licensee Pilot Submittal for Section 3.5 of Project Conversion Amend.List of Attendees & Staff Handouts Encl ML20137Q8641997-04-0909 April 1997 Summary of 970331 Meeting W/Util Re Util Graded QA Application.List of Attendees Encl ML20137F2351997-03-24024 March 1997 Summary of 970207 Meeting W/Listed Attendees in Rockville,Md to Discuss Nuclear Energy Inst Concerns Re Graded Quality Assurance Activities W/Volunteer Plants ML20133N3821997-01-17017 January 1997 Summary of 970109 Meeting W/Hl&P Re Response to NRC Bulletin 96-01, Control Rod Insertion Problems. List of Attendees & Licensee Handout Encl ML20133M2671997-01-15015 January 1997 Summary of 961212 Meeting W/Util Re Status of Staff Review of Licensee Request to Convert Plant TS to Improved Std TS Format.List of Attendees Encl ML20134L7841996-11-20020 November 1996 Summary of 961114 Meeting W/Hl&P in Rockville,Md to Discuss Status of NRC Review of Licensee Request to Convert STP TSs to Improved STS Format.List of Attendees Encl ML20206R4701996-11-0707 November 1996 Summary of 960821-22 Meetings with Hl&P in Wadsworth,Texas Re Graded Quality Assurance Program at Stp.List of Meeting Attendees for Initial Meeting,List of Meetings Held During Two Day Session & Handouts for Meetings Encl ML20128L2901996-10-0808 October 1996 Summary of 960916 Meeting W/Hl&P to Discuss Plans for SG Replacement at STP-1.List of Attendees & Handout Encl ML20059K1731994-01-27027 January 1994 Summary of 940121 Meeting W/Utils Re Results of Operational Readiness Assessment Team Insp at Plant.Various Deficiencies Noted.Media Representatives in Attendance ML20059F3491994-01-0606 January 1994 Summary of 931217 Meeting W/Hl&P Re Analysis Performed on Ecw Sys.W/Attendance List & Meeting Agenda ML20058L7311993-12-13013 December 1993 Summary of 931108-09 Meeting W/Licensee in Rockville,Md Re Resolution of NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Agenda & List of Attendees Encl ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20128P8491993-02-18018 February 1993 Summary of Operating Reactors Events Briefing 93-05 on 930210 ML20062B3771990-10-15015 October 1990 Summary of 900919 Meeting W/Util & Sandia Re Fire Protection Portion of Probability Safety Assessment ML20056A0011990-07-27027 July 1990 Summary of 900530-31 Meeting W/Sandia Natl Labs & Util Re PRA Review.Meeting Attendees Listed in Encl 1 ML20058L0521990-07-19019 July 1990 Summary of 891128 & 29 Meetings W/Util,Sandia & Sea,Inc Re Plant Probability & Safety Assessment.List of Attendees & Sandia Questions W/Licensee Answers Encl ML20246P6111989-09-0505 September 1989 Summary of 881130 Meeting W/Util at Plant Re Ability of Pressurizer Surge Line to Withstand Effects of Thermal Stratification.Discussions Concentrated in Areas of Design Documentation,Thermal Hydraulics & Stratification ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245J4261989-08-11011 August 1989 Summary of 890808 Meeting W/Util & Sandia at Sandia Re PRA Study for Plant.Attendance List & Viewgraphs Encl ML20246L2621989-05-0909 May 1989 Summary of 880517 Meeting W/Util & Westinghouse Re Results of bottom-mounted Instrumentation Thimble Tube Insp. List of Meeting Attendees.Presentation Matl Handout Withheld ML20246P1811989-05-0909 May 1989 Summary of 890506 Meeting W/Utils & Westinghouse Re Licensee Decision to Remove Remainder of Excessive Cooldown Protection Circuitry & Amend to Tech Specs.List of Meeting Attendees & Licensee Meeting Handout Encl NUREG-0781, Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl1989-05-0909 May 1989 Summary of 890130-0201 Meeting W/Westinghouse,Houston Lighting & Power,Texas Utils,Bnl & EAS in Monroeville,Pa Re Overview of Status of Work on Bmi Thimble Tube Wear.Related Info Encl ML20245F5081989-04-25025 April 1989 Summary of 890127 Meeting W/Util Re Status of Licensee Pra. List of Attendees,Agenda & Util Presentation Slides Encl ML20196E2621988-12-0202 December 1988 Summary of 881129 Meeting W/Util & Newman & Holtzinger Re Readiness for Low Power License.List of Attendees & Viewgraphs Encl ML20204D5431988-10-12012 October 1988 Summary of 880908 Meeting W/Util in Arlington,Tx Re Schedule for Completion of Certain Security Tasks ML20154N4471988-09-0707 September 1988 Summary of Operating Reactors Events Meeting 88-036 on 880906 Re Events Which Occurred Since Last Meeting on 880830.List of Attendees Encl ML20153D4941988-08-26026 August 1988 Summary of 880810 Meeting W/Util,Westinghouse & BNL Re Status of Studies on Bmi Thimble Tube Wear Problems. Discussions & Licensee Handout Withheld ML20151N0521988-07-26026 July 1988 Summary of Operating Reactors Events Meeting 88-30 on 880726.List of Attendees & Summary of Reactor Scrams Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20151W5141988-04-21021 April 1988 Summary of Operating Reactors Events Meeting 88-016 on 880419 in Rockville,Md.List of Attendees & Viewgraphs Encl ML20237D8231987-12-17017 December 1987 Summary of 871030 Meeting W/Util Re Assessment of Util Compliance W/License Condition on Physical Security During Low Power Operation ML20237C6061987-12-14014 December 1987 Summary of 871202 Meeting W/Util & Bechtel Re Causes & Mods Relative to Pipe Failures in Auxiliary Feedwater Sys at Plant.List of Meeting Attendees & Util Handouts Encl ML20236P2841987-11-0505 November 1987 Summary of Operating Reactors Events Meeting 87-38 on 871103.List of Attendees,Viewgraphs & Summary of Reactor Scrams Encl 1999-09-24
[Table view] |
Text
l a $ Q b f pw UNITED STATES p s* j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066-0001 4 ,o 9***** May 5, 1998 LICENSEE: STP Nuclear Operating Compcny (STPNOC)
FACILITY: South Texas Project, Units 1 and 2 (STP)
SUBJECT:
SUMMARY
OF MEETING WITH SOUTH TEXAS PROJECT NUCLEAR OPERATING COMPANY IMPROVED TECHNICAL SPECIFICATION CONVERSION SUBMITTAL AND SCHEDULE ON APRIL 13,1998 l
Cn Apn.13,1998, members of the NRC staff met with representatives of South Texas Project Nuclear Operating Company (STPNOC) to discuss the current STP Improved Technical Specification (ITS) schedule. Attachment 1 is the list of meeting attendees. A similar meeting was held on January 21,1998, to discuss the ITS conversion schedule. The STPNOC representative was very concemed that the schedules has slipped from those discussed during the January meeting. He stated that he received a call from the staff on February 28,1998, stating the request for additional information (RAl) scheduled for February 28,1998, would be delayed. The staff stated the current schedules have slipped approximately two months from those proposed in July 1997, which were those expressed during the January 21,1998, meeting. l The staff acknowledged the STPNOC representatives concems regarding schedule and stated l that resources were being applied to the STP ITS conversion. Additionally, the staff agreed to l explore other resource options but stated a firm schedule could not be guaranteed at this point.
The staff provided the best estimate schedule to the STPNOC representative (Attachment 2) and noted that it was a very sggressive schedule for both the NRC and STPNOC.
The staff stated that if STPNOC had questions regarding the staff's RAl, meetings or phone calls could be arranged to discuss the questions so that a correct response could be supplied.
However, the staff stated they would not review any draft or undocketed matorial provided by STPNOC.
The STPNOC representative asked about the options available under the Notice of Enforcement Discretion (NOED) policy with respect to withdrawal of a ITS submittal. The staff stated the NOED guidance requires a statement regarding wheiher the prior adoption of approved fine-item 4 improvements to the current Technical Specifications or the ITS would have obviated the need for the NOED request. The STPNOC representative inquired about who he needed to talk with regarding any changes to the NOED policy. The staff stated that any change in policy would be made by the NRR Office Director. The STPNOC representative stated he would pursue that discussion separately.
\
\
ED HLE CENTH1 CSPV ev; L ' ?)
6c\
9805000265 900505 PDR ADOCK 05000498 y
P PDR
t 2-The STPNOC representative reiterated his displeasure with the slip in the ITS conversion i schedule in light of the upcoming steam generator replacement at STP Unit 1. The staff }'
restated the revised schedule was aggressive but achievable and that resources were being applied to the conversion. However, the ~e ntire iTS conversion pipeline being two months behind schedule has caused all conversions to be delayed.
ORIGINAL SIGNED BY: T. Polich for l Thomas W. Alexion, Project Manager '
Project Directorate IV-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation ,
Docket Nos. 50-498 and 50-499 l Attachments: As stated l cc w/atts: See next page DISTRIBUTION: l HARD COPY E-Mall l Docket File S. Collins /F. Miraglia (SJC1/FJM)
PUBLIC B. Boger (BAB2) ~
PD4-1 r/f ' E. Adensam (EGA1)
OGC C. Hawes (CMH2)
. ACRS T. Martin (SLM3)
T. Polich (TJP1)
T. Alexion (TWA)
J. Hannon (JNH)
W. Beckner(WDB)
C. Schulten (CSS 1)
Document Name: STP41398.MTS . ,,
OFC PM/PD4-1 LA/PD4-1 TSB , . ob (A ADP PD4-ik NAME TPolich/vY CHaweO#N WBeckner BBoger 8' JHannon DATE f/A*/98 h /)h98 k/$998 7 /[/98 [6798 COPY YES/NO YES/NO ' YES/NO YES/No YES/NO
,. 4 4 OFFICIAL RECORD COPY O, M, s t
I 4
l 'i -
i The STPNOC representative reiterated his displeasure with the slip in the ITS conversion schedule in light of the upcoming steam generator replacement at STP Unit 1. The staff restated the revised schedule was aggressive but achievable and that resources were being applied to the conversion. However, the entire ITS conversion pipeline being two months behind schedule has caused all conversions to be delayed.
i Thomas W. Alexion, Project Manager Project Directorate IV-1 Division of Reactor Projects Ill/lV Office of Nuclear Reactor Regulation !
Docket Nos. 50-498 and 50-499 l
Attachments: As stated cc w/atts: See next page s.
E
\
4
I
< \
[ STP Nuclear Operating Company South Texas, Units 1 & 2 p cc: !
Mr. David P. Loveless Jack R. Newman, Esq. l Senior Resident inspector Morgan, Lewis & Bockius j U.S. Nuclear Regulatory Commission 1800 M Street, N.W. '
P. O. Box 910 Washington, DO 20036-5869 -:
Bay City, TX 77414 I Mr. Lawrence E. Martin l A. Ramirez/C. M. Canady Vice President, Nuc. Assurance & Licensing City of Austin STP Nuclear Operating Company Electric Utility Department P. O. Box 289
- 721 Barton Springs Road Wadsworth,TX 77483 Austin, TX 78704 Office of the Govemor Mr. M. T. Hardt ATTN
- John Howard, Director Mr. W. C. Gunst Environmental and Natural City Public Service Board Resources Policy P. O. Box 1771 P. O. Box 12428 San Antonio, TX 78296 Austin, TX 78711 Mr. G. E. Vaughn/C. A. Johnson Jon C. Wood Central Power and Light Company . Matthews & Branscomb P. O. Box 289 One Alamo Center Mail Code: N5012 106 S. St. Mary's Street, Suite 700 Wadsworth, TX 74483 San Antonio, TX 78205-3692 INPO Arthur C. Tate, Director l Records Center Division of Compliance & Inspection !
700 Galleria Parkwn Bureau of Radiation Control Atlanta, GA 3033g-3064 Texas Department of Health 1100 West 49th Street Regional Administrator, Region IV Austin,TX 78756 )
U.S. Nucic:t Regulatary Commission .
l 611 Ryan Plaza Drive, Suite 400 Jim Calloway Arlington, TX 76011 Public Utility Commission of Texas i Electric Industry Analysis j D. G. Tees /R. L. Balcom P. O. Box 13326 !
Houston LightinD &' Power Co. Austin, TX 78711-3326 l P. O. Box 1700 )
Houston,TX 77251 Judge, Matagorda County .
Matagorda County Courthouse 1700 Saventh Street Bay City, TX 77414 Mr. William T. Cottle President and Chief Executive Officer STP Nuclear Operating Company South Texas Project F.lectric Generating Station P. O. Box 289 Wadsworth, TX 77483 l
l l
i
I SOUTH TEXAS PROJECT - NRR MEETING ON ITS April 13.1998 i
MEETING ATTENDEES Name Oraanizatiori Phone L. Martin STP 512-972-8686 B. Boger NRC/NRR/ADP 301-415-1403 T. Polich NRC/NRR/PD 4-1 301-415-1038 W. Beckner NRC/NRR/TSB 301-415-1158 C. Schulten NRC/NRR/TSB 301-415-1192 l
l l
ATTACHMENT 1
7..
j South Tex:s Nuclocr Pow:r Pirnt ITS Schtdul3 April 10,1998 p.
Section Reviewer INEL Scopeissues Resolve Open Draft SE Final SE Database /SE Open items _ _ ltems to LPM to LPM 1.0 complete 5/31/98 8/31/98 9/30/98 10/31/98 Use/ App 4 cation Reardon 2.0 complete 5/31/98 8/31/98 9/30/98 10/31/98 Safety Limits Reardon 3.0 complete 6/30/98 8/31/98 9/30/98 10/31/98 LCO/SR Appl Weston 3.1 .
Weston complete 6/30/98 8/31/98 9/30/98 10/31/98 Riactivity Cnti 3.2 complete 6/30/98- 8/31/98 9/30/98 10/31/98 Power Distr Weston 3.3 complete 6/30/98 8/31/98 9/30/98 10/31/98 Instrumentatio- Schulten 3.4 Chu complete 5/31/98 8/31/98 9/30/98 10/31/98 RCS ;
3.5 Gilles complete 6/30/98 8/31/98 9/30/98 10/31/98 l ECCS 3.6 complete 6/30/98 8/31/98 9/30/98 10/31/98 j Containment Gilles '
3.7 complete 6/30/98 8/31/98 9/30/98 10/31/98 I Plant Sys Gilles 3.8 Shiraki complete 5/31/98 8/31/98 9/30/98 10/31/98 Eltetrical 3.9 Tjader complete 5/31/98 8/31/98 9/30/98 10/31/98 Refueling 4.0 Rearion complete 5/31/98 8/31/98 9/30/98 10/31/98 Design Features 5.0 Liu complete 5/31/98 8/31/98 9/30/98 10/31/98 Admin. Controls -
NOTE: Schedule is based on review of the July 22,1997 resubmittal. The INEL comments are based on the June 4,1996 esmittal.
G:\ SCHEDULE.lTS Updated 4/10/98 AT(ACHMENT 2 l