AECM-84-0456, Final Deficiency & Part 21 Rept PRD-84/08 Re Failure of Wj Woolley Co to Seismically Qualify Personnel Air Locks Pneumatic Supply Sys.Nrc Should Consider Reevaluation of Failure of Potential Generic Effects of Other Plants

From kanterella
(Redirected from ML20108C567)
Jump to navigation Jump to search
Final Deficiency & Part 21 Rept PRD-84/08 Re Failure of Wj Woolley Co to Seismically Qualify Personnel Air Locks Pneumatic Supply Sys.Nrc Should Consider Reevaluation of Failure of Potential Generic Effects of Other Plants
ML20108C567
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 10/03/1984
From: Dale L
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-84, REF-PT21-85-035-000 AECM-84-0456, AECM-84-456, PT21-85-035-000, PT21-85-35, NUDOCS 8411160621
Download: ML20108C567 (2)


Text

,

MISSISSIPPI POWER & LIGHT COMPANY l Helping Build Mississippi M P. O. B O X 164 0. J A C K S O N MIS SIS SIP PI 3 9 2 0 5 October 3, M8R T 5 ej.

NUCLE AR LICENSING & SAFETY DEPARTMENT U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Attention: Mr. J. P. O'Reilly, Regional Administrator

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416 and 50-417 License No. NPF-13 File: 0260/15525/15526 PRD-84/08 Containment and Drywell Personnel Air Lock Seismic Qualification AECM-84/0456

References:

(1) AECM-84/0237, 4/20/84 (2) AECM-84/2-0010, 6/8/84 (3) AECM-84/0337, 6/21/84 (4) June 12, 1984 Letter from R. L. Baer to R. C. Lewis Mississippi Power & Light Company (MP&L) provided a final report for Grand Gulf Nuclear Station (GCNS) Units 1 and 2 for a Reportable Deficiency identified as PRD-84/08 in Reference (3). The deficiency concerned a failure of the vendor, W. J. Woolley Co., to scismically qualify the personnel air locks pneumatic supply system. As stated in Reference (3) the air lock and its associated components were specified to be seismically qualified by the supplier per GCNS Specification 9645-C-153.0. However, contrary to the specification, it was determined that the personnel air locks pneumatic supply sytem (tubing, supports, and instrumentation) between the check valve upstream of the accumulators and the seals had not been qualified.

MP&L recently received a copy of the NRC internal correspondence of Reference (4). It concerned the potentially generic problem at Grand Gulf regarding the seismic qualification of the containment and drywell personnel air locks. The NRC internal correspondence indicated per conversations with W. J. Woolley Company personnel that Grand Gulf was the last site to upgrade their air lock air system to seismic qualifications.

After receiving the NRC internal correspondence, MP&L requested the GrNS Architect-Engineer (A/E) to investigate the reason why the deficiency concerning the seismic design of the airlock air system had not been handled consistent with other nuclear plants. As a result of this investigation, it appears that there has been a misunderstanding based on the communicatiotis between the NRC and W. J. Woolicy concerning the GGNS Part 21 report (Reference 3) and the " upgrade" of the air lock air system referred to in the NRC internal correspondence.

OPPICTAL copy 8411160621 841003

{DRADOCK05000 nber Middle South Utilities System p Af

e. ,
  1. E MISSISSIPPI POWER & LIOHT COMPANY The " upgrade" Woolley refers to was presented to our A/E in 1978, not to meet seismic requirements but as a "new design" which simplified the previous design and incorporated the requirements of ANSI-N-271-1976 " Containment Isolation Provisions for Fluid Systems," which was not required for Grand

~

Gulf. Our A/E rejected the proposal and chose to retain the issued contract and specification (9645-C-153.0) requirements which has always specified seismically qualified air locks.

Conversations between our A/E and Mr. R. A. Maf fei (now with Danley Manuf acturing Co.) concerning his discussion with the HRC resulted in some confusion on Mr. Maffei's part as to how this " upgrade" was presented to the various projects and the reason for it. Mr. Maffei indicated that his recounting of the situation was somewhat hampered by his lack of access to past Woolley records.

MP&L and our A/E feel that the NRC should consider a reevaluation of the Part 21 report submitted by MP&L for potential generic effects on other plants. Installation of the modified system does not insure that the air lock systems installed at other plants were seismically qualified. The deficiency reported by MP&L was caused by the failure of the vendor to supply seismically qualified equipment as specified, not by our A/E's rejection of the " upgraded" '

or " modified" system.

i This letter also serves to document a September 20, 1984 telephone conversation between S. H. Hobbs and E. B. Shingleton of MP&L and Mr. R. E.

Carroll of the NRC.

Yours truly, L. F. Dale Director EBS/SHH:rg cc: Mr. J. B. Richard Mr. R. B. McGehee Mr. N. S. Reynolds Mr. G. B. Taylor Mr. Richard C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555