MONTHYEARML20217E0451999-09-30030 September 1999 Proposed Tech Specs Supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10 ML20211F9511999-08-26026 August 1999 Proposed Tech Specs Pages,Raising Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML20196E6541999-06-21021 June 1999 Proposed Tech Specs Pages for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20195B5531999-05-24024 May 1999 Proposed Tech Specs Correcting Typos & Editorial Errors. Corrections Are Considered to Be Administrative in Nature ML20196L1231999-05-17017 May 1999 Proposed Tech Specs Pages,Revising TS to Include Oscillation Power Range Monitor (OPRM) Sys ML20206G2111999-04-30030 April 1999 Proposed Tech Specs,Incorporating Programmatic Controls in Tech Specs for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20205E8101999-03-29029 March 1999 Proposed Tech Specs Incorporating Programmatic Controls for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20204J2871999-03-22022 March 1999 Proposed Tech Specs Bases Page B 3/4 8-1d,correcting Editorial Errors ML20204J1291999-03-22022 March 1999 Proposed Tech Specs Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 ML20202B6171999-01-19019 January 1999 Revised TS Bases 3/4.6.1.1,revised to Clarify When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML20198T0281998-12-30030 December 1998 Proposed Tech Specs Re Changes to Flood Protection TS LCO & Associated Action Statements ML20198N3981998-12-28028 December 1998 Proposed Tech Specs Permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys ML20198C9641998-12-16016 December 1998 Proposed Tech Specs Pages,Replacing Accelerated Testing Requirements of TS Table 4.8.1.1.2-1 with EDG Performance Monitoring & Deleting TS 4.8.1.1.3 Requirement to Submit 30- Day Special Rept for Diesel Failures ML20155D3591998-10-22022 October 1998 Proposed Tech Specs Page for Amend to License NPF-57, Establishing More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5871998-10-19019 October 1998 Proposed Tech Specs Section 3.0.4,eliminating Restrictions for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities ML20154L5021998-10-0808 October 1998 Revised Tech Spec Page,Which Corrects Editorial Errors ML20151X7321998-09-0808 September 1998 Proposed Tech Specs Permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4331998-08-25025 August 1998 Proposed Tech Specs,Implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs ML20236F1171998-06-25025 June 1998 Proposed Tech Specs Deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML20249A8181998-06-12012 June 1998 Proposed Tech Specs Re Increased Operational Flexibility During Periods of Elevated River Water Temp & Maintain Ultimate Heat Sink Operation within Design ML20247K7381998-05-13013 May 1998 Proposed Tech Specs Page Re Change to Inservice Leak & Hydrostatic Testing Requirements ML20217P9351998-04-28028 April 1998 Proposed Tech Specs Section 3/4.4.2,implementing More Appropriate SRV Setpoint Tolerances ML20216F4541998-03-0606 March 1998 Proposed TS Section 4.2.2 Re Terrestrial Ecology Monitoring ML20197H5941997-12-19019 December 1997 Proposed Tech Specs Pages,Revising TS Section 4.2.2, Terrestrial Ecology Monitoring, by Changing Wording to Include Completion of Salt Drift Monitoring Program ML20211M2401997-10-0303 October 1997 Proposed Tech Specs Pages Associated W/Slmcpr Changes ML20217D3761997-09-29029 September 1997 Proposed Tech Specs Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated ML20211F6201997-09-24024 September 1997 Proposed Tech Specs Section 3/4.5.1,adding Surveillance Requirement to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie-valves ML20211M2641997-08-26026 August 1997 Revised TS Bases Pages for Amend 101 to License NPF-57 ML20217Q6731997-08-26026 August 1997 Proposed Tech Specs,Requesting Rev to TS to Clarify Plant Basis for Compliance W/Frvs TS Requirements ML20198H2471997-08-26026 August 1997 Proposed Tech Specs Implementing Conservative Safety Limit Min Critical Power Ratio for Plant Cycle 7 Core & Fuel Designs ML20217Q3081997-08-25025 August 1997 Proposed Tech Specs Re Ultimate Heat Sink Temp & River Water Level Limits ML20210P3471997-08-20020 August 1997 Proposed Tech Specs Deleting References to Plant Suppression Pool Water Volume from TS & Supporting Planned Mods to ECCS Suction Strainers in Upcoming Refueling Outage ML20211M2531997-07-16016 July 1997 Sanitized Version of TS Page Changes Re SLMCPR ML20149G4301997-07-16016 July 1997 Proposed Tech Specs Implementing Appropriately Conservative Safety Limit Min Critical Power Ratio ML20141C1621997-06-19019 June 1997 Proposed Tech Specs Revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & to Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10% ML20140D2201997-05-30030 May 1997 Proposed Tech Specs,Providing marked-up Pages to Address NRC Reviewer Comments ML20141G8291997-05-19019 May 1997 Proposed Tech Specs Revising Ultimate Heat Sink Temp & River Water Level Limits Which Resolve TS Issues Related Issues Documented in Hope Creek Corrective Action Program ML20137N6271997-04-0101 April 1997 Proposed Tech Specs 4.6.1.1, Primary Containment Integrity, TS 3/4.6.1.2, Primary Containment Leakage, TS 3/4.6.1.3, Primary Containment Air Locks & TS 4.6.1.5.1, Primary Containment Structural Integrity ML20137M5961997-03-31031 March 1997 Proposed Tech Specs,Representing Changes to TS 2.1.2,action a.1.c for LCO 3.4.1.1 & Bases for TS 2.1 ML20137M1331997-03-31031 March 1997 Proposed Tech Specs Revising TS to Improve Consistency Between TS & Plant Configuration,Operation & Testing & Completing Required CA to Resolve Discrepancies Identified in CA Program ML20135E8101997-03-0303 March 1997 Proposed Tech Specs 3/4.3.1 Re Reactor Protection Sys instrumentation,3/4.3.2 Re Isolation Actuation Instrumentation & 3/4.3.3 Re Emergency Core Cooling Sys Actuation Instrumentation ML20134M0921997-02-11011 February 1997 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20134B5511997-01-24024 January 1997 Proposed Tech Specs 3.1.3.5 Re Control Rod Scram Accumulators ML20132F1791996-12-11011 December 1996 Revised Tech Specs Re Changes to TS Bases B 3/4.3.1, Reactor Protection Sys Instrumentation, & B 3/4.3.2, Isolation Actuation Instrumentation ML20135D6851996-12-0404 December 1996 Proposed Tech Specs 3.1.3.5, CR Scram Accumulators, for Improvement & Clarifies Statement of 961025 Initial Request ML20134F3831996-10-25025 October 1996 Proposed Tech Specs 3/4.3.1,3/4.3.2 & 3/4.3.3 Re Reactor Protection Sys Instrumentation,Isolation Actuation Instrumentation & Emergency Core Cooling Sys Actuation Instrumentation ML20134F4311996-10-25025 October 1996 Proposed Tech Specs 3.1.3.5 Control Rod Scram Accumulators ML18102A2561996-07-12012 July 1996 Proposed Tech Specs Re Qualifications of Operations Manager ML18101B3831996-05-22022 May 1996 Proposed Tech Specs,Requesting Approval of Changes to QA Program 1999-09-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217E0451999-09-30030 September 1999 Proposed Tech Specs Supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10 ML20216E6201999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 14 to Table of Contents & Rev 10 to Attachments 6,7 & 9 ML20211F9511999-08-26026 August 1999 Proposed Tech Specs Pages,Raising Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML20196E6541999-06-21021 June 1999 Proposed Tech Specs Pages for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20195B5531999-05-24024 May 1999 Proposed Tech Specs Correcting Typos & Editorial Errors. Corrections Are Considered to Be Administrative in Nature ML20196L1231999-05-17017 May 1999 Proposed Tech Specs Pages,Revising TS to Include Oscillation Power Range Monitor (OPRM) Sys ML20206T8941999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 12 to Table of Contents,Rev 8 to Attachment 8,Rev 8 to Attachment 7 & Rev 8 to Attachment 9 ML20206G2111999-04-30030 April 1999 Proposed Tech Specs,Incorporating Programmatic Controls in Tech Specs for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20206G2281999-03-31031 March 1999 Rev 18 to ODCM for Hope Creek Generating Station ML20205E8101999-03-29029 March 1999 Proposed Tech Specs Incorporating Programmatic Controls for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20204J2871999-03-22022 March 1999 Proposed Tech Specs Bases Page B 3/4 8-1d,correcting Editorial Errors ML20204J1291999-03-22022 March 1999 Proposed Tech Specs Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 ML20202B6171999-01-19019 January 1999 Revised TS Bases 3/4.6.1.1,revised to Clarify When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML20198T0281998-12-30030 December 1998 Proposed Tech Specs Re Changes to Flood Protection TS LCO & Associated Action Statements ML20198N3981998-12-28028 December 1998 Proposed Tech Specs Permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys ML20198C9641998-12-16016 December 1998 Proposed Tech Specs Pages,Replacing Accelerated Testing Requirements of TS Table 4.8.1.1.2-1 with EDG Performance Monitoring & Deleting TS 4.8.1.1.3 Requirement to Submit 30- Day Special Rept for Diesel Failures ML20155D3591998-10-22022 October 1998 Proposed Tech Specs Page for Amend to License NPF-57, Establishing More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5871998-10-19019 October 1998 Proposed Tech Specs Section 3.0.4,eliminating Restrictions for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities ML20154L5021998-10-0808 October 1998 Revised Tech Spec Page,Which Corrects Editorial Errors ML20151X7321998-09-0808 September 1998 Proposed Tech Specs Permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4331998-08-25025 August 1998 Proposed Tech Specs,Implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs ML20236F1171998-06-25025 June 1998 Proposed Tech Specs Deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML20249A8181998-06-12012 June 1998 Proposed Tech Specs Re Increased Operational Flexibility During Periods of Elevated River Water Temp & Maintain Ultimate Heat Sink Operation within Design ML20247K7381998-05-13013 May 1998 Proposed Tech Specs Page Re Change to Inservice Leak & Hydrostatic Testing Requirements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML20217P9351998-04-28028 April 1998 Proposed Tech Specs Section 3/4.4.2,implementing More Appropriate SRV Setpoint Tolerances ML20216F4541998-03-0606 March 1998 Proposed TS Section 4.2.2 Re Terrestrial Ecology Monitoring ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML20197H5941997-12-19019 December 1997 Proposed Tech Specs Pages,Revising TS Section 4.2.2, Terrestrial Ecology Monitoring, by Changing Wording to Include Completion of Salt Drift Monitoring Program ML20197H8511997-12-0808 December 1997 Rev 0 to IST Program Submittal Interval 2,Dec 21,1997 Through Dec 20,2006 ML20198J6431997-10-10010 October 1997 Rev 0 to 55-WP3/F43TB3-05, Weld Procedure ML20211M6121997-10-0707 October 1997 Cycle 4 Startup Physics Testing ML20211M2401997-10-0303 October 1997 Proposed Tech Specs Pages Associated W/Slmcpr Changes ML20217D3761997-09-29029 September 1997 Proposed Tech Specs Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated ML20211F6201997-09-24024 September 1997 Proposed Tech Specs Section 3/4.5.1,adding Surveillance Requirement to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie-valves ML20198H2471997-08-26026 August 1997 Proposed Tech Specs Implementing Conservative Safety Limit Min Critical Power Ratio for Plant Cycle 7 Core & Fuel Designs ML20217Q6731997-08-26026 August 1997 Proposed Tech Specs,Requesting Rev to TS to Clarify Plant Basis for Compliance W/Frvs TS Requirements ML20211M2641997-08-26026 August 1997 Revised TS Bases Pages for Amend 101 to License NPF-57 ML20217Q3081997-08-25025 August 1997 Proposed Tech Specs Re Ultimate Heat Sink Temp & River Water Level Limits ML20198J6541997-08-20020 August 1997 Rev 3 to 55-PQ7001-03, Procedure Qualification Record ML20198J6501997-08-20020 August 1997 Rev 5 to WP3/F43TB3-05, Welding Procedure Specification ML20210P3471997-08-20020 August 1997 Proposed Tech Specs Deleting References to Plant Suppression Pool Water Volume from TS & Supporting Planned Mods to ECCS Suction Strainers in Upcoming Refueling Outage ML20149G4301997-07-16016 July 1997 Proposed Tech Specs Implementing Appropriately Conservative Safety Limit Min Critical Power Ratio ML20211M2531997-07-16016 July 1997 Sanitized Version of TS Page Changes Re SLMCPR ML20141C1621997-06-19019 June 1997 Proposed Tech Specs Revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & to Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10% ML20140D2201997-05-30030 May 1997 Proposed Tech Specs,Providing marked-up Pages to Address NRC Reviewer Comments ML20141G8291997-05-19019 May 1997 Proposed Tech Specs Revising Ultimate Heat Sink Temp & River Water Level Limits Which Resolve TS Issues Related Issues Documented in Hope Creek Corrective Action Program ML20137N6271997-04-0101 April 1997 Proposed Tech Specs 4.6.1.1, Primary Containment Integrity, TS 3/4.6.1.2, Primary Containment Leakage, TS 3/4.6.1.3, Primary Containment Air Locks & TS 4.6.1.5.1, Primary Containment Structural Integrity ML20137M1331997-03-31031 March 1997 Proposed Tech Specs Revising TS to Improve Consistency Between TS & Plant Configuration,Operation & Testing & Completing Required CA to Resolve Discrepancies Identified in CA Program 1999-09-30
[Table view] |
Text
. . .-- . . _ - - - . - _ .
, l ELECTRICAL POWER SYSTEMS _
!i :
s 1 SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class 1E distribution system shall be:
- a. Determined OPERABLE at least once per 7 days by verifying correct breaker alignments and indicated power availability, and
- b. Demonstrated OPERABLE at least once per 18 months during shutdown by transferring, manually and automatically, unit power supply from the normal circuit to the alternate circuit.
4.8.1.1.2 Each of the above required diesel generators shall be demonstrated OPERABLE:
4.8.1.1.2-1 on a
- a. In accordance with the frequency specified in Table STAGGERED TEST BASIS by:
- 1. Verifying the fuel level in the fuel oil day tank.
- 2. Verifying the fuel level in the fuel oil. storage tank.
- 3. Verifying the fuel transfer pump starts and transfers fuel from the storage system to the fuel oil day tank.
- 4. Verifying the diesel starts from ambient conditions and accel-erates to at least 514 rpm in less than or equal to 10 seconds after receint a gnal." The g na g or voltage and volts and % he diesel estartsigna.g%zwithin fl.g A rrArra 2. 3950~ frequency shall 10 seconds after race w My ,
generator shall be started for this test by using one of the
- ~ following signals
a) Hanual.
b) Simulated loss of of fsite power by itself.
c)
Simulated loss of offsite power in conjunction with an ESF actuation test signal, i
d) An ESF actuation test signal by itself.
i l
S.
Verifying the diesel generator is synchronized, loa i
^ and operates with this load for at least 60 minutes,
~"The diesel generator start (10 sec) and subsequent loading (130 sec) from
' ambient conditions shall be performed at least once per 184 d f surveillance tests. testing may be preceded by an engine prelube period a this surveillance other warmup procedures recommended by the manufacturer so that mec stress and wear on the diesel engine is minimized.
- This band is meant as guidance to avoid routine overloading of the engine. ,
loads in excess of this band shall not invalidate the test; the loads, however, shall not be less than 4300 kw nor greater than 4430 kw.
3/4 8-4 HOPE CREEK 9510110045 951007 ,
PDR ADOCK 05000354 !
P. PDR
. :o
. m ELECTRICAL POWER SYSTEMS 'h g
SURVEILLANCE REQUIREMENTS (Continued) .
- 5. Verifying that on an ECCS actuation test signal, without loss of offsite power, the diesel generator, starts on the auto-start signal and operates on standby for greater than or equal-to 5 y39go minutes. The generator voltage and. frequency shall M N #[ 12F g 3-p.,p_ volts and ,50 _ 1.2-Hz within 10 seconds after the auto-start signali th'e steady state generator voltage and frequency shall ;
be maintained sithin th : limite during this test.
AT Miho 4. 42.o VAT > Mo 4,o 1 f.z &
- 6. Simulating a loss of offsite power in conjunction with an ECCS actuation test signal, and a) Verifying loss of power is detected and deenergization of the emergency busses and load shedding from the emergency busses, b) Verifying the diesel generator starts
- on the auto-start signal, energizes the emergency busses with permanently connected loads within 10 seconds after receipt of the start signal, energizes the autoconnected shutdown loads
. through the load sequencer and operates for greater than or equal to.5 minutes while its generator is loaded with the emergency loads. After energization, the steady state voltage and frequency of the emergency busses shall be , ,
maintained at 4160 420 volts and 60 1.2 Hz during '
this test.
- 7. Verifying that all automatic diesal generator trips, except engine overspeed, generator differential current, generator overcurrent, bus differential current and low lube oil pressure are automatically bypassed upon loss of voltage on the emergency bus concurrent with an ECCS actuation signal.#
{ . . . .
- 8. Deleted.
i
- 9. Verifying that the auto-connected loads to each diesel generator do not exceed the continuous rating of 4430 kW. ;
- This diesel generator start (10 see) and subsequent loading (130 see) from ambient conditions may be preceded by an engine prelube period and/or other warmup procedures recommended by.the manufacturer so that mechanical stress and wear on the diesel engine is minimized.
8 Generator differential current, generator overcurrent, and bus differential current'is two-out-of-three logic and lcw lube oil pressure is two-out-of- four logic. ,
HOPE CREEK '
3/4 8-7 Amendment No. 72 }
i e
I' ELECTRICAL 294ER SYSTEMS j SURVEILLANCE REQUIREMENTS (Continued)
+1 2. Performing a pressure test of those portions of the diesel fuel 4
{
}.
oil system designed to Section III, subsection ND of the ASME Code in accordance with ASME Code Section XI Article IWD-5000.
T l-. k. At least once per refueling cycle # by:
T W 1. Verifying the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
fg og During the first 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator f{ shall be loaded to between'4300 and 4400 kW## and during the
> g remaining 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be g7 loaded to between 4800 and 4873 kW. The generator voltage and a frequency shall 4 be-4150 _ 00 volts and 60 _ 1.2,Hz within 102 g g {y g g qM N seconds after the start signal; the steady state generator e ithir thccc limit:
Ud voltages and frequency shall be maintainedp# *l o Mw vests, MD Act i.2 N s.
during the test.
fA ATTW GJ 2. Within 5 minutes after completing 4.8.1.1.2.k.1, verify that the k . diesel generator starts and 2 chi; n r voltage and frequency of f8 2%9 0100 - !2e volts and 00 ; 1.2 Hz within 10 seconds after the start signal. '1his testi shall continue for at least five k<4d 3 -
minutes .\i.% ear A j I 2SW M' - OR-ATTN 4 J :
$ e2 d. -
Operate the diesel generator between 4300 kW an 4400 kW for two Eo hours. Within 5 minutes of shutting down the iesel generator, WdT verify that the diesel generator starts and achiaco voltage and
[LLT 2316p frequency of $100 _ 1:0 volts and ~. _ _. .,z within 10 seconds after the start signal.
This test shall continue for at least five minutes. g eern g gg .g.
J 4.8.1.1.3 Reports - All diesel generator failures, valid or non-valid, shall be a reported to the Commission within 30 days pursuant to Specification 6.9.2. ,
Reports of diesel generator failures shall include the information recommended in Regulatory Position C.3.b of Regulatory Guide 1.108, Revision 1, August 1977. If the number of failures in the last 100 valid tests, on a per nuclear unit basis, is greater than or equal to 7, the report shall be supplemented to include the additional information recommended in Regulatory Position C.3.b of Regulatory Guide 1.108, Revision 1, August 1977 ,
4.8.1.1.4 The buried fuel oil transfer piping's cathodic protection system shall be demonstrated OPERABLE at least once per 2 months and at least once per year by subjecting the cathodic protection system to a performance test.
For any start of a diesel generator, the diesel must be loaded in accordance with manufacturer's recommendations. i This band is meant as guidance to avoid routine overloading of the engine. l Loads in excess of this band shall not invalidate the test; the loads; however, I shall not be less that 4300 kW nor greater that 4873 kW. l l
2 HOPE CREEK 3/4 8-9 Amendment No. O , 72 l
\