Proposed Tech Specs Page Re Change to Inservice Leak & Hydrostatic Testing Requirements
ML20247K738
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 05/13/1998
From:
Public Service Enterprise Group
To:
Shared Package
ML20247K735 List:
References
NUDOCS 9805220194
Download: ML20247K738 (1)


Text

1

. , . .. l SPEC 2AL TEST EXCEPT2ONS 3/4.10.8 INSERVICE LEAK AND HYDROSTATIC TESTING LIMITING CONDITION FOR OPERATION l 3.10.8 When conducting inservice leak or hydrostatic testing, the average >

reactor coolant temperature specified in Table 1.2 for OPERATIONAL CONDITION 4 I may be increased to 212'F, and operation considered not to be in OPERATIONAL j CONDITION 3, tc, allow performance of an inservice leak or hydrostatic test provided the following OPERATIONAL CONDITION 3 LCO's are mots j a. 3.3.2, " ISOLATION ACTUATION INSTRUMENTATION", Functions 2.a, 2.b, l 2.c, 2.d and 2.e of Table 3.3.2-1; l

b. 3.6.5.1, "SECOI;DARY CONTAINMENT INTEGRITY"; l l
c. 3.6.5.2, " SECONDARY CONTAINMI T AUTOMATIC ISOLATION DAMPERS *; and
d. 3.6.5.3, " FILTRATION, RECIRCULATION AND VENTILATION SYSTEM."

l APPLICABILITY: OPERATIONAL CONDITION 4, with average reactor coolant temperature > 200*F.

ACTION:

With the requirements of the above specification not satisfied, immediately l enter the applicable condition of the affected specification or immediately l suspend activities that could increase the average reactor coolant temperature or pressure and reduce the average reactor coolant temperature to n 200*F within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.10.8 verify applicable OPERATIONAL CONDITION 3 surveillance for specifications listed in 3.10.8 are met.

i 9805220194 980513 PDR ADOCK 05000354 P PDR HOPE CREEK 3/4 10-8 Amendment No. 69

-