ML20137M133

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Revising TS to Improve Consistency Between TS & Plant Configuration,Operation & Testing & Completing Required CA to Resolve Discrepancies Identified in CA Program
ML20137M133
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/31/1997
From:
Public Service Enterprise Group
To:
Shared Package
ML20137M112 List:
References
NUDOCS 9704080019
Download: ML20137M133 (2)


Text

- - . . - . - _ . . . . . . _ _ . _ - - .-

W HOPE CREEK GENERATING STATION

. FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 REVISIONS TO THE TECHNICAL SPECIFICATIONS (TS) 1 TECHNICAL SPECIFICATION PAGES WITH PROPOSED CHANGES The following Technical Specifications for Facility Operating License No. NPF-57 are affected by this change request: i Technical Specification Page  !

3.6.5.3.2 3/4 6-52a ,

'4.6.5.3.2.b 3/4 6-52a  !

t I

i l

K P  ;

i

. c, .

. .,,.m . . . - . . . . _

.c.

er 4 -

..,,,a* e i

, ,,  ;; . +

=

M;21 '. .- .s q ;3g, _ / _

_,_ _ 3; . - - - 2 - 2 '

' CONTAINMENT SYSTEMS -

3.6.5.3 FILTRATION, RECIRCULATION AND VENTILATION SYSTEM (FRVS)

FRVS RECIRCULATION SUBSYSTEM  :

LIMITING CONDITION FOR OPERATION 3.6.5.3.2 RVS recirculation units shall be OPERABLE.

5 APPLICA8ILITY: OPERATIONAL CONDITIONS 1, 2, 3 and *.

ACTION: om. oA

a. With e d f the above required FRVS recirculation units inoperable, restorea the inoperable unit to OPERABLE status within 7 days, or:

n% (a5)

1. In OPERATIONAL CONDITION 1, 2, or 3, be in at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2. In Operational Condition *, suspend handling of irradiated fuel in the secondary containment, CORE ALTERATIONS and operations with a potential for draining the reactor vessel. The ions of Specification 3.0.3 are not applicable.

s t uf ro"->

b. With of the above required FRVS recirculation units inoperable l in Operational Condition *, suspend handling of irradiated fuel in the secondary containment, CORE ALTERATIONS or operations with a potential for draining the reactor vessel. The provisions of (c2HaQn 1 are nntynliembl% -- m C. 4 A.,,,

you aI, '2; m or%3,r,p,.4 M untu OfotAllem Lodomod W v- o pm Q gor g,.u,,

SWoloc M4m.9u+bt W N4 r 1 duRVE M ^QUIREMEN & N ves A h foto FuibowcJ AW W 4%w'% 2 4 hen,

~

n 4.6.5.3.2 Each of the six FRVS recirculation units shall be demonstrated OPERABLE: l

a. At least once per 14 days by verifying that the water seal bucket traps have a water seal and making up any evaporative losses by filling the traps to the overflow,
b. At least once per 31 days by initiating, from the control room, flow through the HEPA filters and charcoal adsorbers and verifying th t the subsystem operates for at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the' heaters n .

~

order to reduce the buildup of moisture on the carbon adsorbers%nd l HEPA filters.  !

OfC(tMbLc .

! CORE ALTERATIONS and operations with a potential for draining the reactor -

vessel.

i ~

i  : -,m -

. QDhaynrqf 3 J +y; _ . g:;L;.pp. , ,+ ,h gy g &g  % M Q;'~

L m3ptg:"

w : ,p +.~D

m . Amendmen t , No. W

~ ,~ 'H0PE .~.m.wgm30+ 4944.

CREEK' -3 6 -

x.:,w.-. .

9 .w y ,e.n w/.4 p m-52a :. L.; + 4 . g,u - .

y y .w q

  • mcMwh3%.cObo&9*tet;3&&"TQYi@ntyfW?yfgjW?"'TMkM@Mt%'MMW7')*RQt@QRWif xy y ;wm3 ; n :c :; u ,m. yggy a .,. :m .t. . ( -w

.  :::e 3y.e;umppm

- ee m;;g  ;

+ __-I