Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20217E0371999-09-30030 September 1999 Application for Amend to License NPF-57,supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10.Proprietary & non-proprietary Info Re Subject Amend,Encl. Proprietary Info Withheld,Per 10CFR2.790(a)(4) LR-N990357, Application for Amend to License NPF-57,to Change TS to Raise Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool1999-08-26026 August 1999 Application for Amend to License NPF-57,to Change TS to Raise Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML18107A3571999-06-0404 June 1999 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57 Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New,Affiliated Nuclear Generating Company, PSEG Nuclear Llc.Proprietary Encls Withheld ML20195B5461999-05-24024 May 1999 Application for Amend to License NPF-57,correcting Typos & Editorial Errors Contained in Ts.Corrections Are Considered to Be Administrative in Nature LR-N990137, Application for Amend to License NPF-57 to Revise TS to Include Oscillation Power Range Monitor (OPRM) Sys,In Preparation for Plans to Fully Enable OPRM Trip Function During Ninth Refueling Outage,Scheduled for Apr 22,20001999-05-17017 May 1999 Application for Amend to License NPF-57 to Revise TS to Include Oscillation Power Range Monitor (OPRM) Sys,In Preparation for Plans to Fully Enable OPRM Trip Function During Ninth Refueling Outage,Scheduled for Apr 22,2000 ML20206G0651999-03-29029 March 1999 Redistributed Application for Amend to License NPF-57, Incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements.Rev 18 to ODCM Also Encl ML20205E7931999-03-29029 March 1999 Application for Amend to License NPF-57,incorporating Programmatic Controls in TS for Radioactive Effluents & Environ Monitoring,Conforming to Applicable Regulatory Requirements ML20198T0131998-12-30030 December 1998 Application for Amend to License NPF-57,proposing Rev to Flood Protection TS LCO & Associated Action Statements ML20198N3901998-12-28028 December 1998 Application for Amend to License NPF-57,permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys LR-N980532, Application for Amend to License NPF-57,revising TS by Replacing Accelerated Testing Requirements of TS Table 4.8.1.2-1 with EDG Performance Monitoring & Delete TS 4.8.1.1.3 Requirement to Submit 30-day Special Rept1998-12-16016 December 1998 Application for Amend to License NPF-57,revising TS by Replacing Accelerated Testing Requirements of TS Table 4.8.1.2-1 with EDG Performance Monitoring & Delete TS 4.8.1.1.3 Requirement to Submit 30-day Special Rept ML20155D3441998-10-22022 October 1998 Application for Amend to License NPF-57,to Revise TS to Establish More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5821998-10-19019 October 1998 Application for Amend to License NPF-57,eliminating Restrictions Imposed by TS 3.0.4 for Filtration, Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities LR-N980363, Application for Amend to License NPF-57,permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries1998-09-0808 September 1998 Application for Amend to License NPF-57,permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4301998-08-25025 August 1998 Application for Amend to License NPF-57,implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs.Proprietary & non-proprietary Description of Revs to TS Encl.Proprietary Info Withheld ML20236F1121998-06-25025 June 1998 Application for Amend to License NPF-57,deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML20249A8101998-06-12012 June 1998 Application for Amend to License NPF-57,providing Increased Operational Flexibility During Periods of Elevated River Water Temp & Maintaining Ultimate Heat Sink Operation within Design.Engineering Analyses Also Encl ML20247K7301998-05-13013 May 1998 Application for Amend to License NPF-57,revising TS Inservice Leak & Hydrostatic Testing Requirements.Review Is Requested by 981220,to Support Next Refueling Outage ML20217P9221998-04-28028 April 1998 Application for Amend to License NPF-57,revising TS 3/4.4.2 by Implementing More Appropriate SRV Setpoints.Proprietary GE TR NEDC-32511P, Safety Review for Hope Creek SRV Tolerance Analysis, Encl.Proprietary Info Withheld LR-N970670, Application for Amend to License NPF-57,requesting Rev to App B of TS 4.2.2, Terrestrial Ecology Monitoring, by Rewording Section to Include Completion of Salt Drift Monitoring Program Which Was Completed in Mar 19891997-12-19019 December 1997 Application for Amend to License NPF-57,requesting Rev to App B of TS 4.2.2, Terrestrial Ecology Monitoring, by Rewording Section to Include Completion of Salt Drift Monitoring Program Which Was Completed in Mar 1989 LR-N970622, Application for Amend to License NPF-57,revising TS 3/4.11.1, Liquid Effluents - Concentration, by Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated1997-09-29029 September 1997 Application for Amend to License NPF-57,revising TS 3/4.11.1, Liquid Effluents - Concentration, by Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated LR-N970618, Application for Amend to License NPF-57,adding Surveillance Requirement in Section 3/4.5.1 to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie Valves1997-09-24024 September 1997 Application for Amend to License NPF-57,adding Surveillance Requirement in Section 3/4.5.1 to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie Valves ML20211M2571997-08-26026 August 1997 Sanitized Supplement to 970331 & 970716 Applications for Amend to License NPF-57,revising Ts.Addl Info & Revised TS Bases Pages Associated W/Amend 101 ML20217Q6641997-08-26026 August 1997 Application for Amend to License NPF-57,requesting Rev to TS to Clarify Plant Basis for Compliance W/Frvs TS Requirements ML20210P3341997-08-20020 August 1997 Application for Amend to License NPF-57,deleting References to Plants Suppression Pool Water Volume from TS & Supporting Planned Mods to ECCS Suction Strainers in Upcoming Refueling Outage,Per NRC Bulletin 96-003 ML20211M2451997-07-16016 July 1997 Sanitized Version of Supplement to 970331 Application for Amend to License NPF-57,revising TS & Providing Revised SLMCPR Values for Upcoming Operating Cycle (Cycle 8) ML20149G4271997-07-16016 July 1997 Supplements Application for Amend to License NPF-57, Submitted 970331.Supplement Provides Revised SLMCPR Values for Upcoming Operating Cycle (Cycle 8).TSs & Proprietary Info Re SLMCPR Changes,Encl.Proprietary Info,Withheld LR-N970217, Application for Amend to License NPF-7,revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10%1997-06-19019 June 1997 Application for Amend to License NPF-7,revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10% ML20141G8221997-05-19019 May 1997 Application for Amend to License NPF-57,revising Ultimate Heat Sink Temp & River Water Level Limits Which Resolve TS Related Issues Documented in Hope Creek Corrective Action Program ML20140F0261997-04-30030 April 1997 Application for Transfer of Control Re Operating License NPF-57 for Hcngs.Joint Proxy Statement/Prospectus Describing Details of Util Agreement & Plant of Merger W/Delmarva Power & Light Co,Encl LR-N970183, Application for Amend to License NPF-57,requesting Mod to Listed TSs to Adopt Option B of 10CFR50,App J1997-04-0101 April 1997 Application for Amend to License NPF-57,requesting Mod to Listed TSs to Adopt Option B of 10CFR50,App J ML20137M1061997-03-31031 March 1997 Application for Amend to License NPF-57,revising TS to Improve Consistency Between TS & Plant Configuration, Operation & Testing & Complete Required CA to Resolve TS Discrepancies Identified in CA Program ML20137M5811997-03-31031 March 1997 Application for Amend to License NPF-57,representing Changes to TS 2.1.2,action a.1.c for LCO 3.4.1.1 & Bases for TS 2.1. Info Re Safety Limit Min Critical Power Ratio Changes Encl. Info Withheld ML20135E8041997-03-0303 March 1997 Application for Amend to License NPF-57,changing TS 3/4.3.1, Reactor Protection Sys Instrumentation, 3/4.3.2, Isolation Actuation Instrumentation & 3/4.3.3, Emergency Core Cooling Sys Actuation Instrumentation ML20134M0771997-02-11011 February 1997 Application for Amend to License NPF-57,requesting Rev to 3/4.8 Re Electrical Power Systems for Improvements to EDG ML20134B5441997-01-24024 January 1997 Application for Amend to License NPF-57,changing TS 3.1.5, Control Rod Scram Accumulators ML20134F4231996-10-25025 October 1996 Application for Amend to License NPF-57,requesting Rev to 3.1.3.5 Re Control Rod Scram Accumulators ML20117K1231996-08-30030 August 1996 Application for Amend to License NPF-57,changing FSAR Decoupling SSE from LOCA ML18102A2541996-07-12012 July 1996 Suppls to Application for Amend to Licenses DPR-70,DPR-75 & NPF-57 Re Qualifications of Operations Manager ML20100R0841996-03-0606 March 1996 Application for Amend to License NPF-57,revising Diesel Fuel Oil Storage & Transfer Requirements ML18101B2501996-02-26026 February 1996 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57, Revising TS Section 6.0 Re Administrative Controls of Plant ML20097C5671996-02-0505 February 1996 Application for Amend to License NPF-57,revising SR 4.6.2.2.b & 4.6.2.3.b to Include Flow Through RHR Heat Exchanger Bypass Line in SPC & Suppression Pool Spray Flow Path Used During RHR Pump Testing ML18101B1751996-01-11011 January 1996 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57, Revising TS Section 6.0 Re Administrative Controls & Replacing Specific Mgt Titles W/Generic Mgt Functional Positions ML20099L6571995-12-28028 December 1995 Application for Amend to License NPF-57,revising TS Definition 1.4 Re Channel Calibr to Ensure Required Testing Methodology Aligns W/Std Industry Methodology for Instrument Channels Having T/C or RTD as Sensor ML20098D0011995-10-0707 October 1995 Application for Amend to License NPF-57,revising SR 4.8.1.1.2 Re Testing of EDGs to Be Consistent W/Applicable Licensing Documents Used for Development of EDG Surveillance ML20086T6991995-07-27027 July 1995 Application for Amend to License NPF-57,revising Ts,By Incorporating Updated Pressure Vs Temperature Operating Limit Curves Contained in TS Figure 3.4.6.1-1 ML20083B9591995-05-0404 May 1995 Application for Amend to App a of License NPF-57,increasing Annual Operational Limit for Drywell & Suppression Chamber Purge Sys from 120 H to 500 H ML20082T3351995-04-18018 April 1995 Application for Amend to License NPF-57,revising TS Table 4.3.7.1-1, Radiation Monitoring Instrumentation SRs by Extending Channel Functional Test Interval from Monthly to Quarterly for Each Instrument ML20082C1171995-03-30030 March 1995 Application for Amend to License NPF-57 for Hope Creek Generating Station.Amend Would Eliminate Selected Response Time Testing Requirements from TS & Associated Bases Changes ML20078C8351995-01-20020 January 1995 Application for Amend to License NPF-57,to Remove Specification from TSs & Relocates Bases to Plant UFSAR & Surveillance Requirements to Applicable Surveillance Procedures ML20078C8141995-01-20020 January 1995 Application for Amend to License NPF-57,to Revise Surveillance Requirement 4.1.3.1.2.b Re CR Immovable as Result of Excessive Friction or Mechanical Interference 1999-09-30
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217E0371999-09-30030 September 1999 Application for Amend to License NPF-57,supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10.Proprietary & non-proprietary Info Re Subject Amend,Encl. Proprietary Info Withheld,Per 10CFR2.790(a)(4) ML20211N5471999-09-0808 September 1999 Amend 121 to License NPF-57 Revising TSs by Locating Procedural Details of RETS to Offsite Dose Calculation Manual LR-N990357, Application for Amend to License NPF-57,to Change TS to Raise Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool1999-08-26026 August 1999 Application for Amend to License NPF-57,to Change TS to Raise Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML18107A3571999-06-0404 June 1999 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57 Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New,Affiliated Nuclear Generating Company, PSEG Nuclear Llc.Proprietary Encls Withheld ML20195B5461999-05-24024 May 1999 Application for Amend to License NPF-57,correcting Typos & Editorial Errors Contained in Ts.Corrections Are Considered to Be Administrative in Nature LR-N990137, Application for Amend to License NPF-57 to Revise TS to Include Oscillation Power Range Monitor (OPRM) Sys,In Preparation for Plans to Fully Enable OPRM Trip Function During Ninth Refueling Outage,Scheduled for Apr 22,20001999-05-17017 May 1999 Application for Amend to License NPF-57 to Revise TS to Include Oscillation Power Range Monitor (OPRM) Sys,In Preparation for Plans to Fully Enable OPRM Trip Function During Ninth Refueling Outage,Scheduled for Apr 22,2000 ML20205E7931999-03-29029 March 1999 Application for Amend to License NPF-57,incorporating Programmatic Controls in TS for Radioactive Effluents & Environ Monitoring,Conforming to Applicable Regulatory Requirements ML20206G0651999-03-29029 March 1999 Redistributed Application for Amend to License NPF-57, Incorporating Programmatic Controls in TS for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements.Rev 18 to ODCM Also Encl ML20198T0131998-12-30030 December 1998 Application for Amend to License NPF-57,proposing Rev to Flood Protection TS LCO & Associated Action Statements ML20198N3901998-12-28028 December 1998 Application for Amend to License NPF-57,permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys LR-N980532, Application for Amend to License NPF-57,revising TS by Replacing Accelerated Testing Requirements of TS Table 4.8.1.2-1 with EDG Performance Monitoring & Delete TS 4.8.1.1.3 Requirement to Submit 30-day Special Rept1998-12-16016 December 1998 Application for Amend to License NPF-57,revising TS by Replacing Accelerated Testing Requirements of TS Table 4.8.1.2-1 with EDG Performance Monitoring & Delete TS 4.8.1.1.3 Requirement to Submit 30-day Special Rept ML20155D3441998-10-22022 October 1998 Application for Amend to License NPF-57,to Revise TS to Establish More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5821998-10-19019 October 1998 Application for Amend to License NPF-57,eliminating Restrictions Imposed by TS 3.0.4 for Filtration, Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities LR-N980363, Application for Amend to License NPF-57,permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries1998-09-0808 September 1998 Application for Amend to License NPF-57,permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4301998-08-25025 August 1998 Application for Amend to License NPF-57,implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs.Proprietary & non-proprietary Description of Revs to TS Encl.Proprietary Info Withheld ML20236F1121998-06-25025 June 1998 Application for Amend to License NPF-57,deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML20249A8101998-06-12012 June 1998 Application for Amend to License NPF-57,providing Increased Operational Flexibility During Periods of Elevated River Water Temp & Maintaining Ultimate Heat Sink Operation within Design.Engineering Analyses Also Encl ML20247K7301998-05-13013 May 1998 Application for Amend to License NPF-57,revising TS Inservice Leak & Hydrostatic Testing Requirements.Review Is Requested by 981220,to Support Next Refueling Outage ML20217P9221998-04-28028 April 1998 Application for Amend to License NPF-57,revising TS 3/4.4.2 by Implementing More Appropriate SRV Setpoints.Proprietary GE TR NEDC-32511P, Safety Review for Hope Creek SRV Tolerance Analysis, Encl.Proprietary Info Withheld LR-N970670, Application for Amend to License NPF-57,requesting Rev to App B of TS 4.2.2, Terrestrial Ecology Monitoring, by Rewording Section to Include Completion of Salt Drift Monitoring Program Which Was Completed in Mar 19891997-12-19019 December 1997 Application for Amend to License NPF-57,requesting Rev to App B of TS 4.2.2, Terrestrial Ecology Monitoring, by Rewording Section to Include Completion of Salt Drift Monitoring Program Which Was Completed in Mar 1989 ML20199C1411997-11-0606 November 1997 Amend 108 to License NPF-57,changes TS 3/4.11.1, Liquid Effluent-Concentration. Change Adds Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Station Service Water Sys LR-N970622, Application for Amend to License NPF-57,revising TS 3/4.11.1, Liquid Effluents - Concentration, by Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated1997-09-29029 September 1997 Application for Amend to License NPF-57,revising TS 3/4.11.1, Liquid Effluents - Concentration, by Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated LR-N970618, Application for Amend to License NPF-57,adding Surveillance Requirement in Section 3/4.5.1 to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie Valves1997-09-24024 September 1997 Application for Amend to License NPF-57,adding Surveillance Requirement in Section 3/4.5.1 to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie Valves ML20217Q6641997-08-26026 August 1997 Application for Amend to License NPF-57,requesting Rev to TS to Clarify Plant Basis for Compliance W/Frvs TS Requirements ML20211M2571997-08-26026 August 1997 Sanitized Supplement to 970331 & 970716 Applications for Amend to License NPF-57,revising Ts.Addl Info & Revised TS Bases Pages Associated W/Amend 101 ML20210P3341997-08-20020 August 1997 Application for Amend to License NPF-57,deleting References to Plants Suppression Pool Water Volume from TS & Supporting Planned Mods to ECCS Suction Strainers in Upcoming Refueling Outage,Per NRC Bulletin 96-003 ML20149G4271997-07-16016 July 1997 Supplements Application for Amend to License NPF-57, Submitted 970331.Supplement Provides Revised SLMCPR Values for Upcoming Operating Cycle (Cycle 8).TSs & Proprietary Info Re SLMCPR Changes,Encl.Proprietary Info,Withheld ML20211M2451997-07-16016 July 1997 Sanitized Version of Supplement to 970331 Application for Amend to License NPF-57,revising TS & Providing Revised SLMCPR Values for Upcoming Operating Cycle (Cycle 8) LR-N970217, Application for Amend to License NPF-7,revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10%1997-06-19019 June 1997 Application for Amend to License NPF-7,revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10% ML20141G8221997-05-19019 May 1997 Application for Amend to License NPF-57,revising Ultimate Heat Sink Temp & River Water Level Limits Which Resolve TS Related Issues Documented in Hope Creek Corrective Action Program ML20140F0261997-04-30030 April 1997 Application for Transfer of Control Re Operating License NPF-57 for Hcngs.Joint Proxy Statement/Prospectus Describing Details of Util Agreement & Plant of Merger W/Delmarva Power & Light Co,Encl LR-N970183, Application for Amend to License NPF-57,requesting Mod to Listed TSs to Adopt Option B of 10CFR50,App J1997-04-0101 April 1997 Application for Amend to License NPF-57,requesting Mod to Listed TSs to Adopt Option B of 10CFR50,App J ML20137M1061997-03-31031 March 1997 Application for Amend to License NPF-57,revising TS to Improve Consistency Between TS & Plant Configuration, Operation & Testing & Complete Required CA to Resolve TS Discrepancies Identified in CA Program ML20137M5811997-03-31031 March 1997 Application for Amend to License NPF-57,representing Changes to TS 2.1.2,action a.1.c for LCO 3.4.1.1 & Bases for TS 2.1. Info Re Safety Limit Min Critical Power Ratio Changes Encl. Info Withheld ML20135E8041997-03-0303 March 1997 Application for Amend to License NPF-57,changing TS 3/4.3.1, Reactor Protection Sys Instrumentation, 3/4.3.2, Isolation Actuation Instrumentation & 3/4.3.3, Emergency Core Cooling Sys Actuation Instrumentation ML20134M0771997-02-11011 February 1997 Application for Amend to License NPF-57,requesting Rev to 3/4.8 Re Electrical Power Systems for Improvements to EDG ML20134B5441997-01-24024 January 1997 Application for Amend to License NPF-57,changing TS 3.1.5, Control Rod Scram Accumulators ML20134F4231996-10-25025 October 1996 Application for Amend to License NPF-57,requesting Rev to 3.1.3.5 Re Control Rod Scram Accumulators ML20117K1231996-08-30030 August 1996 Application for Amend to License NPF-57,changing FSAR Decoupling SSE from LOCA ML18102A2541996-07-12012 July 1996 Suppls to Application for Amend to Licenses DPR-70,DPR-75 & NPF-57 Re Qualifications of Operations Manager ML20100R0841996-03-0606 March 1996 Application for Amend to License NPF-57,revising Diesel Fuel Oil Storage & Transfer Requirements ML18101B2501996-02-26026 February 1996 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57, Revising TS Section 6.0 Re Administrative Controls of Plant ML20097C5671996-02-0505 February 1996 Application for Amend to License NPF-57,revising SR 4.6.2.2.b & 4.6.2.3.b to Include Flow Through RHR Heat Exchanger Bypass Line in SPC & Suppression Pool Spray Flow Path Used During RHR Pump Testing ML18101B1751996-01-11011 January 1996 Application for Amends to Licenses DPR-70,DPR-75 & NPF-57, Revising TS Section 6.0 Re Administrative Controls & Replacing Specific Mgt Titles W/Generic Mgt Functional Positions ML20099L6571995-12-28028 December 1995 Application for Amend to License NPF-57,revising TS Definition 1.4 Re Channel Calibr to Ensure Required Testing Methodology Aligns W/Std Industry Methodology for Instrument Channels Having T/C or RTD as Sensor ML20098D0011995-10-0707 October 1995 Application for Amend to License NPF-57,revising SR 4.8.1.1.2 Re Testing of EDGs to Be Consistent W/Applicable Licensing Documents Used for Development of EDG Surveillance ML20086T6991995-07-27027 July 1995 Application for Amend to License NPF-57,revising Ts,By Incorporating Updated Pressure Vs Temperature Operating Limit Curves Contained in TS Figure 3.4.6.1-1 ML20083B9591995-05-0404 May 1995 Application for Amend to App a of License NPF-57,increasing Annual Operational Limit for Drywell & Suppression Chamber Purge Sys from 120 H to 500 H ML20082T3351995-04-18018 April 1995 Application for Amend to License NPF-57,revising TS Table 4.3.7.1-1, Radiation Monitoring Instrumentation SRs by Extending Channel Functional Test Interval from Monthly to Quarterly for Each Instrument ML20082C1171995-03-30030 March 1995 Application for Amend to License NPF-57 for Hope Creek Generating Station.Amend Would Eliminate Selected Response Time Testing Requirements from TS & Associated Bases Changes 1999-09-08
[Table view] |
Text
i
. 1
$ e Public Servtc0 Electnc and Gas Cornpany Louis F. Storz Pubhc Service Electnc and Gas Company P.O. Box 236, Hancocks Bndge, NJ 08038 600-339-5700 Gerwor Vice Proskient . Nuclear Operahors DCT 071995 LR-N95173 LCR 95-23 United States Nuclear Regulatory Commission j Document Control Desk Washington, DC 20555 Gentlemen:
LICENSE ANENDNENT APPLICATION REVISION OF SURVEILLANCE 4.8.1.1.2 i HOPE CREEK GENERATING STATION l FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 This letter submits an application for amendment to Appendix A of l Facility Operating License NPF-57 for the Hope Creek Generating Station, and is being filed in accordance with 10CFR50.90.
Pursuant to the requirements of 10CFR50.91(b) (1) , a copy of this request for amendment has been sent to the State of New Jersey.
The proposed Technical Specification change revises Surveillance Requirement 4.8.1.1.2, pertaining to testing of Emergency Diesel Generators (EDGs) to be consistent with the applicable licensing documents used for the development of the EDG surveillances.
Specifically, this License Change Request eliminates the voltage and frequency bands now specified to be met for the unloaded start time testing and replaces them with minimum values. The change clarifies any need to ensure stabilization of voltage and frequency within ten seconds. This stabilizing criteria, 1
however, is maintained during steady state operation of the EDGs.
This request does not change the intent of the current Technical Specification as described in design basis documents, but i provides a more explicit statement of the testing requirement.
The implementation of this change will eliminate unnecessary Limiting Condition for Operation (LCO) entry, prevent unnecessary diesel testing due to unnecessary timing criteria, and ensure consistent timing results that can be trended for EDG degradations.
l 9510110041 951007 PDR 0k0 ADOCK 05000354 1
.P PDR f) v
@ Pnntedon Recycled Paper l
i l Docyment Control Desk LR-N95173 OCT 071995 The proposed change has been evaluated in accordance with 10CFR50.91(a) (1) , using the criteria in 10CFR50.92 (c) , and it has been determined that this request involves no significant hazards considerations. !
A description of the requested amendment, supporting information and analyses for the change, and the basis for a no significant hazards consideration determination are provided in Attachment 1. -
, The Technical Specification pages affected by the proposed change are provided in Attachment 2 with pen and ink changes.
1 4 Should you have any questions regarding this request, we will be l
pleased to discuss them with you.
Sincerely, i
/ (7264 ,
i t
i Affidavit Attachments (2) 1
}
t
r i
Document, Control Desk ' LR-N95173 OCT 071995 C Mr. T. T. Martin, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road
. King of Prussia, PA 19406 Mr. D. Jaffe, Licensing Project Manager - Hope Creek U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 3
Rockville, MD. 20852 4 .
Mr. R. Summers (X24)
USNRC Senior Resident Inspector Mr. K. Tosch, Manager IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 j Trenton, NJ 08625 I-1 i'
s 4
4 4
4 s
-__-_-_----__.--u -_ma---
x
.. g REF: LR-N95173 LCR 95-23 STATE OF NEW JERSEY )
) SS. ,
COUNTY OF SALEM )
,L. F. Storz, being duly sworn according to law deposen and says:
I am Senior.Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning the Hope Creek
. Generating Station, are true to the best of my knowledge, information and belief.
E
.b5 r-
[
/- -
U Subscribe and Sworn to before me e this 7 day of dhd61 1995 MAA htarykdblic'ofNewJersey JENNIFER M. TURNER NOTARY PUBUC 0F NEW JERSEY My Commission expires on l
4 I
1 .
1 i LR-tl95173 LCR 95-23 4
+
ATTACHMENT 1 I PROPOSED TECHNICAL SPECIFICATION CHANGE l HOPE CREEK GENERATING STATION 1 FACILITY OPERATING LICENSE NO. NPF-57 DOCKET NO. 50-354
- 1 4
4 2
l I
1 l
l i ,
1 l
l 4
4
, LR-N95.173 LCR 95-23 s
I '. DescriDtion of Chance
, The proposed change to the Emergency Diesel Generator (EDG) surveillance requirements would ensure consistency between the required testing methodology and the current licensing
! basis and would prevent unwarranted EDG governor control j adjustments in the unloaded configuration.
i
] Hope Creek Technical Specifications (TSs) 4.8.1.1.2.a.4, a 4.8.1.1.2.h.5, 4.8.1.1.2.k.1 and 4.8.1.1.2.k.2 would be j revised to replace the reference to a voltage and frequency band for the 10 second starting time test with a minimum required voltage and frequency that must be attained within j 10 seconds.
The change proposes the following:
- 1) For each of the referenced specifications, 4160 1 420
- volts is deleted and replaced with 2 3950 volts.
3 l For each of the referenced specifications, 60 i 1.2 Hz is j deleted and replaced with 2 58.8 Hz.
l For each of the referenced specifications " generator voltage l and frequency shall be" is replaced with " generator voltage i' and frequency shall attain".
- 2) Since it remains desirable to ensure control stability l
l' during steady state test conditions and since the specified voltage and frequency bands are to be deleted by the above
! change, it is also proposed that the phrase "within these
! limits" be replaced with "at 4160 1 420 volts and 60 i 1.2 Hz." for specifications 4.8.1.1.2.h.5 and 4.8.1.1.2.k.1.
i For specification 4.8.1.1.2.k.2 (two places), the phrase 4
"the steady state generator voltages and frequencies shall be maintained at 4160 1 420 volts and 60 i 1.2 Hz" is inserted after the existing phrase "...at least five
- minutes" for consistency with other specifications
, pertaining to unloaded starts.
The word attain will replace achieve to be consistent with
! the statement in the UFSAR, section 8.3.1.1.3.10.
II. Reason for the ProDosed Chance
- Until recently, EDG start time requirements were believed to be satisfied by meeting the lower end of the specified voltage and frequency band. This was considered to be in compliance with the surveillance requirements. As a result l of a recent reassessment of procedure adequacy by the Hope i
4 LR-N95173 LCR 95-23 Creek plant staff, the monthly surveillance test procedures
- were revised to require the voltage and frequency to be stabilized in the stated band within 10 seconds. In some i instances, to satisfy this newly identified criteria for I timing, it has been necessary to make minor adjustments to
! the diesel governor. This measure does not optimize diesel i generator performance since the unloaded stabilization is not necessarily representative of the emergency 4 configuration (i.e, loading upon reaching established voltage and frequency values).
The proposed change ensures the testing methodology aligns with the licensing basis in order to prevent unwarranted EDG
, governor control adjustments in the unloaded configuration.
This change will eliminate timing to a voltage and frequency band for those surveillance requirements that time the diesel generator start in an unloaded configuration. This will permit consistent, trendable timing results and will j eliminate making unnecessary adjustments to the governor between the 18 month loaded tests. The 18 month loaded
- surveillance tests, representative of the emergency configuration, will continue to require timing to the specified voltage and frequency band.
- III. Justification for the Proposed Chance The intent of the surveillance requirements which start-time
- the diesel generators in an unloaded configuration is to
, ensure they can attain rated frequency and voltage and be
. able to accept load within 10 seconds. The proposed change is consistent with this intent.
Current settings for speed and voltage interlocks on the diesel generator closure correspond to a frequency of 57 Hz i and a voltage of 3950 volts. At these values, coincident with an undervoltage condition on the respective 4160 volt bus, the diesel generator breaker would close and assume
! loading. The value for frequency selected for this LCR l provides conservatism. Both frequency and voltage values are within the existing bands in the specifications.
The proposed chenge aligns the testing methodology with the licensing basis in order to prevent unwarranted EDG control adjustments in the unloaded configuration. This is confirmed by review of the licensing basis documents outlined below.
UFSAR Section 8.3.1.1.3.10 specifies that "The diesel generators are designed to start and attain rated voltage and frequency within 10 seconds of the receipt of the start signal".
LR-N9517,3 LCR 95-23 UFSAR Table 8.3-1 specifies that " loads are assumed to start and run after 13 seconds".
UFSAR Table 6.3-1 specifies "approximately 15 seconds all SDGs are ready to load".
In UFSAR Section 1.8 it is stated that the diesel generators meet the intent of Regulatory Guide 1.108, Revision 1 with some exceptions. None of the exceptions stated relate to timing for voltage and frequency. Regulatory Guide 1.108,
- Revision 1 contains no requirement to wait until the voltage and frequency stabilize when timing the diesel generator start.
t In this same section it is stated that Regulatory Guide 1.9 is not applicable, per its implementation section, but that "HCGS complies with IEEE 387-1977 as endorsed and modified i by Regulatory Guide 1.9...".
IEEE 387-1977 section 6.4, Site Test Categories, discusses a i
" starting test" that " demonstrates the capability to attain and stabilize frequency and voltage within the acceptable limits and time". Section 6.6, Periodic Testing, specifies two typt.s of tests: an " availability test" and an "operat.lonal test". The " availability test", which
- corresponds to our monthly surveillance tests, is intended )
i to " demonstrate its continued availability". This test -
starts the diesel generator, but has no requirement for
. timing, (i.e. it does not include the " starting test"). The i
" operational test" does include a " starting test" but this j test is in the context of the 18 month or refueling outage
- loaded tests to " demonstrate continued capability of
[ performing its required function".
l PSE&G also finds that the Surveillance Requirements align
- with IEEE 387-1977 in that the 18 month surveillances l l simulate a full range of scenarios comparable to that i i expected during accident conditions in order to demonstrate I full capability to perform as assumed in the accident 4
analysis (operational test) while the unloaded start tests demonstrate availability.
1
- This proposed change ensures surveillance requirements 1 4.8.1.1.2.a.4, 4.8.1.1.2.h.5, 4.8.1.1.2.k.1 and l 4.8.1.1.2.k.2 reflect the design basis, and provide for I correct, consistent timing methodology. I IV. Significant Hasards Consideration Public' Service Electric & Gas has, pursuant to 10CFR50.92, I reviewed the proposed changes to determine whether this l change involves a significant hazards consideration. PSE&G )
i 1
l 1
LR ,N9517,3 LCR 95-23 l has determined that operation of Hope creek in accordance l
with the proposed change: l
- 1. Will not involve a significant increase in the probability or consequences of an accident or malfunction of equipment important to safety previously evaluated.
Since no change is being made to the offsite power supplies, or to any system or component that interfaces with the offsite' power supplies, there is no change in the probability of a Loss of Offsite Power Accident.
! Since the proposed change still ensures the surveillance i requirements meet the licensing basis and since the full '
spectrum of loading, unloading and standby testing performed l at the 18 month frequency continues to demonstrate the i capability of the diesel generators to satisfy onsite power j requirements during simulated accident conditions while the monthly testing demonstrates availability, there is no j change in the consequences of an accident.
Since the proposed change will eliminate unnecessary adjustments to the governor controls, the probability of malfunction is potentially reduced. l l
This change ensures the surveillance requirements reflect ;
i the design basis and provide a basis for consistent timing !
methodology. Since the proposed change is consistent with l the intent of the existing specifications, and with the ;
i design basis of the system and since no physical changes are being proposed, no action will occur that will increase the probability or consequences of an accident or malfunction of equipment important to safety. The Diesel Generators will continue to function as stated in the UFSAR.
I
- Therefore the proposed change will not involve a significant 1 increase in the probability or consequences of an accident j or malfunction of equipment important to safety previously evaluated.
- 2. Will not create the possibility of a new or different kind 4
of accident from any previously evaluated.
- The proposed change'does not result in any design or physical configuration changes to the offsite power supplies i or to the diesel generators. Operation in accordance with I the pr'oposed change will not impair the diesel generators ability to perform as provided in the design basis. By eliminating unnecessary adjustments to the diesel generator governor control, performance during any accident is 4
4
LR ,N95173 LCR 95-23 potentially enhanced. The diesel generators will continue to function as stated in the UFSAR. Therefore, the proposed change will not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Will not involve a significant reduction in a margin of safety.
Since the proposed change does not involve the addition or modification of plant equipment, is consistent with the intent of the existing Technical Specifications, meets the intent of applicable Regulatory Guides, and is consistent with the design basis of the Diesel Generators and the UFSAR, no action will occur that will involve a significant reduction in a margin of safety.
- 4. Conclusion Based upon the above, PSEEG has determined that the proposed change to the Technical specifications Bases does not involve a Significant Hazards Consideration.
f
1 l
LR-N9517,3 LCR 95-23 4
l
^
1 n
ATTACHMENT 2 I l
INSERTS AND NARKED-UP PAGE8 l' TECHNICAL 8PECIFICATIONS CHANGE HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NO. NPF-57 DOCKET No. 50-354 3
l i
f a
6
.m.