t Dacument Centrol D0ck LR-N97466 LCR H97-02 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 DOCKET NO. 50-354 REVISIONS TO THE TECHNICAL 8PECIFICATIONS (TS)
-TECHNICAL SPECIFICATION PAGE WITH REVISED PROPOSED CHANGES On May 19, 1997, via letter LR-N97261, Public Service = Electric &
Gas (PSE&G) Company transmitted License Change Request (LCR) H97-02 to the NRC to request a revision to the Technical
-Specifications (TS) for the Hope-Creek Generating Station.
.On e of the marked-up TS pages for.a proposed TS change contained in
'that submittal is being revised as indicated in this attachment.
Specifically, the proposed TS Action Statement.for LCO 3.7.1.3 is being_ revised to indicate that no SACS loads are being cross-connected above 85'F unless they are automatically isolated in a LOP and/or LOCA event.- This was the original intent of the submittal and is' consistent with'the engineering evaluations of UHS performance in these scenarios supporting the justification
- for the changes proposed in LCR H97-02.
Therefore, PSE&G believes that this revision has no. impact on-the conclusions reached in the No Significant Hazards Consideration analysis submitted with LCR H97-02.
As indicated below, the following proposed Technical Specifications for Facility Operating License No. NPF-57 (as contained in LCR H97-02) are being revised by this change-request:
Technical Specification Page 3.7.1.3 3/4 7-5 EckTooNc Es$$e4 P__________
PDR __% _
t PLANT sytTEMI ULTIKAft MrAT $2NK LIMITING CONDITION TOR OPERATION
.......d...s...........................................................se.g....
3.7.1.3 The ultimate heat sink (Delaware River) shall be OPERABLE withs A minimum river water i vel at or above elevation ^ h'O a.
an sea Level, Usos datum ( fo'o SEsc datum), and
(
An average river water temperature of less than or equal to std l b.
APPLICABILITY: OPERATIONAL COFDITIONS 1, 2, 3, 4, 5 and *.
ACTION:
AW
/eJ )(ft T TO W
@ *T Mb With ;he elm -et e r tesi,..iv.. 17. eae.e el 00.0^F, but as or puluw i v. v ' r, "yl cent,4. :d -pl+ t ep+ceti+n le p-itted !"
- Mr.. y.v.ided ih:t b;th leep. er SAC &f44W4-er, yop444;d te p me. int p.
etherwl a Mtir Tne requarwwwns. o f d,.
~
d : c; eie etfi r s L iv n' h i..si.iivda a.
In CPERATIONAL CONDITIONS 1, 2 er 3, be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
In OPERATICHAL CONDITIONS 4 or 5, declare the SACS system and the station service water system inoperable and take the ACTION s
required by specification 3.7.1.1 and 3.7.1.2.
c.
In operational Condition *, declare the plant service water system inoperable and take the ACT!0H required by specification 3.7.1.2.
The provisions of specification 3.0.3 are not applicable.
SURVE!LLANCE REQUIREMENTS 4.7.1.3 The ultimate heat sinh shall be determined OPERABLE:
a.
By verifying the river water level to be greater than or equal to the minimum limit at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b.
By verifying river water toeperature to be within its limitt 1) at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the river water temperature is leen than or equal to M.
l4",.
- '*g z o ?
'2) at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> when the river water temperat.ure is greater than es"F. " '
+
B'2.
F
- When handling irradiated fuel in the secondary containment.
HOPE CREEK 3/4 7-5 Amendment No. 68
_=
=
_-____-_._.____-.____m.
1 D;;ument c:ntrol D:ck LR-N97466 LCR H97-02
$NSERk' FOR PREVIOUS PAGE With the river water temperature in excess of 85.0'F, continued plant operation is permitted provided that all of the following conditions are satisfied:
ultimate heat sink temperature is below 87'F, both emergency overboard discharge valves are open and emergency discharge pathways are available, all SSWS pumps are OFERABLE, all SACS purnps are OPERABLE, all EDGs are OPERABLE and the SACS loops have no cross-connected loads (unless they are automatically isolated during a LOP and/or LOCA); otherwise, with the requirements of the above specification not satisfied s
no