MONTHYEARML20217E0451999-09-30030 September 1999 Proposed Tech Specs Supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10 ML20211F9511999-08-26026 August 1999 Proposed Tech Specs Pages,Raising Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML20196E6541999-06-21021 June 1999 Proposed Tech Specs Pages for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20195B5531999-05-24024 May 1999 Proposed Tech Specs Correcting Typos & Editorial Errors. Corrections Are Considered to Be Administrative in Nature ML20196L1231999-05-17017 May 1999 Proposed Tech Specs Pages,Revising TS to Include Oscillation Power Range Monitor (OPRM) Sys ML20206G2111999-04-30030 April 1999 Proposed Tech Specs,Incorporating Programmatic Controls in Tech Specs for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML20205E8101999-03-29029 March 1999 Proposed Tech Specs Incorporating Programmatic Controls for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20204J2871999-03-22022 March 1999 Proposed Tech Specs Bases Page B 3/4 8-1d,correcting Editorial Errors ML20204J1291999-03-22022 March 1999 Proposed Tech Specs Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML20202B6171999-01-19019 January 1999 Revised TS Bases 3/4.6.1.1,revised to Clarify When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML20198T0281998-12-30030 December 1998 Proposed Tech Specs Re Changes to Flood Protection TS LCO & Associated Action Statements ML20198N3981998-12-28028 December 1998 Proposed Tech Specs Permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys ML20198C9641998-12-16016 December 1998 Proposed Tech Specs Pages,Replacing Accelerated Testing Requirements of TS Table 4.8.1.1.2-1 with EDG Performance Monitoring & Deleting TS 4.8.1.1.3 Requirement to Submit 30- Day Special Rept for Diesel Failures ML20155D3591998-10-22022 October 1998 Proposed Tech Specs Page for Amend to License NPF-57, Establishing More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5871998-10-19019 October 1998 Proposed Tech Specs Section 3.0.4,eliminating Restrictions for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML20154L5021998-10-0808 October 1998 Revised Tech Spec Page,Which Corrects Editorial Errors ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML20151X7321998-09-0808 September 1998 Proposed Tech Specs Permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4331998-08-25025 August 1998 Proposed Tech Specs,Implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML20236F1171998-06-25025 June 1998 Proposed Tech Specs Deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20249A8181998-06-12012 June 1998 Proposed Tech Specs Re Increased Operational Flexibility During Periods of Elevated River Water Temp & Maintain Ultimate Heat Sink Operation within Design ML20247K7381998-05-13013 May 1998 Proposed Tech Specs Page Re Change to Inservice Leak & Hydrostatic Testing Requirements ML20217P9351998-04-28028 April 1998 Proposed Tech Specs Section 3/4.4.2,implementing More Appropriate SRV Setpoint Tolerances ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML20216F4541998-03-0606 March 1998 Proposed TS Section 4.2.2 Re Terrestrial Ecology Monitoring ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation 1999-09-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217E0451999-09-30030 September 1999 Proposed Tech Specs Supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10 ML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20216E6201999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 14 to Table of Contents & Rev 10 to Attachments 6,7 & 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML20211F9511999-08-26026 August 1999 Proposed Tech Specs Pages,Raising Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML20196E6541999-06-21021 June 1999 Proposed Tech Specs Pages for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20195B5531999-05-24024 May 1999 Proposed Tech Specs Correcting Typos & Editorial Errors. Corrections Are Considered to Be Administrative in Nature ML20196L1231999-05-17017 May 1999 Proposed Tech Specs Pages,Revising TS to Include Oscillation Power Range Monitor (OPRM) Sys ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML20206T8941999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 12 to Table of Contents,Rev 8 to Attachment 8,Rev 8 to Attachment 7 & Rev 8 to Attachment 9 ML20206G2111999-04-30030 April 1999 Proposed Tech Specs,Incorporating Programmatic Controls in Tech Specs for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML20206G2281999-03-31031 March 1999 Rev 18 to ODCM for Hope Creek Generating Station ML20205E8101999-03-29029 March 1999 Proposed Tech Specs Incorporating Programmatic Controls for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20204J2871999-03-22022 March 1999 Proposed Tech Specs Bases Page B 3/4 8-1d,correcting Editorial Errors ML20204J1291999-03-22022 March 1999 Proposed Tech Specs Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML20202B6171999-01-19019 January 1999 Revised TS Bases 3/4.6.1.1,revised to Clarify When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML20198T0281998-12-30030 December 1998 Proposed Tech Specs Re Changes to Flood Protection TS LCO & Associated Action Statements ML20198N3981998-12-28028 December 1998 Proposed Tech Specs Permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys ML20198C9641998-12-16016 December 1998 Proposed Tech Specs Pages,Replacing Accelerated Testing Requirements of TS Table 4.8.1.1.2-1 with EDG Performance Monitoring & Deleting TS 4.8.1.1.3 Requirement to Submit 30- Day Special Rept for Diesel Failures ML20155D3591998-10-22022 October 1998 Proposed Tech Specs Page for Amend to License NPF-57, Establishing More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5871998-10-19019 October 1998 Proposed Tech Specs Section 3.0.4,eliminating Restrictions for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML20154L5021998-10-0808 October 1998 Revised Tech Spec Page,Which Corrects Editorial Errors ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML20151X7321998-09-0808 September 1998 Proposed Tech Specs Permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4331998-08-25025 August 1998 Proposed Tech Specs,Implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML20236F1171998-06-25025 June 1998 Proposed Tech Specs Deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements 1999-09-30
[Table view] |
Text
TRe Manpger~ - Station Quality Assurance report to the Director QA and NSR, as-sho\m on Figure 17.2 1. Their responsibilities include implementation of the inspection assessment and monitoring program for activities conducted at the plant, ~~~~~~, surve~llance o~ site contractor activities, anct~approvaf~oI~p!ant~quaIT'ty~related implementing procedures.
Responsibilities of the Manager Offsite Safety Review and the Onsite Safety Review Engineer are described in Seetion 13.1.
17.2.1.1.1.1 Quality Assurance Personnel Qualifications The Director - QA and NSR and the QA managers reporting directly to him must each have a combination of 6 years of experience in the field of QA and operations. At least 1 of these 6 years of experience must be in the overall implementation of a nuclear power plant QA program. A minimum of 1 year and a maximum of 4 of the 6 years of experience may be fulfilled by related technical or academic training. Personnel performing inspections, examinations, and test activities (i.e., to verify conformance) are certified as Level I, Level II, Level III as appropriate to their responsibilities, also in accordance with Regulatory Guide 1. 58. Pers*onnel performing quality assurance audits are certified as auditors or lead auditors as appropriate to their responsibilities in accordance with Regulatory Guide 1.146.
~
The Director - QA and NSR fulfills the above qualifications with the addition of the following:
- 1. Knowledge and experience in quality assurance~~*
- 2. High level of leadership, with the ability to command the respect and cooperation of company personnel, suppliers, and construction forces.
- 3. Initiative and judgment to establish related policies to attain high achievements and economy of operations.
17.2.1.1.2 Operational Review (later) 17.2-6 SGS-UFSAR Revision 14 December 29, 1995
~~~,,~~,,~
~
~
~~~~IF~~
JWI~
~~~~~,14JYl'A§S
~~~~
~
~
~~
~~~~~~~~~
~~~
~~~~~~~~~
~~A'l'~~~~,11'~~~~~~
~~~~~
~
~~,.,~~~~~~
~
17.2.1.2 Research and Testing Laboratory The General Manager Research and Testing Laboratory reports to the Vice-President Transmission Systems.
The Research and Testing Laboratory performs calibrations, analyses, and evaluations on systems, equipment, and materials, as requested by PSE&G departments, and maintains compliance with its quality assurance program.
17.2-7 SGS-UFSAR Revision 14 December 29, 1995
LR-N961.04 ATTACHMENT 3 HOPE CREEK UFSAR CHANGES
4.. Conqucting QA Program orientation for Nuclear Department personnel, administering the training and certification program for QA personnel involved in inspection assessments and auditing activities, maintaining the QA training plan, and maintaining QA training records.
- 5. Review of new regulatory requirements for QA program impact.
- 6. Development and implementation of a trend analysis program to identify quality problems.
- 7. Coordination of the commitment verification program on a selected basis.
Responsibilities of the Manager - QA Engineering and Procurement include:
- 1. Review of engineering documents such as equipment specifications, weld procedures, etc, for inclusion of QA requirements.
- 2. Review of specifications for inclusion of QA requirements.
- 3. Review of procurement documents for insertion of applicable QA requirements.
- 4. Conduct of supplier surveys, audits, and surveillances.
- 5. Performing supplier evaluation.
- 6. Assessment of fuel procurement and fabrication.
- 7. Performing material evaluation activities on items subject to the QA Program.
The Manager~ Station Quality Assurance reports to the General Manager -
QA/NSR, as shown on Figure 17.2 1. His responsibilities include implementation of the inspection, assessment 17.2-5 HCGS-UFSAR Revision 7 December 29, 1995
and monitori~~~Eiu~2,~~~~f2E activities conducted at the plant, ~
~~~~~' surveillance of site contractor activities, and approval of plant quaiity~related procedures.
Responsibilities of the Manager Offsite Safety Review and the Onsite Safety Review Engineer are described in Section 13.1.
17.2.1.1.1.1 Quality Assurance Personnel Qualifications The General Manager - QA and NSR and the QA managers reporting directly to him must each have a combination of 6 years of experience in the field of QA and operations. At least 1 of these 6 years of experience must be in the overall implementation of a nuclear power plant QA program. A minimum of 1 year and a maximum of 4 of the 6 years of experience may be fulfilled by related technical or academic training. Personnel performing inspections, examinations, and test activities (i.e., to verify conformance) are certified as Level I, Level II, Level III as appropriate to their responsibilities, also in accordance with Regulatory Guide 1.58. Personnel performing quality assurance audits are certified as auditors or lead auditors as appropriate to their responsibilities in accordance with Regulator Guide 1.146.
The General Manager - QA and NSR fulfills the above qualifications with the addition of the following:
- 1. Knowledge and experience in quality assurance~~-
- 2. High level of leadership, with the ability to command the respect and cooperation of company personnel, suppliers, and construction forces.
- 3. Initiative and judgment to establish related policies to attain high achievements and economy of operations.
17.2.1.1.2 Operational Review
~ ar~<<~~~~tems re ate to nuc ear safety. The overall responsibilities of these groups are described in Section~13~4:~* The Manager Station QA is invited to
~~~~~11 ~ORC mee~in~s. and receives the minutes of the meetings. He attends the meetings periodically.
As part of its ~in~ependent revie~ function, the G8R ~ ~s responsible for selected prepl'anned, independent audits of plant operations in accordance with Technical Specification requirements. These audits are generally conducted by QA under G8R ~ cognizance.
(later)
(later) 17.2-6 HCGS-UFSAR Revision 7 December 29, 1995
~
rll~l~~~Aa
~~
~~~~~,.,,.,,~
~~~~
~
~~~~~~,,~~~
- ~*******************************
~
~
~~~~~~~,.,,~
- ~****************************
~~~,Ill'~~~~
~ ~~~
l_
~,,~~~~~~~,,,~
F'~,.,~~~~~~~,.,,~
m *
~~~~~
17.2.1.2 Research and Testing Laboratory The General Manager Research and Testing Laboratory reports to the Vice-President Transmission Systems.
The Research and Testing Laboratory performs calibrations, analyses, and evaluations on systems, equipment, and materials, as requested by PSE&G departments, and maintains compliance with its quality assurance program.
17.2.1.3 Deleted 17.2-7 HCGS-UFSAR Revision