MONTHYEARBW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 ML20217Q1951998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Braidwood Generating Station,Units 1 & 2 ML20202C6431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Braidwood Generating Station,Units 1 & 2 ML20198J7091997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Braidwood Generating Station,Units 1 & 2 ML20202H6231997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Braidwood Generating Station,Units 1 & 2 ML20199D0781997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Braidwood Generating Station,Units 1 & 2 ML20217G1571997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Braidwood Generating Station,Units 1 & 2,covering Period 970901-970930 ML20216C2931997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Braidwood Generating Station,Units 1 & 2 ML20198F0321997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Braidwood Generating Station,Units 1 & 2 ML20140C6271997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Braidwood Generating Station,Units 1 & 2 ML20148B2411997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20137N9971997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20136B4371997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20138J9891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20133E1641996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20132B9511996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20134G8341996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20128K2631996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117K7451996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Braidwood Nuclear Power Station Unit 1 & 2 ML20116M6171996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs Nuclear Power Station,Units 1 & 2 ML20115B0731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Bs ML20117K4761996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117D6991996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20101N8121996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Braidwood Nuclear Power Station,Units 1 & 2 ML20100Q7161996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Braidwood Units 1 & 2 ML20100Q7051996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Braidwood Unit 1 ML20097D4171996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Braidwood Nuclear Power Station ML20100Q7021995-12-31031 December 1995 Revised Monthly Operating Rept for Dec 1995 for Braidwood Unit 1 ML20096E6191995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20095F0481995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Braidwood Nuclear Generating Station ML20094H1031995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Braidwood Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G9961999-10-14014 October 1999 SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A7441999-09-10010 September 1999 Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With ML20210R6421999-08-13013 August 1999 ISI Outage Rept for A2R07 ML20210U8111999-08-0404 August 1999 SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With ML20210K9861999-07-30030 July 1999 Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20216D3841999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function1999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20196A0721999-03-16016 March 1999 Cycle 8 COLR in ITS Format & W(Z) Function ML20207J4371999-03-0808 March 1999 ISI Outage Rept for A1R07 ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With ML20206U9011999-02-15015 February 1999 COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not Included BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20206U9081998-12-17017 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155B6711998-10-26026 October 1998 Safety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program Plan ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154D4401998-10-0202 October 1998 Safety Evaluation Authorizing Second 10-yr Interval ISI Program Request for Relief 12R-30 for Plant,Units 1 & 2 ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20195F5911998-09-11011 September 1998 Special Rept:On 980812,addl Unseated Wires Were Discovered. Cause Is Unknown at Present Time.Util Evaluated Number of Unseated/Ineffective Wires & Determined Effect on Containment Structural Integrity.Commitments,Encl ML20196B3711998-09-0808 September 1998 Cycle 8 Operating Limits Rept (Olr) ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20238F3281998-08-31031 August 1998 SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2 ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20198A0151998-06-18018 June 1998 10CFR50.59 Summary Rept 960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & FP Rept.Without Fp,Rept ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247F7711998-05-0808 May 1998 Special Rept:On 980403 & 980503 Seismic Monitoring Sys Was Declared Inoperable.Caused by 5-volt Power Supply & Regulator Card Failure.Imd & Sys Engineering Are Continuing to Identify & Resolve Problems So Sys Can Be Operable ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20217K6331998-04-20020 April 1998 Safety Evaluation Accepting Methodology & Criteria Used in Generating Flaw Evaluation Charts for RPV of Braidwood IAW Section XI of ASME Code ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 1999-09-30
[Table view] |
Text
/ C:mm:nw: lth Edis:n
, , /' :n Bf oldwood Nuclear Power Station g . _ _ , Route #1. Dox B4
> Braceville, filinois 60407
(
y Telephono 815/458 280t June 10, 1992
- BH/92-0313 Director, Office of Resource Management United States Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Document Control Dest Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Power Station for the period May 1 through May 31, 1992.
bit < t K. L. Kofror Station Manager Braidwood N;lclear Station KLK/JL/dla (574/ZDB5G)
Attachments cc: A. B. Davis, NRC, Region III NRC Resident Inspector Braidwood Ill. Dept. of Nuclear Safety H. J. Hallace E. D. Eenigenburg T. J. Kovach Nuclear Fuel Services, PHR Plant Support INP0 Records Center Performance Monitoring Group, Tech Staff Braidwood Station Nuclear Group, Tech Staff Braidwood Station
! R. Pulsifer - USNRC l T. H. Simpkin D. R. Eggett - Nuclear Engineering Department l
l 1
4 (*. e s a 1,
' 9206150436 920531 PDR ADOCK 05000456 R PDR I
e I
BRAIDWOOD NUCLEAR POWER STATION ,
UNIT I AND UNIT 2 ,
HONTHLY PERFORMANCE REPORT COMMONHEALTH EDISON COMPANY ,
NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 f
6 l
L l
p
. _ - - . ._ _ . . _ . _ _ _ . ___ ._.--~1.._. _ . _ _ . - . . _ . _ _ _ - . _ , , _ . . _ . . - . _ . . _ . - - - . . - . - _ _ - . - . . _ , . - - . . _
,1. Monthly Report for Braidwood Unit 1 A. SumarLof_Oper.allDS IUCLltate Braldwood Unit 1 entered the month of May, 1992 at approximately 99.5% power. The unit operated routinely with no significant power reductions through the end of the month.
T l'
l' l- (574ZD85G)3 4
e -
._._.-__.._.x__. _ _ _ - . _ .. _ . .. _ _ _ , _ . _ .
_ __ _= _ _ _ _ _ _ _ _ . . . _ . _ - _ _ _ _ _ . - _ _ . - _ _ _ . _ _ _
i 8 .
B.
Ol'ERAIING..DAIA EEEORI DOCKEi NO : 50-456 UNIT: Braidwood 1 DATE: 06/10/92 COMPILED BY: C. E. Pershey TELEPHONE: (815)458-2801 ext. 2173 OPERATING STATUS
- 1. Reporting Period: May, 1992 Gross Hours: 744
- 2. Currently Authorized Power Level (MHt): 3411 Design Electrical Rating (MHe-gross): 1175 Design Electrical Rating (MHe-net): 1120 Max Dependable Capacity (MHe-gross): 1175 Max Dependable Capacity (MHe-net): 1120
- 3. Power level to which restricted (If Any): None l
- 4. Reasons for restriction (If Any): None ,
I IBIS.JiONIE YR To DAIE CutlVLARYF_
- 5. Report period Hours: 74LD 3641.0 33656a
- 6. Hours Reactor Critical: 74410 35BL1 2586h9 7 RX Reserve Shutdown Hours: 00 1 0J OJ
- 8. Hours Generator on Line: 744.0 3562,5 2539.415
- 9. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 10. Gross Thermal Energy (MHH): _2490903_ 11120554 _25105020_
- 11. Gross Elec. Energy-(MHH): _B104S L _3.98542 L 16307617
- 12. Het Elec. Energy (MHH): ._B08165_ _3335112_ _251310fi6_
- 13. Reactor Service factor: 100J 98J 76 B t
- 14. Reactor Availability Factor: 100.0 9L2 _25.8
- 15. Unit Service eactor: IQQ&Q 97.7 7515
-16. Unit Availability Factor: 1.00J 9L2 752 5
- 17. Unit Capacity factor (MDC net): 97t 0 9319 6412
- 18. Unit. Capacity Factor (DER net): 9120 93.9 66.1
- 19. Unit Forced Outage Rate: Q10 2J 11.3
- 20. Unit _ Forced' Outage Hours: OJ - 83 .5 323L3
- 21. Shutdowns Scheduled Over Next 6 Months: Refueling Outage - Sertcmber, 1992
- 22. If Shutdown at End of Report Period, 4 Estimated Date of Startup: ,
T (574ZD85G)4
.2._. 2-... .._. _ _-_ _ _ - _ .. _ _ , _ . _ . . - _._ _ _ _ , ._. -
C.
~
AVIRAGEDAI LLJ)MLLN EL10H ER_LEVILLOG DOCKET NO.: 50-456 UNIT: Braidwood 1 DATE: 06/10/92 COMPILED BY: C. E. Pershey TELEPHONE: (815)458-2801 ext. 2173 HONTH: May, 1992
- 1. 3 01.0 17. 1010
- 2. _ LLO3 _ ___. _ _. 18. 1093
- 3. IM1 19. _1062
- 4. .LLO7 _ 20. _. _ _ LOO 4 _..
- 5. 1106 21. 1046 _
- 6. J105 _. 22. 1D9.8
- 7. 1 LOO 23, 1092
- 8. 10_6E _ _ _ 24. ___ 1109
- 9. 1Q91 25. _ LL15
- 10. 1015 26. . _ . _ . 1117
- 11. _LQ95 27. 1116
- 12. 1097 28. 1076
- 13. 1099 29. _ 10Bft_
- 14. LL01 30 109_0
- 15. LO18 31. _ 10&9
- 16. _J.Q93 INSTRUCTIONS On this form list the average daily unit power level in MHe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
These figures will be used to plot a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power lovel line). In such cases the average daily unit power output sheet s,. a'.d be footnoted to explain the apparent anomaly.
(574ZD85G)5
L.
D UNIT SHUTDQHMS/ REDUCTIONS' DOCKET NO.: 50 455-
~
i UNII: Braldwood 1
- DATE: 06/10/92 .
F COMPILED BY: C. E. Pershey TELEPHONE: (815)45822801 ext. 2173
. REPORT PERIOD: May,-1992 ij No .DAIE IYfE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT -CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE NONE I
i.
s I
l- o.........**.....
j
SUMMARY
. o.**...*****.....
f TYPE REASON METHOD SYSTEM & COMPONENT u
- F-Forced A-Equipment Failure Maint or Test 1 - Method Exhibit F & H S-Scheduled B-Maint or Test 2 - Manual Scram Instructions for Preparation of C-Refueling 3 - Auto Scram Data Entry Sheet
- D-Regulatory Restriction 4 - Continued Licensee Event Report j E-Operator Training & License Examination 5 - Reduced Load (LER) Flie (NUREG-0161) i F-Administration 9 - Other
- G-Oper Error
- H-Other (574ZD85G)11 1 . . . . -__ _.
,il l ll ' l1' l N _
O I T_
T N_
PE IV RE C
SF EO D
N O
I T
TI ND AN LO PC H
C D
. C s
n EN o PO i
o YI TT t
t A s a &U e S r T g T e OC n N p NA a E o h c
N E e R v d I l e U a t O v 2 a E F r R f ST e e EA n G i VU e e g
N l LT n I e AC o T R VA N e R / e O y s P t n E e e e R f c n a i o N
2 E S L 1 V )
O E G L T 5 E . A D
. 8 D
U 1 2 Z
4 7
. 5 E (
1 ll(lIll l I t I'1f f L
.f . LICENSELIVGLREf0R15 _WilL1 l
The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, May I through May 31, 1992. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73. ,
' Licensee Event Report !
ReporlJiumber__. Date 11tle_oL0ccurrence i
None 1
T P
2 (57dZD85G)6-
__ . _ _ _ _ _ . -._ 2 _ _ . . . _ . _ _ _ _ _ . _ , . _ . _ _ ._.__,___...._._..,___.a,_,_,___.
. - - . - - - - . . . . - . _ . - - .- ~ . _ .- - - - - -. - - - _ - - -
4
- 1. Monthly R6,$ ort for Braidwood Unit 2 A. ' Sunstry_oL0 pent.ing_Lxperlene Braidwood Unit 2 entered the month of May, 1992 at approximately 99.5% power. The unit operated routinely througn May 8, 1992. Load was reduced on May 9 to allow identification of a main condenser tube leak. Load was reduced on May 15 to allow repair of the leak identified on May 9. On May 17 load was further reduced to make a containment entry to find sources of inleakage to the PRT.
The unit was shut down on May 23 to repair a leak identified on May 21. The unit remained shut @ wn th ough the end of the month.
J L
I (5742085G)7
_ a _. , _ _ . . . , _ . - _ - . - . _
- B. ORIRMING_DMA_REEORI DOCKET NO.- 50-457 UNIT: Braidwood 2 l DATE: 06/10/92 COMPILED BY: C. E. Pershey TELEPHONE: (815)458-2801 ext. 2173 OPERATING STATUS
- 1. Reporting Period: May, 1992 Gross Hours: 744
- 2. Currently Authorized Power Level (MHt): 3411 Design Electrical Rating (MHe-gross): 1175 Design Electrical Rating (MHe-net): 1120 Max Dependable Capacity (MHe-gross): 1175 Max Dependable Capacity (MHe-net): 1120
- 3. Power level to which restricted (If Any): None
- 4. Reasons for restriction (If Any): None IHISJiON111 YR_10_DME _CUMULMIVE
- 5. Report period Hours: L4LO 364LO _ 3113B10_
- 6. Hours Reactor Critical: _53A 6 _ _ _3323.9 _ 26090,5..
- 7. RX Reserve Shutdown Hours: .0 0 .040 _ __._0,0_
- 8. Hours Generator on Line: 534d 331110 _.25851 A
- 9. Unit Reserve Shutdown Hours: _ __0 J 010 _____010_
- 10. Gross Thermal Energy (MHH): _1605206_ 1060.90.48_ 15964599 _
- 11. Gross Elec. Energy (MWH): _550565_ _36!i4583 _ 26012023__
- 12. Net Elec. Energy (MHH): _525955_ _35 L4011_ 24875912 _
'1 Reactor Service factor: _ _11,.9 9L1 _ _ __B2,2_
4 Reactor Availability Factor: LL9 Ed 82,L 15, Unit Service Factor: 7LB ._ _ 9018 EL5_
- 16. Unit Availability factor: ___ _7L B 90.8 8L5_
- 17. Unit Capacity Factor (MDC net): __ _13 J 8610 ._ _ 7010_
- 18. Unit Capacity Factor (DER net): 61J 86.0 . _ . . . 7010_
- 19. Unit Forced Outage Rate: 28,2 _ 9,2 4L 1
- 20. Unit Forced Outage Hours: 209m9 _ _ 336.m0 1283,B_
- 21. Shutdowns Scheduled Over Next 6 Months: None
- 22. If Shutdown at End of Report Period, Estimatad Date of Startup:
(5742D85G)8
1
. 1 C. AVERAG LDAI LLilNII_ elf 0HfJLLEVELLOG DOCKET NO.: 50-457 )
UNIT: Braidwood 2 DATE: 06/10/92 COMPILED BY: C. E. Pershey TELEPHONE: (815)458-2801 i ext. 2173 HONTH: Hay, 1992
- 1.
- 2.
- 3. . 1091 19. 603 _
- 4. 1084 20. 1009--
- 5. _._ tLl5 21. 1057
- 6. LQ77 22. 1100
- 7.
~
- 8. 108J 24. -
14
- 9. ,_.1315 25. - 14
- 10. 71 6 _ . . , _ _ . 26. -
Le 11, 1016. 27. - 14
- 12.
14
~ 13.
- 14.
- 15.
15 16, 825 ,
~ INSTRUCTIONS On-this-form list the average daily unit power level in MWe-Net for each day in the reporting month.--Compute to the nearest whole megawatt.
D- -
These. figures will be used to plot'a graph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when tha daily average power level exceeds the 100% 11ne (or the restricted power level;line). In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly. '
' Oue
- to Condenser. Efficiency.
(574ZD85G)9
, - ~ ~ ,.,s,, . , ,, -,. , ,..._,,y, , _ _ , . ,-n,-y_., %.m%,...,,_%, ..,,,gy-.,.,y..,.,w,y ,,_m . . . - .m__,,
DOCKET NO.: 50 457 D. UNIT SHUTDOHNS/ REDUCTIONS UNIT: Sraideood 2 DATE: 06/10/92 COMPILED B'Y: C. E. Pershey TELEPHONE: (815)458-2801 -
ext. 2173 REPORT PERIOD: May, 1992 l _No_ CATE I1EE H3U_R_5 REASON METHOD I,ER NUMBER SYSTEM COMPCNEfiI CAUSE & CORRECTIVE ACTION TO PREVENT RECIMEEE 30 2 8 5 None KE TBG Reduced load to remove a main condenser 5 920509 5 waterbox from service for leak identification.
Testing was successful and the waterbox was restored prior to increasing power.
52.7 8 5 None KE TBG Reduced load to remove a main condenser 6 920515 5 waterbox from service to repair the leak identified on 920509. One tube was plugged a.J the waterbox was restored.
None AB RV Reduced load folicwing the 920515 repairs, 7 920517 $ 16.0 B 5 to make a containment entry. The containment entry was made to identify the source of l inleakage to the PRT. The sour e was not l positively identified at this time. l None AB RV Manual shutdown to repair a pressurizer safety 8 920523 S 186.7 8 1 valve leak identified by testing done on 920521. Repairs were made prior to unit restart.
a 92-004 RD EI On restart from 920523 shutdown, the B M-C set 9 920531 F 23.2 A tripped on overexcitation. The A M-G set tripped due to a low setting on the bue over-voltage relay. The settings were corrected and testing was completed prior to unit restart.
SUMMARY
MEJIEOD SYSTEM _LCCMEONENT TYPE REASON _
A-Equipment Failure Maint or Test 1 - Method Exhibit F & H F-Forced Instructions for Preparatica of S-Scheduled B-Maint or Test 2 - Manual Scram 3 - Auto Scram Data Entry Sheet C-Refueling Licensee Event Report D-Regulatory Restriction 4 - Continued E-Operator Training & License Examination 5 - Reduced Load (LER) Flie (NUREG-0161)
F-Administration 9 - Other G-Oper Error H-Other (5742085G)13
.. 'E.. lEIRJE REPORTING- REOUIREMENTS -. UNIT 2 - ,
3.
- 1. . Safety /Reliefjvalve operations. .
ic VALVES' MO & TYPE PLANT DESCRIPTION
- DAIE . ACTUATED ACTUATION' CONDITION OF EVENT
.None l
l i
4 l 2. Licensee generated changes to ODCM.
i None i
l i
l
't i
1 i
1 h
I i
i I
4 3
(574ZD85G)14
. . ~ . . . . . -
.. _. . . _ . ~ . _ _ _ _ . . . , _ . _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ ._
4 F. LICEllSELEVEtillEPDRIS _U41L2 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, May 1 through May 31, 1992. This information is provided pursuant to the reportable occurrence /eporting requirements as set forth in 10 CFR 50.73.
Licensee Event Report Repor LNumbet_ Date litle_oL0ccur_rence None (574Z085G)l0