, Osmmonwealth filiv>n Q>r.*pany liraidwood Generating Station
+
e Route a1,Ilox 81 litacc5 ille. IL 6040'%!9 Tri Hl5-4W2H01 July 1,19')6 BW/96-0069 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Monthly Operating Report for June,1996 Braidwood Nuclear Power Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Ladies and Gentlemen:
In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Nuclear Power Station, Units I and 2, covering the period June 1,1996 through June 30,1996.
Please address any comments or questions regarding this matter to Chris Pershey at (815) 458-2801, extension 2173.
Very truly yours, h]/
A
.. Tulon 5tation Manager Braidwood Nuclear Station TJT/CP/md O.CORRESP2CSTECitBN96 0069 j
Enclosures cc:
H. J. Miller, Regional Administrator - Rill R. R. Assa, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident Inspector - Braidwood J. L. Roman, IDNS Resident inspector - Braidwood Office of Nuclear Facility Safety - IDNS 9607090222 960630 PDR ADOCK 05000456-
/
)
R PDR
\\
\\
A 1Jnicum Q mpany
t BRAIDWOOD NUCLEAR POWER STATION UNIT I AND UNIT 2 I
MONTHLY PERFORMANCE REPORT Comed 1
NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 1
i l
1
A. OPERATINu DATA REPORT Docket No: 50 - 456 Unit: Braidwood 1 Date: 07/01/1996 Completed by: Chris Pershey Telephone: 815-458-2801 i
OPERATING STATUS k
- 1) Reporting Period: June 1996 Gross Hours:
720
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120
- 3) Powerlevel to which restricted (If Any):
None
- 4) Reasons for restrictions (If Any):
None i
I Ibis Mo.
Yr to Date Cumulative i
- 5) Report Period Hours:
720 4367 69440
- 6) Hours Reactor Critical:
720.0 3,923.1 54,901.0
- 7) RX Reserve Shutdown Hours:
0.0 0.0 0.0
- 8) Hours Generator on Line:
720.0 3,915.5 54,096.2
- 9) Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10 Gross Thermal Energy (MWHt):
2,307,030 12,799,647 173,591,493 11 Gross Elect. Energy (MWH):
789,749 4,440,194 57,830,514 12 Net Elect. Ener0y (MWH):
759,314 4,274,732 55,402,092 13 Reactor Service Factor:
100.0 89.8 79.1 14 Reactor Availability Factor:
100.0 89.8 79.1 a
15 Unit Service Factor:
100.0 89.7 77.9 16 Unit Availability Factor:
100.0 89.7 77.9 17 Unit Capacity Factor (MDC NET):
94.2 87.4 71.2 18 Unit Capacity Factor (DER NET):
94.2 87.4 71.2 i
19 Unit Forced Outage Rate:
0.0 10.3 7.9 20 Unit Forced Outage Hours:
0.0 451.5 4,666.0 21 Shutdown Schedule Over Next 6 Months: Mid-cycle outage - 10/01/1996 22 If Shutdown at End of Reporting Period, Estimated Date of Startup:
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood 1 Date: 07/01/1996 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: June 1996 Qay MWe-net Ray MWe-net 1) 1131
- 16) 1113 2) 1131
- 17) 1115 37 1130
- 18) 1118 4) 1131
- 19) 1122
- 5) 1131
- 20) 1118 6) 1120
- 21) 889 7) 1128
- 22) 654 8) 1132
- 23) 661 9) 1133
- 24) 681 10) 1133
- 25) 731 11) 1131
- 26) 1050 12) 1125
- 27) 1118 13) 1119 28) 1113 14) 1115 29) 1113 15) 1113 30) 1114
- Due to condenser efficiency
.. ~
G.
UNIT SHUTDOWNS / REDUCTIONS Docket No.:
50-456 Unit:
Braidwood 1 Date: 07/01/96 Completed by:
Chris Pershey Telephone:
815-458-2801 REPORT PERIOD:
June 1996 LER Cause & Corrective Action No Date Type Hours Reason Me;thod Number System Component to Prevent Recurrence 2
3 960621 F
114.8 A
5 N/A SD P
Reduced load to shut down a Condensate Booster pump in response to an elevated inboard bearing temperature. A standby pump was unavailable. Repairs are in progress including a new bearing to restore materiel condition. The unit ramped to full power when the standby pump became available.
SUMMARY
Unit i entered the month of June 1996 with 100% capability and operated routinely until June 21st. The unit was forced to reduce load June 21st when a Condensate Booster pump was shutdown due to an overheating inboard bearing with no standby pump available.100% capability was restored June 26,1996 and continued through the remainder of the month.
TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H - Other
D.
SAFETY / RELIEF VALVE OPERATIONS Docket No.:
50 - 456.
- Unit:
Braidwood 1 Date: 07/01/96 Completed by:
John Lewis Telephone:
815-458-2801-Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None l
,4
.m~
.. r-e 3
a,_,.
ms,.,,
...~ -.4
... -. - c.-.-
o A. OPERATING DATA REPORT' Docket No: 50 - 457 Unit: Braidwood 2 Date: 07/01/1996 Completed by: Chris Pershey i
Telephone: 815-458-2801 OPERATING STATUS
~
- 1) ReportinD Period: June 1996 Gross Hours:
720
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175
}
Max Dependable Capacity (MWe-net):
1120
- 3) Power level to which restricted (If Any):
None
- 4) Reasons for restrictions (if Any):
None i
This Mo.
Yr to Date Cumulative
- 5) Report Period Hours:
720 4367 67522
- 6) Hours Reactor Critical:
720.0 2,950.7 56,372.1
- 7) RX Reserve Shutdown Hours:
0.0 0.0 0.0 a -
- 8) Hours Generator on Une:
720.0 2,933.0 55,959.1
- 9) Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10 Gross Thermal Energy (MWHt):
2,440,428 9,422,572 180,204,841 11 Gross Elect. Energy (MWH):
827,300 3,227,122 59,132,909 12 Net Elect. Energy (MWH):
793,628 3,085,539 56,721,307 13 Reactor Service Factor:
100.0 67.6 83.5 14 Reactor Availability Factor:
100.0 67.6 83.5 15 Unit Service Factor:
100.0 67.2 82.9 16 Unit Availability Factor:
100.0 67.2 82.9 17 Unit Capacity Factor (MDC NET):
98.8 63.1 75.0 18 Unit Capacity Factor (DER NET):
98.8 63.1 75.0 19 Unit Forced Outage Rate:
0.0 0.0 5.0 20 Unit Forced Outage Hours:
0.0 0.0 2,947.6 21 Shutdown Schedule Over Next 6 Months:
22 If Shutdown at end of Reporting Period, Estimated Date of Startup:
i
[
I E
7 i
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457 Unit: Braidwood 2 Date: 07/01/1996 l
Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: June 1996 Qay MWe-net Qay MWe-net I
1) 1125
- 16) 1104 2)'
1124
- 17) 1103 3) 1122
- 18) 1103 4) 1123
- 19) 1106 5) 1124
- 20) 1103 6) 1123
- 21) 1097 7) 1121
- 22) 1098 8) 1122
- 23) 1104 9) 1013 24) 1095 10) 1122
- 25) 1108 11) 1121
- 26) 1111 12) 1098 27) 1108 13) 1116 28) 1104 14) 1112 29) 1104 15) 1061 30) 1105
- Due to condenser efficiency
[
o C.
UNIT SHUTDOWNS / REDUCTIONS Docket No.:
50-457 Unit:
Braidwood 2 Date: 07/03/96 Completed by:
Chris Pershey REPORT PERIOD:
June 1996 Telephone:
815-458-2801 LER N9L Date Type Hours Reason Method Number System Component to Prevent Recurrence Cause & Corrective Action None
SUMMARY
Unit 2 entered the month of June 1996 at 100% capability and operated routinely the entire month.
TYPE REASON F - Forced METHOD A - Equipment Failure Maint or Test SYSTEM & COMPONENT 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram C - Refueling Exhibit F & Instructions for 3 - Auto Scram i
D - Regulatory Restriction Preparation of Data Entry Sheet 4 - Continued i
E - Operator Training & Licensee Examination Licensee Event Report (LER) File 5 - Reduced Load F - Administration (NUREG-0161).
G - Operator Error H - Other i
i i
__,.m
.. ~. -
~
e 46 D.
SAFETY / RELIEF VALVE OPERATIONS Docket No.:
50 - 457 Unit:
Braidwood 2 Date: 07/01/96 Completed by:
John Lewis Telephone:
815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None t
-