Onnmonw c:lth lihvin Company Ilraidwtul Generating MAtion Route #1, Dox M4 L
- r liracciille. IL 60 to79Xil9 Tel HI54M4 2Hni February 2,1998 BW/98-0006 United States Nuclear Regulatory Commission Attention:- Document Control Desk Washington, D.C. 2055-0001
Subject:
Monthly Operating Report for January,1998 Braidwood Generating Station, Units 1 and 2 Facility Operating Licenses NPF-72 and NPF 77 NRC Docket Nos 50-456 and 50-457 Ladies and Gentlemen:
In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Station, Units 1 and 2, covering the period January 1,1998 through January 31,199f.
~
Please address any comments or questions regarding this matter to Don Ilildobrant at (815) 458-2801, extension 2173.
Very truly yours, Q
ill k
.47'
/
G. K. Schwartz Station Manager B."'dwood Nuclear Station GKS/DCil/dah OACORRESP\\ZCSTECif,BW98 0006 DOC Enclosures cc:
A. B. Beach, Regional Administrator - Rill 8
R. R. Assa, Braidwood Project Manager - NRR i
}f,hp[;.
C. J. Phillips, Senior Resident inspector Braidwood
' i T. J. Esper, IDNS Resident inspector - Braidwood Office of Nuclear Facility Safety - IDNS
~
9802120303 980131 -
PDR ADOCK 05000456
.h A Unicom Company
m.
._.._.._.7._....
. _.. _. _. _,. _ _. _.... _ _ _ -. _. _. _.. =. _
_.. _.. ~.. -. -
l
=<
3 1
r i
d ccf.
- INPO Records Center -
a.
D. L. Farrar, Nuclear Regional Service Mgr.
D.J. Chrzanowski, Nuclear Licensing Admin.
D. R. Eggett, Nuclear Engineering Dept.
.l T. Tulon, Site Vice President, Braidwood D. M. Hoots, Unit i Operating Engineer i
. J. P. Kuchenbecker, Unit 2 Operating Engineer J. M. Bunecicky, Westinghouse D. R. Seavers, A.N.I.'
S. P. Focht, American Nuclear Insurers g
.i L i.
l
)
T e
t~
4 s
z _--
I-k 4
I 1
~'
k
_ _ _ _ ~.. _..
1 4
4
.1 BRAIDWOOD NUCLEAR GENERATING STATION
' UNIT 1 AND UNIT 2
- MONTHLY OPERATING REPORT l
Comed c
J
~
NRC DOCKET NO.- 050-456, LICENSE NO. NPF-72 N.
DOCKET NO. 050-457, LlcENSE NO. NPF-77 l
__a
A. OPERATING DATA REPORT-
+
1
+'
Docket No: $0-456
' Unit: Braidwood 1.
Date: 02/02/98 Completed by:. Don Hildetrant -
Telephone: 815-458 280lx213 P
REPORTING PERIOD: January 1998
- 1) Design Electrical Rating (Mwe Net) 1120
- 2) Maximum Dependable Capadty (Mwe Net) 1100 i
Month Year To Date. Cumulative
- 3) Hours Reactor Critical (Hours) 744.0 744.0 -
66,146,1
- 4) Hours Generator on Line (Hours) 744.0 744.0 65,286.4
- 5) Unit Reserve Shutdown Hours (Hours)
- 0.0 0.0 0.0 -
- 6) Net Electrical Energy (Mwh) 839,708 839,708 66,98,' t'76 1
i t
A r,
.y-p
,.x
,-~s
-r
I
/
I D.
UNIT SHUTDOWNS -
Docket Nor 50 - 456 Unit:
Bradwood 1 Date: 02/02Ar8 i
Completed by:
Don Hildetxant i
Telephone:
815-458-2801x2173 -
I REPORT PERIOD:
January 1998 l
No; Date Type Duration Reason Methsd Cause and Corrective Actsons Hours and Comments None
SUMMARY
Unit i entered the month at 100% capability and operated routinely for the entire month.
TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automahc Trip / Scram D - Regulatory Restriction 4 - Continuahon E - Operator Training / Licensee Examination 5 - Other (explain)
F - Administrative G - Operator Error (explain) -
H - Other (explaW
I s-C.
SAFETY / RELIEF VALVE OPERATIONS Docket No; 50 - 456
. Unit' Braidwood 1 Date: 02/02/98 Completed ty Don Hildebrdnt Telephone:
815-458-2801x2173 5
I Valves.
No. & Type Plant Date Actuated Actuation _
Condshon
_ Description of Event i
None t
r I
i f
i r
b i
L l'
+
3
A. OPERATING DATA REPORT Docket No: 50-457 Unit: Braldwood 2 Date: 02/02/98 Completed by: Don Hildebrant Telephone: 815-458-280lx2173 REPORTING PERIOD: January 1998
- 1) Design Electrical Rating (Mwe Net) 1120
- 2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Dalq Cumulative
- 3) Hours Reactor Critical (Hours) 621.9 621.9 69,003.0
]
- 4) Hours Generator on Line (Hours) 621.9 621.9 68,561.0
- 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0
- 6) Net Electrical Energy (Mwh) 708,010 708,010 70,580,836
D.
UNIT SHUTDOWNS.
Docket No.:
50 - 457-Unit Braidwood 2 '
Date: 02/02/98 ~
Completed by- - Don Hildebrant '
Telephone:
815-458-2801x2173 REPORT PERIOD:
January 1998
-h Date Type Duration Reason - Method Cause and Corrective Actions Hours and Comments 1
980126 F
122.1 G
3 Maintenance Error. Non like-for-'
like EHC electrical circuit card installed during trotableshooting activities.
SUMMARY
Unit 2 entered the month at 100% capability and tripped on 01/26/98 12153 hours due to a Maintenance error. The forced octage was then extended 13 perform other necessary and prudent maintenance items.
TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B -Maintenance or fest 2 - Manual Trip t Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)
F - Administrative G - Operator Error (explain)
H - Other (explain) u____
jjl'
?.
37 12 t x n1
- 2 _ a0 rb8 d
e2 o
7o 8d 8 w/H9i5 l
t 5
4 n
4 d2 e
n0n5 v
a/
0r2o1 E
5B0D8 fo n
- t e: y :e o
.it onabn h
NUD do p
i eh r
te p
c t
k lpl e
e e s
co e
D mT D
o C
no t b ns adn lPoC e'
pn yo i
Tta
&ut
.o c N A SNO ITAR d
E' se P
et O
v au lat E
Vc V
/
Y TEF e
e t
n A
a o
S D
N
.C
{
lll1