Monthly Operating Repts for Nov 1995 for Braidwood Nuclear Generating Station
ML20095F048
Person / Time
Site: Braidwood  
Issue date: 11/30/1995
From: Pershey C, Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BW-95-0117, BW-95-117, NUDOCS 9512180256
Download: ML20095F048 (10)


Text

... _ -. - -. _... _

~

Commonwe:dtli I:dison Company liraidwtwxl Generating Station Route a1. Ilox 8 I firaces ille.11. N uo'.%I9

  • TelMi4-lM 2XOL December 7,1995 BW/95 0117 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

Enclosed for your information is the bionthly Performance Report covering Braidwwd Nuclear Generating Station for the period November 1 through 30,1995.

Yours truly,

'f. Tulon Station hianager Braidwood Nuc! car Station TJT/CP/dla o:korrespVesteno\\bwdletts. doc Attachments cc:

II. J hiiller, USNRC, Region 111 R. R. Assa, USNRC I.D.N.S.

USNRC Resident inspector, Braidwood INPO Records Center D. L. Farrar, Nuclear Regional Service higr.

D. bl. Saccomando, Nuclear Licensing Admin.

D. R. Eggett, Nuclear Engineering Dept.

K. Kaup, Site Vice President, Braidwood NFS, PWR Plant Support P. L. liabel, Unit i Operating Engineer J. P. Kuchenbecker, Unit 2 Operating Engineer I.D.N.S. Resident inspector, Braidwood J. bl. Bunccicky, Westinghouse D. R. Scavers, A.N.I.

T E ' ~i 9 d 9512180256 951130 PDR ADOCK 05000456

/

R PDR I

A linicom Company

)

j l:

8 1

i BRAIDWOOD NUCLEAR POWER STATION a

1 UNIT 1 AND UNIT 2 MONTilLY PERFORMANCE REPORT Comed i

NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 s

I t.

\\

\\

i

i

,A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 12/05/1995 Completed by: Chris Pershey Telephone: 816 458-2801 OPERATING STATUS

1) Reporting Period: November 1995 Gross Hours:

720

2) Currently Authorized Power Level (MWt):

3411 Design Electrical Rating (MWe-gross):

1175 Design Electrical Rating (MWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 Max Dependable Capacity (MWe-net):

1120

3) Powerlevel to which restricte6 (If Any):

None

4) Reasons for restrictions (If Any):

None This Mo.

Yr to Date Cumulative

5) Report Period Hours:

720 8,016 64,329

6) Hours Reactor Critical:

0 5,832 50,430 4

7) RX Reserve Shutdown Hours:

0 0

0

8) Hours Generator on Line:

0 5,788.

49,754

9) Unit Reserve Shutdown Hours:

0 0

0 10 Gross Thermal Energy (MWHt):

0 19,036,419 156,475,717 11 Gross Elect. Energy (MWH):

0 6,558,194 53,062,016 12 Net Elect. Energy (MWH):

-10,027 6,287,381 50,820,201 13 Reactor Service Factor:

0.0 72.7 78.4 14 Reactor Availability Factor:

0.0 72,7 78.4 15 Unit Service Factor:

0.0 72.2 77,3 16 Unit Availability Factor:

0.0 72.2 77,3 17 Unit Capacity Factor (MDC NET):

-1,2 70.0 70.5 18 Unit Capacity Factor (DER NET):

-1,2 70.0 70.5 19 Unit Forced Outage Rate:

0.0 3.1 7.8 20 Unit Forced Outage Hours:

0.0 184.0 4214.5 21 Shutdown Schedule Over Next 6 Months:

22 If Shutdown at End of Reporting Period.

Estimated Date of Startup:

12/14/1995

-. - - ~

i l

.B. AVERAGE DAILY UNIT NET POWER LEVEL LOG j

Docket No: 50 456 Unit: Braidwood 1 Date: 12/05/1995 Completed by: Chris Pershey Telephone: 815-458 2801 MONTH: November 1995 Ray MWe-net Qay MWe-net 1)

-13 16)

-14 2) 13 17)

-14 3) 13 18)

-14 4)

-13 19)

-14 5)

-13 20)

-14 1

6) 13 21)

-14 7)

-13 22)

-15 8) 13 23) 15 9)

-13 24) 15 10)

-13 25)

-15 11)

-13 26) 15 12) 13 27) t

-15 13)

-13 28) 15 14)

-13 29) 15 15)

-14 30) 15 1

, _, _ =. _. _

C.

UNIT SHUTDOWNS / REDUCTIONS Docket No.:

50- 456 Unit Braidwood 1 Date: 12/05/95 Completed by-Chris Pershey Telephone:

815-458-2801 REPORT PERIOD:

November 1995 LER Cause & Corrective Action NA Date Type Hours Reason Method Number System Component to Prevent Recurrence 32 11/01/95 S

720 C

4 D

I i

SUMMARY

Ulit 1 entered the month of November 1996 in its scheduled fifth refueling outage which began 9/30/1996. The refueling outage continued as l

scheduled through the end of the month.

i TYPE l!

REASON METHOD SYSTEM & COMPONENT I

F - Forced A-Equipment Failure Maint or Test 1 - Manual 8 - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Properation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).

{

F - Administration l

1 G - Operator Error H - Other i

~ -

i i

I D.

SAFETY / RELIEF VALVE OPERATIONS Docket No.:

50-456 t

Unit:

Braidwood 1 l

Date: 12/05/95 Completed by-John Lewis i

Telephone:

815-458-2801 i

Valves No. & Type Plant Date Actuated Actuatson Condition Description of Event

[

None j

r i

1 e

e 9

i i

i.

i t

h h

s I

i l

h

.~

, A. OPERATING DATA REPORT Docket No: 50-457 Unit: Braldwood 2 Date: 12/05/1995 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS

1) Reporting Period: November 1995 Gross Hours:

720

2) Currently Authorized PowerLevel(MWt):

3411 Design Electrical Rating (MWe-gross):

1175 Desigr, Electrical Rating (MWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 Max Dependable Capacity (MWe net):

1120

3) Power level to which restricted (if Any):

None

4) Reasons for restrictions (If Any):

None This Mo.

Yr to Date Cumulative

5) Report Period Hours:

720.0 8,016.0 62,411.0

6) Hours Reactor Critical:

720.0 7,845.0 52,677.4

7) RX Reserve Shutdown Hours:

.0

.0

.0

8) Hours Generator on Line:

720.0 7,839.8 52,282.1

9) Unit Reserve Shutdown Hours:

.0

.0

.0 10 Gross Thermal Energy (MWHt):

2,437,770.1 26,289,105.7 165,753,038.4 11 Gross Elect. Energy (MWH):

840,750.0 9,019,356.0 55,039,145.0 12 Net Elect. Energy (MWH):

810,185.0 8,701,886.0 52,804,616.0 13 Reactor Service Factor:

100.0 97.9 84.4 14 Reactor Availability Factor:

100.0 97.9 84.4 15 Unit Service Factor:

100.0 97.8 83.8 16 Unit Availability Factor:

10' O 97.8 83.8 17 Unit Capacity Factor (MDC NET):

10 3 96.9 75.5 18 Unit Capacity Factor (DER NET):

ic.5 96.9 75.5 19 Unit Forced Outage Rate:

0.0 2.2 5.3 20 Unit Forced Outage Hours:

0.0 176.3 2947.6 21 Shutdown Schedule Over Next 6 Months: Refuel Outage - 03/02/1996 22 If Shutdown at end of Reporting Period, Estimated Date of Startup:

-.. _ - - _ -. -. -. - -. =

_ - -.. - -. - -..... - - -. -.. - -.. ~

2

'l

. B. AVERAGE DAILY UNIT NET POWER LEVEL LOG i

Docket No: 50 457 Unit: Braldwood 2 I

Date: 12/05/1995 l

Completed by: Chris Pershey Telephone: 815-458 2801 MONTH: November 1995 h

MWe-net h

MWe-net 1) 1140

  • 16) 1125
  • 2) 1139
  • 17) 1130
  • 3) 1138
  • 18) 1130
  • 4) 1138
  • 19) 1129
  • 5) 1140
  • 20) 1128
  • 6) 1141
  • 21) 1118 7) 1141
  • 22) 1115 0) 1139
  • 23) 1115 9) 1140
  • 24) 1115 10) 1140
  • 25) 1113 11) 1135
  • 26) 1012 12) 1141
  • 27) 1106 13) 1135
  • 28) 1114 14) 1132
  • 29) 1116 1

15) 1124

  • 30) 1116 a

1

  • Due to condenser efficiency i

~

i 9

C.

UNIT SHUTDOWNS / REDUCTIONS Docket No.:

50 -457 I

Unit Braidwood 2 Date: 12/05/95 Completed by:

Chris Pershey Telephone:

815-458-2801 4

REPORT PERIOD:

November 1995 i

LER Cause & Corrective Action h

Date Type Hours Reason Method Number System Comoonent to Prevent Recunence l

I N/A i

I l

I i

t I

)

f I

I l

^

SUMMARY

i Unit 2 entered the month of November 1995 at 100% capability and -:-;+ _^ I routinely the entire month.

[

i I

TYPE REASON METHOD SYSTEM & COMPONENT i

i F - Forced A-Equipment Failure Maint orTest 1 -Manual l

0 -Scheduled B -Maint or Test 2 - Manual Scram Exhibit F & Instructions for C -Refueling 3 - Auto Scram Preparation of Data Entry Sheet D -Regulatory Restriction 4 -Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG4161).

F - Administration G -Operator Error H - Other i

l I

r i

i

D.

SAFETY / RELIEF VALVE OPERATIONS Docket Nor 50 - 457 l

Unit:

Braidwood 2

~

Date: 12/05/95 l

Completed by-John Lewis Telephone:

815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None f

b i

l l

r P

f i

k

[

I i

I 1

4 r

f h,

t

-