ML20217G157

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Sept 1997 for Braidwood Generating Station,Units 1 & 2,covering Period 970901-970930
ML20217G157
Person / Time
Site: Braidwood  
Issue date: 09/30/1997
From: Hildebrant D, Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BW-97-0053, BW-97-53, NUDOCS 9710090237
Download: ML20217G157 (9)


Text

(.sitninonw talth I tiiwn ( 4Hnjian) firahlw au nt (irnerating Nation Routs eI,Ilin H e lirntg ille, 11,60 001'b19

'IrlHI4 682H01 October 2,1997 IlW/97-0053 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 0001

Subject:

Monthly Operating Report for Sepetember,1997 ilraidwood Generating Station, Units 1 and 2 Facility Operating Licenses NPF.72 and NPF-77 NRC Docket Nos 50-456 and 50.432 Ladies and Gentlemen:

In accordance with Technical Specification 6.9.1 A enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Statio. Units I and 2, covering the period September I,1997 through September 30,1997.

Please address any comments or questions regarding this matter to Don Ilildebrant at (815) 458 2801, extension 2173.

Very truly yours, N

, Tulon

'tation Manager Braidaood Nuclear Station

)

TJT/DCl!!dah

}

o CoRRI SIVCSTI clillW97 0053 Ixic

)

Enclosures cc:

A. B. Beach, Regional Administrator Rill R. R. Assa, Braidwood Project Manager NRR C. i. Phillips, Senior Resident inspector Braidwood T. J. Esper, IDNS Resident inspector firaidwood OfTice of Nuclear Facility Safety IDNS

'~

9710090237 970930 PDR ADOCK 05000456 a

PDR b!,h,l$!

on _ (.,a,

I cc:

INPO Records Center D. L Farrar. Nucluir Regional Senice Mgr.

D.J. Chuanowski, Nuclear Licensing Admin.

D. R. Eggett, Nuclear Enginecting Dept.

j 11 O. Stanley, Site Vice President, Draidwood D. M. Iloots. Unit i Operating Engineer i

J. P. Kuchenbecker, Unit 2 Operating Engineer J. M. Dunecicky, Westinghouse D. R. Scavers, A.N.I.

S. P. Focht, American Nuclear Insurers l

1 J

g

  • l m

-,n-

,_,,-..v-.

,-n--.

,~ _

llRAIDWOOD NUCLEAR GENERATING STATION UNIT 1 AND UNIT 2 MONTilLY OPERATING REPORT ComEtt NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77

l i

A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 10/02/97 Completed by: Don Hildebrant l

Telephone: 815 458 280lx2173 l

l REPORTING PERIOD: September 1997

1) Design Electrical Rating (Mwe Net) 1120
2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date cumulative
3) Hours Reactor Critical (Hours)-

720.0 5,168.7 63,194.1.

4) Hours Generator on Line (Hours) 720.0 5,130.7 62,334.4

- 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0

6) Net Electrical Energy (Mwh) 804,376 5,566,049 63,627,450 i

6 b

t t

i

..r--

e - v w w w-,

-e-,v-y-m-r--

e-

-,y-5.----,+ve,--r--,..r w,

r;

--,-n e,-t,rs.w w - =

r-,

-+r-e,-

e*--*=t

-twviwwrv-w-r--

W r7<am m-mr Tev e r m w' s.

  • Pt'-

u-r*--

D.

UNIT SHUTDOWNS Docket No.:

50 -456 Unit Braedwood 1 Date: 10/02/97-Completed by-Don Heidebrant T&gt.cise:

815-458-2801x2173 REPORT PERIOD:

September 1997 h

Date Type Durabon Reason Method Cause and Corrective Actsons Hours and Conunents None

SUMMARY

Unit 1 entered the month at 100% _, -':"ri and operated r-:2:._;j for the entste month.

TYPE REASON METHOD F-Forced A - Equepment Fasture (explain) 1 - Manual S -Scheduled B -Maintenance orTest -

2 -Manual Trip / Scram C - Refueling 3 - Autonsatsc Trip / Scram D - Regulatory Resenction 4 -Contineshon E - Operator Training / Licensee Examenation 5 - Other (expleen)

F - Administratswe G - Operator Error (explain)

H - Other (explain)

1-q s

i i

C.-

SAFETYI REUEF VALVE OPERATIONS Docket No; 50 - 456 Unit Bradwood 1 Date: 10/02/97 i

Cw 6 tdty Don Heidebrant T,,k,#.cne-815-458-2801x2173 f,

i Valves No. & Type Plant Date Actuated Actualson Condseson Descristoon of Event i,

1 None I>

?

4 5

i

,i t

d i

L d,

1.

t I

t r

4 i

1 i

4 4

t I

f f

i l

4 1

]

s e

i i

I

i I

A.,OPEPATING DATA REPORT Docket No: 50 457 Unit: Braidwood 2 Date: 10/02/97 Completed by: Don Hildebrant Telephone: 815 458 280lx2173 REPORTING PERIOD: September 1997

1) Design Electrical Rating (Mwe Net) 1120
2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative 624.0 6,455.0 67,244.1
3) Hours Reactor Critical (Hours) 624.0 6,455.0-66,831.1
4) Hours Generator on Line (Hours)
5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0
6) Net Electrical Energy (Mwh) 656,553 7,129,981 68,768,059

l C.

UNIT SHUTDOWNS

~

Docket No; 50 -457 Unt Bradwood 2 Date: 10/02/97 Completed by:

Don Heidebrant Telephone:

815-458-2801x2173 REPORT PERIOD:

September 1997 h

Date Type Duration Reason Method Cause and Correctrve Actsons Hours and Comments 1

970927 S

96 C

2 Scheduled sixth refueling outage

SUMMARY

Unit 2 entered the month at 100% capabetety and operated routmely for the entste month. On 9/27/97 the Unit was taken off line for the sixth scheduled refueling outage.

TYPE REASON METHOD F - Forced A - Equepment Fadure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refuelmg 3 - Automatic Trip 1 Scram D - Regulatory Restnction 4 - Contir:uatson E - Operator Trameng / Licensee Exarmnatson 5 - Other (explain) 8 - Admimstrative

- Operator Error (explain) 1-Other (explain)

_m-..____.___.___-._-._

w----

4 Ef

{g u

d m

i I

I s

b N

k z

h Il0 i

i

-]

1 t

e 3

U

..