Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARBW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 ML20217Q1951998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Braidwood Generating Station,Units 1 & 2 ML20202C6431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Braidwood Generating Station,Units 1 & 2 ML20198J7091997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Braidwood Generating Station,Units 1 & 2 ML20202H6231997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Braidwood Generating Station,Units 1 & 2 ML20199D0781997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Braidwood Generating Station,Units 1 & 2 ML20217G1571997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Braidwood Generating Station,Units 1 & 2,covering Period 970901-970930 ML20216C2931997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Braidwood Generating Station,Units 1 & 2 ML20198F0321997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Braidwood Generating Station,Units 1 & 2 ML20140C6271997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Braidwood Generating Station,Units 1 & 2 ML20148B2411997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20137N9971997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20136B4371997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20138J9891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Braidwood Nuclear Power Station,Units 1 & 2 ML20133E1641996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20132B9511996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20134G8341996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Braidwood Nuclear Power Station,Unit 1 & 2 ML20128K2631996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117K7451996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Braidwood Nuclear Power Station Unit 1 & 2 ML20116M6171996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs Nuclear Power Station,Units 1 & 2 ML20115B0731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Bs ML20117K4761996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Braidwood Nuclear Power Station Units 1 & 2 ML20117D6991996-04-30030 April 1996 Monthly Operating Repts for Apr 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20101N8121996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Braidwood Nuclear Power Station,Units 1 & 2 ML20100Q7161996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Braidwood Units 1 & 2 ML20100Q7051996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Braidwood Unit 1 ML20097D4171996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Braidwood Nuclear Power Station ML20100Q7021995-12-31031 December 1995 Revised Monthly Operating Rept for Dec 1995 for Braidwood Unit 1 ML20096E6191995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Braidwood Nuclear Power Station Units 1 & 2 ML20095F0481995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Braidwood Nuclear Generating Station ML20094H1031995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Braidwood Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G9961999-10-14014 October 1999 SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A7441999-09-10010 September 1999 Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With ML20210R6421999-08-13013 August 1999 ISI Outage Rept for A2R07 ML20210U8111999-08-0404 August 1999 SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With ML20210K9861999-07-30030 July 1999 Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20216D3841999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function1999-07-12012 July 1999 Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With ML20209H7481999-05-31031 May 1999 Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20196A0721999-03-16016 March 1999 Cycle 8 COLR in ITS Format & W(Z) Function ML20207J4371999-03-0808 March 1999 ISI Outage Rept for A1R07 ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With ML20206U9011999-02-15015 February 1999 COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not Included BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With1999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20206U9081998-12-17017 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195D3561998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With ML20155B6711998-10-26026 October 1998 Safety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program Plan ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154D4401998-10-0202 October 1998 Safety Evaluation Authorizing Second 10-yr Interval ISI Program Request for Relief 12R-30 for Plant,Units 1 & 2 ML20155C2601998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 ML20195F5911998-09-11011 September 1998 Special Rept:On 980812,addl Unseated Wires Were Discovered. Cause Is Unknown at Present Time.Util Evaluated Number of Unseated/Ineffective Wires & Determined Effect on Containment Structural Integrity.Commitments,Encl ML20196B3711998-09-0808 September 1998 Cycle 8 Operating Limits Rept (Olr) ML20151X6671998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With ML20238F3281998-08-31031 August 1998 SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2 ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237A1091998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 ML20236N7001998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 ML20198A0151998-06-18018 June 1998 10CFR50.59 Summary Rept 960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & FP Rept.Without Fp,Rept ML20249A5451998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 ML20247F7711998-05-0808 May 1998 Special Rept:On 980403 & 980503 Seismic Monitoring Sys Was Declared Inoperable.Caused by 5-volt Power Supply & Regulator Card Failure.Imd & Sys Engineering Are Continuing to Identify & Resolve Problems So Sys Can Be Operable ML20247L7591998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 ML20217K6331998-04-20020 April 1998 Safety Evaluation Accepting Methodology & Criteria Used in Generating Flaw Evaluation Charts for RPV of Braidwood IAW Section XI of ASME Code ML20216C6621998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 1999-09-30
[Table view] |
Text
CA,mmonw ralth IMiwn Casmpany a
liraidwootl Gesicrating Station
, Route 01, liox 8 6 se', '
liracevdle, II. N)lO7A>619 T.clHI44 M 2801 June 2,1997 BW/97-0030 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Monthly Operating Report for hiay,1997 Braidwood Generating Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Ladies and Gentlemen:
In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Conunonwealth Edison Company's (Comed's) Braidwood Generating Station, Units I and 2, covering the period May 1,1997 through May 31,1997.
Please address any comments or questions regarding this matter to Don Hildebrant at (815) 458-2801, extension 2173.
i Very truly yours,
. Tulon tation Manager Braidwood Nuclear Station TJT/DCH/dati O \CORRESP2CS fECif BW97-0030 Enclosures I cc: A. B. Beach, Regional Administrator - Rlli R. R. Assa, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident inspector - Braidwood T. J. Esper, IDNS Resident inspector - Braidwood Office of Nuclear Facility Safety - IDNS 9706100003 970531 i
. .$.$$$.kk{k{
PDR ADOCK 05000456 R PDR A l'nicom Company
9 l cc: INPO Records Center
( D. L. Farrar, Nuclear Regional Service Mgr.
H.D. Pontious, Nuclear Licensing Admin.
D. R. Eggett, Nuclear Engineering Dept.
H. G. Stanley, Site Vice President, Braidwood D. M. Hoots, Unit i Operating Engineer i J. P. Kuchenbecker, Unit 2 Operating Engineer J. M. Bunecicky, Westinghouse .
D. R. Seavers, A.N.I. i S. P. Focht, American Nuclear Insurers l C. E. Pershey, Braidwood F. Bash, Braidwood l
l l
l l
l l
I h
J 4
BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77
A. OPERATING DATA REPORT Docket No: 50 -456 Unit: Braidwood 1 Date: -06/02/1997 Completed by: Don Hildebrant ,
Telephone: 815-458-2801 l OPERATING STATUS x2173
- 1) Reporting Period: May 1997 Gross Hours: 744 l
- 2) Currently Authorized Power Level (MWt): 3411 l Design Electrical Rating (MWe-gross): 1175 !
Design Electrical Rating (MWe-net): 1120 i Max Dependable Capacity (MWe-gross): 1175 ;
Max Dependable Capacity (MWe-net): 1120
- 3) Power level to which restricted (If Any): None j I
- 4) Reasons for restrictions (if Any): None l l
This Mo. Yr to Date Cumulative
- 5) Report Period Hours: 744 3623 77480
- 6) Hours Reactor Critical: 151.3 2,240.7 60,266.1
- 7) RX Reserve Shutdown Hours: 0.0 0.0 0.0
- 8) Hours Generator on Line: 114.6 2,202.7 59,406.4
- 9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 {
- 10) Gross Thermal Energy (MWHt): 122,666 7,130,168 190,638,742
]
- 11) Gross Elect. Energy (MWH): 31,082 2,465,899 63,076,003
- 12) Net Elect. Energy (MWH): 18,987 2,356,357 60,417,758 )
- 13) Reactor Service Factor: 20.3 61.8 77.8 !
- 14) Reactor Availability Factor 20.3 61.8 77.8 l
- 15) Unit Service Factor. 15.4 60.0 76.7 l
- 16) Unit Availability Factor: 15.4 60.8 76.7
- 17) Unit Capacity Factor (MDC NET): 2.3 58.1 69.6
- 18) Unit Capacity Factor (DER NET): 2.3 58.1 69.6
- 19) Unit Forced Outage Rate: 0.0 0.0 7.4
- 20) Unit Forced Outage Hours: 0.0 0.0 4,714.4 1
- 21) Shutdown Schedule Over Next 6 Months:
22)lf Shutdown at End of Reporting Period, Estimated Date of Startup: N/A i l
l ,
i
- 8. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 -456 Unit: Braidwood 1 Date: 06/02/1997 Completed by: Don Hildebrant Telephone: 815-458-2801 l MONTH: May 1997 x2173 J
Qay MWe-net Qay a MWe-net
- 1) -12 16) -13
- 2) -12 17) -13
- 3) -12 18) -14 j
- 4) -12 19) -14 I
- 5) -12 20) -14
- 6) -12 21) -14
- 7) -12 22) -14
- 8) 12 23) -14 )
- 9) -12 24) -14 l
- 10) -13 25) -14
- 11) -13 26) -14
- 12) -12 27) 80 l
- 13) -13 28) 186
- 14) -13 29) 216
- 15) -12 30) 224
- 31) 425 l
l l
C. UNIT SHUTDOWNS / REDUCTIONS .. 4 Docket No.. 50- 456 Unit: Braidwood 1 -
Date: 06f02/97 ;
Completed by- Don Hildebrant Telephone: 815-458-2801x2173 REPORT PERIOD: May 1997 i i
LER Cause & Corrective Action
% Date Type Hours Reason Method Number System Component to Prevent Recurrence 4 970501 S 592.7 C 4 Continuing scheduled sixth 4 refueling outage f
SUMMARY
Unit 1 continued its refueling outage until May 261997 when normal startup activities began.
TYPE REASON METHOD SYSTEM & COMPONENT !
F - Forced A - Equipment Failure Maint or Test 1 - Manual
- S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H - Other l
_ _ . - . _ _ _ _ . _ . . ..m_._ .. _ .. . _ . _ . _ _ _ . _ . . -
D. SAFETY / RELIEF VALVE OPERATIONS ..
Docket No.: 50- 456 Unit: Braidwood 1 Date: 06/02/97 Completed by: Ted Eliakis Telephone: 815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event I None i
i l
i t
f i
f i
i t
f i
i
?
. .- . - .. - .- , - _ _ . - -.~..-_. -. . -..-. -.. . .
- A. OPERATING DATA REPORT d
Docket No: 50 -457 Unit: Braidwood 2
) Date: 06/02/1997 ,
Completed by: Don Hildebrant l Telephone: 815-458-2801 I
OPERATING STATUS x2173 :
I l 1) Reporting Period: May 1997 Gross Hours: 744 l 4
I l 2) Currently Authorized Power Level (MWt): 3411 f
Design Electrical Rating (MWe-gross): 1175
} Design Electrical Rating (MWe-net): 1120 !
Max Dependable Capacity (MWe-gross): 1175 ,
Max Dependable Capacity (MWe-net): 1120
! 3) Power level to which restricted (if Any): None i
- 4) Reasons for restrictions (if Any): None ;
This Mo. Yr to Date Cumulative a
- 5) Report Period Hours: 744 3623 75562 1 I
- 6) Hours Reactor Critical: 744.0 3,623.0 64,412.1
- 7) RX Reserve Shutdown Hours: 0.0 0.0 0.0
- 8) Hours Generator on Une: 744.0 3,623.0 63,999.1
- 9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 10) Gross Thermal Energy (MWHt): 2,528,888 12,278,093 207,526,189
- 11) Gross Elect. Energy (MWH): 871,949 4,229,214 68,459,485
- 12) Net Elect. Energy (MWH): 839,172 4,089,188 65,727,266
- 13) Reactor Service Factor: 100.0 100.0 85.2
- 14) Resctor Availability Factor: 100.0 100.0 85.2
- 15) Unit Service Factor: 100.0 100.0 84.7 J
- 16) Unit Availability Factor: 100.0 100.0 84.7 l
- 17) Unit Capacity Factor (MDC NET): 100.7- 100.8 77.7 l
- 18) Unit Capacity Factor (DER NET): 100.7 100.8 77.7 !
- 19) Unit Forced Outage Rate: 0.0 0.0 4.4 I
- 20) Unit Forced Outage Hours: 0.0 0.0 2,947.6 '
- 21) Shutdown Schedule Over Next 6 Months: 9/27/97 Refueling outage 22)If Shutdown at end of Reporting Period, Estimated Date of Startup: N/A ,
- B. AVERAGE DAILY UNIT NET POWER LEVEL LOG l Docket No: 50 -457 I
, Unit: Braidwood 2 Date: 06/02/1997 Completed by: Don Hildebrant Telephone: 815-458-2801 MONTH: May1997 .x2173 l
pay MWe-net D_ay MWe-net l
- 1) 1143 (2) 16) 1138 (2) '
- 2) 1143 (2) 17) 1118 l 3) 1142 (2) 18) 1117
- 4) 1142 (2) 19) 1114
- 5) 1142 (2) 20) 1115 l
- 6) 1142 (2) 21) 1115
- 7) 1143 (2) 22) 1114
- 8) 1143 (2) 23) 1112 j
- 9) 1142 (2) 24) 1110
- 10) 1140 (2) 25) 1109
- 11) 1068 (1) 26) 1114
- 12) 1140 (2) 27) 1124 (2)
- 13) 1136 (2) 28) 1128 (2)
- 14) 1136 (2) 29) 1129 (2)
- 15) 1139 (2) 30) 1127 (2)
- 31) 1128 (2)
(1)TV/GV Valve Testing (2) Due to normal station load fluctuations and cool Circulating Water temperatures l
l
O*
C. UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 -457
- Unit: Braidwood 2 Date: 06/02/97 Completed by: Don Hildebrant Telephone: 815-458-2801x2173 REPORT PERIOD: May 1997 LER Cause & Corrective Action h Date Type Hours Reason Method Numtrer System Component to Prevent Recurrence None
SUMMARY
Unit 2 entered the month of May 1997 at 100% capability and operated routinely for the entire month.
TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & lastructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File !'
E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H - Other
o _.
D. SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50 - 457
- Unit: Braidwood 2 Date: 06/02/97 Completed by: Ted Eliakis Telephone: 815-458-2801 Date Ac d Actuatio Co dition Description of Event None i