4 4
A. OPERATING DATA REPORT Docket No: 50 - 456 Unit: Braidwood 1 Date: 03/06/1996 Completed by:. Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: January 1996 Gross Hours:
744
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120
- 3) Power level to which restricted (if Any):
None
- 4) Reasons for restrictions (If Any):
None 1
This Mo.
Yr to Dats Cumulative
- 5) Report Period Hours:
744 744 65817
- 6) Hours Reactor Critical:
744.0 744.0 51721.9
-l
- 7) RX Reserve Shutdown Hours:
0.0 0.0 0.0
- 8) Hours Generator on Line:
744.0 744.0 50924.7
- 9) Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10 Gross Thermal Energy (MWHt):
2,507,423 2,507,423 163,499,661 11 Gross Elect. Energy (MWH):
876,281 876,281 54,266,e01 12 Net Elect. Energy (MWH):
845,942 845,942 51,973,302 13 Reactor Service Factor:
100.0 100.0 78.6 14 Reactor Availability Factor:
100.0 100.0 78.6 15 Unit Service Factor:
100.0 100.0 77.4 16 Unit Availability Factor:
100.0 100.0 77.4 17 Unit Capacity Factor (MDC NET):
101.5 101.5 70.5 18 Unit Capacity Factor (DER NET):
101.5 101.5 70.5 19 Unit Forced Outage Rate:
0.0 0.0 7.6 20 Unit Forced Outage Hours:
0.0 0.0 4214.5 21 Shutdown Schedule Over Next 6 Months: Mid-cycle outage - 05/21/1996 j
22 If Shutdown at End of Reporting Period.
Estimated Date of Startup:
9603120097 960306 PDR ADOCK 05000456 R
. - -