4 4

A. OPERATING DATA REPORT Docket No: 50 - 456 Unit: Braidwood 1 Date: 03/06/1996 Completed by:. Chris Pershey Telephone: 815-458-2801 OPERATING STATUS

1) Reporting Period: January 1996 Gross Hours:

744

2) Currently Authorized Power Level (MWt):

3411 Design Electrical Rating (MWe-gross):

1175 Design Electrical Rating (MWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 Max Dependable Capacity (MWe-net):

1120

3) Power level to which restricted (if Any):

None

4) Reasons for restrictions (If Any):

None 1

This Mo.

Yr to Dats Cumulative

5) Report Period Hours:

744 744 65817

6) Hours Reactor Critical:

744.0 744.0 51721.9

-l

7) RX Reserve Shutdown Hours:

0.0 0.0 0.0

8) Hours Generator on Line:

744.0 744.0 50924.7

9) Unit Reserve Shutdown Hours:

0.0 0.0 0.0 10 Gross Thermal Energy (MWHt):

2,507,423 2,507,423 163,499,661 11 Gross Elect. Energy (MWH):

876,281 876,281 54,266,e01 12 Net Elect. Energy (MWH):

845,942 845,942 51,973,302 13 Reactor Service Factor:

100.0 100.0 78.6 14 Reactor Availability Factor:

100.0 100.0 78.6 15 Unit Service Factor:

100.0 100.0 77.4 16 Unit Availability Factor:

100.0 100.0 77.4 17 Unit Capacity Factor (MDC NET):

101.5 101.5 70.5 18 Unit Capacity Factor (DER NET):

101.5 101.5 70.5 19 Unit Forced Outage Rate:

0.0 0.0 7.6 20 Unit Forced Outage Hours:

0.0 0.0 4214.5 21 Shutdown Schedule Over Next 6 Months: Mid-cycle outage - 05/21/1996 j

22 If Shutdown at End of Reporting Period.

Estimated Date of Startup:

9603120097 960306 PDR ADOCK 05000456 R