Revised Monthly Operating Rept for Jan 1996 for Braidwood Unit 1
ML20100Q705
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 01/31/1996
From: Pershey C
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20100Q695 List:
References
NUDOCS 9603120097
Download: ML20100Q705 (1)


Text

. . _ .

4 4

A. OPERATING DATA REPORT Docket No: 50 - 456 Unit: Braidwood 1 Date: 03/06/1996 Completed by: . Chris Pershey Telephone: 815-458-2801 OPERATING STATUS  !

1) Reporting Period: January 1996 Gross Hours: 744
2) Currently Authorized Power Level (MWt): 3411  !

Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 Max Dependable Capacity (MWe-net): 1120 ,

I

3) Power level to which restricted (if Any): None l
4) Reasons for restrictions (If Any): None 1 l

This Mo. Yr to Dats Cumulative

5) Report Period Hours: 744 744 65817
6) Hours Reactor Critical: 744.0 744.0 51721.9
7) RX Reserve Shutdown Hours: 0.0 0.0 0.0 -l
8) Hours Generator on Line: 744.0 744.0 50924.7
9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 10 Gross Thermal Energy (MWHt): 2,507,423 2,507,423 163,499,661 11 Gross Elect. Energy (MWH): 876,281 876,281 54,266,e01 12 Net Elect. Energy (MWH): 845,942 845,942 51,973,302 13 Reactor Service Factor: 100.0 100.0 78.6 14 Reactor Availability Factor: 100.0 100.0 78.6 l 15 Unit Service Factor: 100.0 100.0 77.4 l 16 Unit Availability Factor: 100.0 100.0 77.4 17 Unit Capacity Factor (MDC NET): 101.5 101.5 70.5 18 Unit Capacity Factor (DER NET): 101.5 101.5 70.5 19 Unit Forced Outage Rate: 0.0 0.0 7.6 20 Unit Forced Outage Hours: 0.0 0.0 4214.5 21 Shutdown Schedule Over Next 6 Months: Mid-cycle outage - 05/21/1996 j 22 If Shutdown at End of Reporting Period.

Estimated Date of Startup:

I 9603120097 960306 PDR ADOCK 05000456 R PDR