Monthly Operating Repts for Sept 1996 for Braidwood Nuclear Power Station Units 1 & 2
ML20128K263
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/30/1996
From: Pershey C, Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BW-96-0088, BW-96-88, NUDOCS 9610110019
Download: ML20128K263 (10)


Text

._. . - -- - .~.

  • . = Commonwralth Illivan Company

, liraidwood Generating Station Route al. Ika H 4

' firaceville. fl. 60 Hr%lv i Tel M15-iW2801 l l

October 4,1996 ,

BW/96-0088 l

United States Nuclear Regulatory Commission '

Attention: Document Control Desk Washington, D.C. 23555-0001

Subject:

Monthly Operating Report for September,1996 Braidwood Nuclear Power Station, Units I and 2 1 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos 50-456 and 50-457

)

l Ladies and Gentlemen:

In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Nuclear Power Station, Units I and 2, covering the period September 1,1996 through September 30, 1996. l Please address any comments or questions regarding this matter to Chris Pershey at (815) 458-2801, extension 2173.

Very truly yours, vY ./ q

. Tulon tation Manager Braidwood Nuclear Station TJT/CP/md 0:CORRESP7fSTEcliJ1w%0088 Enclosures cc: A. B. Beach, Regional Administrator - Rill R. R. Assa, Braidwood Project Manager - NRR I C. J. Phillips, Senior Resident inspector - Braidwood T. J. Esper, IDNS Resident Inspector - Braidwood @)9 Office of Nuclear Facility Safety - IDNS

\

9610110019 960930 )

PDR ADOCK 05000456 R PDR A I'nitom Compan)

BRAIDWOOD NUCLEAD. POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 l

l

__ a

A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 10/04/1996 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS

1) Reporting Period: September 1996 Gross Hours: 720
2) Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 Max Dependable Capacity (MWe-net): 1120
3) Power level to which restricted (If Any): None
4) Reasons for restrictions (if Any): None This Mo. Yr to Date Cumulative
5) Report Period Hours: 720 6575 71648
6) Hours Reactor Critical: 678.0 6,089.1 57,067.0
7) RX Reserve Shutdown Hours: 0.0 0.0 0.0
8) Hours Generator on Line: 671.6 6,075.1 56,255.8
9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 10 Gross Thermal Energy (MWHt): 2,196,496 20,046,951 180,728,264 11 Gross Elect. Energy (MWH): 753,568 6,914,078 60,304,398 12 Net Elect. Energy (MWH): 724,203 6,656,418 57,783,778 13 Reactor Service Factor: 94.2 92.6 79.6 14 Reactor Availability Factor 94.2 92.6 79.6 15 Unit Service Factor: 93.3 92.4 78.5 16 Unit Availability Factor: 93.3 92.4 78.5 17 Unit Capacity Factor (MDC NET): 89.8 90.4 72.0 18 Unit Capacity Factor (DER NET): 89.8 90.4 72.0 19 Unit Forced Outage Rate. 6.7 7.6 7.7 20 Unit Forced Outage Hours: 48.4 499.9 4,714.4 21 Shutdown Schedule Over Next 6 Months: Mid-cycle outage - 10/11/1996 22 If Shutdown at End of Reporting Period, Estimated Date of Startup:

4 B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50-456 Unit: Braidwood 1 j Date: 10/04/1996 i Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: September 1996 Day MWe-net Day MWe-net

1) 1114 16) 1129 *
2) 1114 17) 1129 *
3) 1113 18) 1128 *
4) 1110 19) 1124 *
5) 1110 20) 1125 *
6) 1019 21) 1101
7) 38 22) 1131 *
8) -15 23) 1131 *
9) 277 24) 1130 *
10) 741 25) 1135 *
11) 1109 26) 1136 *
12) 1120 27) 1136 *
13) 1125
  • 28) 1137 *
14) 1113 29) 1137 *
15) 1129
  • 30) 1136 *
  • Due to condenser efficiency

)

l i

C. UNIT SHUTfiOWNS/ REDUCTIONS Docket No.: 50- 4S6 Unit: Braidwood 1 D.9te: 10/04/96 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: September 1996 LER Cause & Corrective Action h Date Type Hours Reason Method Number System Component to Prevent Recurrence 4 960907 F 48.4 A 1 N/A SJ TV Shut down to repair leaking test taps off the 'C' and 'D' steam generators. The valves were repaired and visually inspected prior to retuming the unit to service.

SUMMARY

Unit 1 entered the month of September 1996 at 100% capability and operated routinely up to 9/7/96 when the unit was shut down to repair leaking test taps off the 'C' and 'D' steam generators. The unit returned to service 9/9/96 and operated routinely the remainder of the month.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161). '

F - Administration G - Operator Error H - Other

i t

D. SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50-456 '

Unit: Braidwood 1 Date: 10/04/96 Completed by: John Lewis

  • Telephone: 815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None l

r b

l L

f

A. OPERATING DATA REPORT Docket No: 50 - 457 j Unit: Braidwood 2 Date: 10/04/1996 i

Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS i

i 1) Reporting Period: September 1996 Gross Hours: 720 ,

l l'

{' 2) Currently Authorized Power Level (MWt): 3411

{ Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120 l Max Dependable Capacity (MWe-gross): 1175 Max Dependable Capacity (MWe-net): 1120 1

i

, 3) Power level to which restricted (If Any): None i

4 l 4) Reasons for restrictions (If Any): None This Mo. Yr to Date Cumulative i

5) Report Period Hours: 720 6575 69730 j 6) Hours Reactor Critical: 720.0 5,158.7 58,580.1
7) RX Reserve Shutdown Hours: 0.0 0.0 0.0
3) Hours Generator on Line: 720.0 5,141.0 58,167.1
9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 10 Gross Thermal Energy (MWHt): 2,439,919 16,893,657 187,675,417 11 Gross Elect. Energy (MWH): 827,734 5,753,446 61,659,233 12 Net Elect. Energy (MWH): 796,402 5,518,358 59,154,126 13 Reactor Service Factor: 100.0 78.5 84.0 14 Reactor Availability Factor: 100.0 78.5 84.0 15 Unit Service Factor: 100.0 78.2 83.4 16 Unit Availability Factor: 100.0 78.2 83.4 17 Unit Capacity Factor (MDC NET): 98.8 74.9 75.7 18 Unit Capacity Factor (DER NET): 98.8 74.9 75.7 19 Unit Forced Ottage Rate: 0.0 0.0 4.8 20 Unit Forced Outage Hours: 0.0 0.0 2,947.6 21 Shutdown Schedule Over Next 6 Months:

22 If Shutdown at end of Repoliing Period, Estimated Date of Startup:

B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457 Unit: Braidwood 2 Date: 10/04/1996 Completed by: Chris Pershey Telephone: 815-458-2801 l MONTH: September 1996 DE MWe-p_et e DE MWe-net l 1) 1034 16) 1119

2) 1101 17) 1118
3) 1101 18) 1118
4) 1098 19) 1118
5) 1097 20) 1118
6) 1099 21) 1116
7) 1087 22) 1115
8) 1083 23) 1115
9) 1097 24) 1115
10) 1106 25) 1115
11) 1109 26) 1118
12) 1112 27) 1119
13) 1117 28) 1120
14) 1121
  • 29) 1057
15) 1109 30) 1118 l

l

m.. . . _ . _ . _ .

.______.s.

. - -i

- i i

C. UNIT SHUTDOWNS /RE['uCTIONS Docket No.: 50 -457 Unit: Braidwood 2 Date: 10/04/96 Completed by: Chris Pershey ,

Telephone: 815-458-2801 REPORT PERIOD: September 1996 LER Cause & Corrective Action i h Date Type Hours Reason Method Number System Component to Prevent Recurrence i i

None

SUMMARY

Unit 2 entered the month of September 1996 at 100% capability and operated routinely the entire month.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual i S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).

F - Administration G - Operator Error H - Other

s D. SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50 - 457 Unit: Braidwood 2 ,

Date: 10/04/96 .

Completed by: John Lewis ,

Telephone: 815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None

_ _ - _ - - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ . - _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ ._, . _ _ _ _ _ _ _ _ _ _ - . - _ - . .__ .- - -__-_ -