Monthly Operating Repts for Mar 1996 for Braidwood Nuclear Power Station,Units 1 & 2
ML20101N812
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/31/1996
From: Lewis J, Pershey C, Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BW-96-0046, BW-96-46, NUDOCS 9604090143
Download: ML20101N812 (11)


Text

I e '

Commonwealth lilimn Osmpany j liraidwood Generating Station

.  % Route al, llox 81 i

Ilraceville, 11.60407-9619 l Tel HI 5-158-2801 '

April 3,1996 1

BW/96-0046  !

l I

United States Nuclear Regulatory Commission '

Attention: Document Control Desk l

Washington, D.C. 20555-0001 l l

Subject:

Monthly Operating Report for March 1996 l Braidwood Nuclear Power Station, Units I and 2 i Facility Operating Licenses NPF-72 and NPF-77 l NRC Docket Nos. 50-456 and 50-457 I l

l Ladies and Gentlemen- '

In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Nuclear Power Station, Units 1 and 2, covering the period March 1,1996 through March 31,1996. j Please address any comments or questions regarding this matter to Chris Pershey at (813) 458-2801, extension 2173.

Very truly yours,

,/ M

4. ulon j tation Manager Braidwood Nuclear Station TJT/CP/dm 0:\CORREsPZCSTECifBW96 0046 Enclosures cc: H. J. Miller, Regional Administrator - RIII R. R. Assa, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident Inspector - Braidwood J. L. Roman, IDNS Resident Inspector - Braidwood Office of Nuclear Facility Safety - IDNS 9604090143 960331 I I 1 l PDR ADOCK 05000456 R PDR (i l

A I?nicom Compan)

BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 1

l i

A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 04/03/1996 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS l 1) Reporting Period: March 1996 Gross Hours: 744

2) Currently Authorized Power Level (MWt): 3411

, Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 Max Dependable Capacity (MWe-net): 1120

3) Power level to which restricted (If Any): None
4) Reasons for restrictions (if Any): None This Mo. Yr to Date Cumulative l

l 5) Report Period Hours: 744 2184 67257

6) Hours Reactor Critical: 300.1 1740.1 52718.0
7) RX Reserve Shutdown Hours: 0.0 0.0 0.0
8) Hours Generator on Line: 292.5 1732.5 51913.2 l 9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 10 Gross Thermal Energy (MWHt): 769,364 5,633,294 164,887.474 11 Gross Elect. Energy (MWH): 262,322 1,961,323 55,351,643 12 Net Elect. Energy (MWH): 244,713 1,884,467 53,011,827 13 Reactor Service Factor: 40.3 79.7 78.4 14 Reactor Availability Factor: 40.3 79.7 78.4 l

l 15 Unit Service Factor; 39.3 79.3 77.2 16 Unit Availability Factor: 39.3 79.3 77.2 17 Unit Capacity Factor (MDC NET): 29.4 77.0 70.4 18 Unit Capacity Factor (DER NET): 29.4 77.0 70.4 l 19 Unit Forced Outage Rate: 60.7 20.7 8.2 20 Unit Forced Outage Hours: 451.5 451.5 4666.0 21 Shutdown Schedule Over Next 6 Months: Mid-cycle outage - 05/21/1996 22 If Shutdown at End of Reporting Period, Estimated Date of Startup:

B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50- 456 Unit: Braidwood 1 Date: 04/03/1996 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: March 1996 Qay MWe-net Qay MWe-net

1) 1147
  • 16) -23
2) 1146
  • 17) -20
3) 1145
  • 18) -15
4) 1146
  • 19) -14
5) 1146
  • 20) -11
6) 1147
  • 21) -11
7) 1145
  • 22) -12
8) 559 23) -14
9) -14 24) -15
10) -14 25) -19
11) -14 26) -18
12) -14 27) 142
13) -14 28) 268
14) -14 29) 253
15) -14 30) 291
31) 933
  • Due to condenser efficiency l

l i

C. UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 04/03/96 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: March 1996 LER Cause & Corrective Action h Date Type Hours Reason Method Number System Component to Prevent Recurrence 1 960308 F 451.5 D 1 EJ BTRY Battery 112 was declared inoperable and the unit was shutdown. Most probable cause is a combination of repeat discharges and the manner of recharging. The battery was replaced, tested satisfactorily and declared operable prior to restart.

Changes to procedures and operating practices will preserve future operability.

SUMMARY

Unit 1 entered the month of March 1996 with 100% capability. The unit was shutdown March 8,1996 due to Battery 112 being declared inoperable.

The unit retumed to service March 27,1996 and 100% capability was restored March 31,1996 after a normally scheduled secondary chemistry boric Ecid soak.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).

F - Administration G - Operator Error H - Other

D. SAFETY / RELIEF VALVE OPERATIONS '

Docket No.: 50 - 456 .

Unit: Braidwood 1 Date: 04/03/96 Completed by: John Lewis Telephone: 815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None l

l l

t I

l l

l 1

A. OPERATING DATA REPORT Docket No: 50 - 457 Unit: Braidwood 2 Date: 04/03/1996 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS j

1) Reporting Period: March 1996 Gross Hours: 744
2) Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120  !

Max Dependable Capacity (MWe-gross): 1175  ;

Max Dependable Capacity (MWe-net): 1120

3) Powerlevel to wlilch restricted (If Any): None
4) Reasons for restrictions (If Any): None This Mo. Yr to Date Cumulative
5) Report Period Hours: 744 2184 65339
6) Hours ReactorCritical: 362.5 1802.5 55223.9
7) RX Reserve Shutdown Hours: 0.0 0.0 0.0
8) Hours Generatoron Line: 361.4 1801.4 54827.5
9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 10 Gross Thermal Energy (MWHt): 1068728 5926620 175337189

.11 Gross Elect. Energy (MWH): 370722 2048430 57954217 12 Net Elect. Energy (MWH): 349697 1968777 55604545 13 Reactor Service Factor 48.7 82.5 84.5 14 Reactor Availability Factor. 48.7 82.5 84.5 15 Unit Service Factor. 48.6 82.5 83.9 16 Unit Availability Factor. 48.6 82.5 83.9 17 Unit Capacity Factor (MDC NET): 42.0 80.5 76.0 18 Unit Capacity Factor (DER NET): 42.0 80.5 76.0 19 Unit Forced Outage Rate: 0.0 0.0 5.1

' 20 Unit Forced Outage Hours: 0.0 0.0 2947.6 21 Shutdown Schedule Over Next 6 Months:

22 If Shutdown at end of Reporting Period, May 3,1996 Estimated Date of Startup:

. 4

[

l l

l B. AVERAGE DAILY UNIT NET POWER LEVEL LOG l Docket No: 50 - 457 Unit: Braidwood 2  ;

i Date: 04/03/1996 l l Completsd by: Chris Pershey Telepnone: 815-458-2801 MONTH: Mart.51996 i

l Qay MWe-net Qay MWe-net

1) 1069 16) -12
2) 1055 17) -20
3) 1048 18) -14
4) 1036 19) -14
5) 1035 20) -12
6) 1017 21) -12 i 7) 1009 22) -12 l 8) 995 23) -14
9) 983 24) -15
10) 975 25) -18 l 11) 956 26) -18
12) 948 27) -15
13) 934 28) -13 i
14) 919 29) -13
15) 820 30) -13
31) -13 l
  • Due to condenser efficiency l

l l l l

l

. __ - - . - - . = _ _ - . . . .. .. - -.

C. UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50-457 -

Unit: Braidwood 2 Date: 04/03/96 Comp!eted by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: March 1996 LER Cause & Corrective Action l

_N_o 2 Date Type Hours Reason Method Number System Component to Prevent Recurrence 1 960316 S 382.7 C 2 Scheduled fifth refueling outage

SUMMARY

Unit 2 entered the month of March 1996 in coastdown toward it's fifth refueling outage. The refueling outage started March 16,1996.

TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).

F - Administration G - Operator Error H - Other

1 D. SAFETY / RELIEF VALVE OPERATIONS . .

Docket No.: 50 - 457 Unit: Braidwood 2 Date: 04/03/96 Cornpleted by: John Lewis Telephone: 815-458-2801 L

Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None i

t l

b b

- . - . - - - - . ~ ,,-rn , - - - - - .-

. . . 1 i

l APY March.11,1996 i

i l

l To: R. Byers D. Cooper T. Kirman L. Weber R. Dralle B. McCue J. Hausser R. F essner M. Paul sister T. Forrest T. Chasensky D. Miller D. Miech A. Haeger J. Chovan H. Cybul T. D' Antonio S. Rooney From: T. Senz Financial Supervisor Ob Please review the attached report for pay period 95 ending March)q(1996.

Please ensure BwAP 100-7A1 is completed, if necessary. Remember the system only recognizes PAID time.

Please return the completed forms, with appropriate signatures, to the timekeepers.

Thank you.

l Attachment k:wpdocs:bwap. doc l

l