ML20217G99614 October 1999SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 &VT-2
Incorporated by reference
BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With30 September 1999Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With
ML20217P63529 September 1999Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear StationsSafe Shutdown Earthquake
Operating Basis Earthquake
Earthquake
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212A74410 September 1999Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & SafetyHydrostatic
VT-2
Incorporated by reference
Finite Element Analysis
Liquid penetrant
BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With31 August 1999Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With
ML20210R64213 August 1999ISI Outage Rept for A2R07Boric Acid
Hydrostatic
VT-2
Moisture barrier
Liquid penetrant
ML20210U8114 August 1999SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a
BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With31 July 1999Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With
ML20210K98630 July 1999Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related MovsStroke time
ML20216D38412 July 1999Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function
M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function12 July 1999Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function
BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With30 June 1999Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With
BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With31 May 1999Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With
ML20209H74831 May 1999Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2
ML20207B64825 May 1999SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station
ML20195B25919 May 1999Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood StationsOffsite Dose Calculation Manual
Process Control Program
BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With30 April 1999Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With
BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With31 March 1999Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With
ML20205C51021 March 1999Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial CorrectionsUltimate heat sink
Offsite Circuit
ML20196A07216 March 1999Cycle 8 COLR in ITS Format & W(Z) FunctionShutdown Margin
ML20207J4378 March 1999ISI Outage Rept for A1R07Hydrostatic
VT-2
Liquid penetrant
Scaffolding
ML20204H9943 March 1999Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear StationsSafe Shutdown
Boric Acid
High Radiation Area
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Earthquake
Control of Heavy Loads
Fuel cladding
Liquid penetrant
Overexposure
Affidavit
Depleted uranium
BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With28 February 1999Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With
ML20206U90115 February 1999COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not IncludedShutdown Margin
BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With31 January 1999Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With
ML20205M70631 December 1998Unicom Corp 1998 Summary Annual Rept. with
BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With31 December 1998Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With
ML20206B40031 December 1998Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations
ML20206U90817 December 1998Cycle 8 COLR in ITS Format & W(Z) FunctionShutdown Margin
BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With30 November 1998Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With
ML20196A41919 November 1998Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB
ML20195D35631 October 1998Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With
ML20155B67126 October 1998Safety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program PlanBoric Acid
High Radiation Area
Non-Destructive Examination
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Incorporated by reference
Scaffolding
ML20207H7675 October 1998Rv Weld Chemistry & Initial Rt Ndt
ML20154D4402 October 1998Safety Evaluation Authorizing Second 10-yr Interval ISI Program Request for Relief 12R-30 for Plant,Units 1 & 2Boric Acid
VT-2
Scaffolding
ML20155C26030 September 1998Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2Coast down
ML20195F59111 September 1998Special Rept:On 980812,addl Unseated Wires Were Discovered. Cause Is Unknown at Present Time.Util Evaluated Number of Unseated/Ineffective Wires & Determined Effect on Containment Structural Integrity.Commitments,Encl
ML20196B3718 September 1998Cycle 8 Operating Limits Rept (Olr)
ML20151X66731 August 1998Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.WithCoast down
ML20238F32831 August 1998SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2
ML20237E23321 August 1998Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical ReptOffsite Dose Calculation Manual
Process Control Program
Fire Protection Program
ML20237A10931 July 1998Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2
ML20236N70030 June 1998Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2
ML20198A01518 June 199810CFR50.59 Summary Rept 960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & FP Rept.Without Fp,ReptHot Short
Safe Shutdown
Unanalyzed Condition
Boric Acid
High winds
Shutdown Margin
High Radiation Area
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Tornado Missile
Post Accident Monitoring
Coatings
Design basis earthquake
Foreign Material Exclusion
Annual Radiological Environmental Operating Report
Earthquake
Deep Dose Equivalent
Through-Wall Leakage
Fire Protection Program
Fire Watch
Scaffolding
Operability Assessment
Unidentified leakage
Unidentified leak
ML20249A54531 May 1998Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2
ML20247F7718 May 1998Special Rept:On 980403 & 980503 Seismic Monitoring Sys Was Declared Inoperable.Caused by 5-volt Power Supply & Regulator Card Failure.Imd & Sys Engineering Are Continuing to Identify & Resolve Problems So Sys Can Be Operable
ML20247L75930 April 1998Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2
ML20217K63320 April 1998Safety Evaluation Accepting Methodology & Criteria Used in Generating Flaw Evaluation Charts for RPV of Braidwood IAW Section XI of ASME Code
ML20216C66231 March 1998Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2