Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217G996 | 14 October 1999 | SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & | VT-2 Incorporated by reference |
BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With | |
ML20217P635 | 29 September 1999 | Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212A744 | 10 September 1999 | Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety | Hydrostatic VT-2 Incorporated by reference Finite Element Analysis Liquid penetrant |
BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With | |
ML20210R642 | 13 August 1999 | ISI Outage Rept for A2R07 | Boric Acid Hydrostatic VT-2 Moisture barrier Liquid penetrant |
ML20210U811 | 4 August 1999 | SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a | |
BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With | |
ML20210K986 | 30 July 1999 | Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs | Stroke time |
ML20216D384 | 12 July 1999 | Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | |
M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | 12 July 1999 | Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | |
BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With | 30 June 1999 | Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With | |
BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With | 31 May 1999 | Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With | |
ML20209H748 | 31 May 1999 | Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 | |
ML20207B648 | 25 May 1999 | SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station | |
ML20195B259 | 19 May 1999 | Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations | Offsite Dose Calculation Manual Process Control Program |
BW990021, Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Braidwood Station, Units 1 & 2.With | |
BW990016, Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Braidwood Generating Station,Units 1 & 2.With | |
ML20205C510 | 21 March 1999 | Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections | Ultimate heat sink Offsite Circuit |
ML20196A072 | 16 March 1999 | Cycle 8 COLR in ITS Format & W(Z) Function | Shutdown Margin |
ML20207J437 | 8 March 1999 | ISI Outage Rept for A1R07 | Hydrostatic VT-2 Liquid penetrant Scaffolding |
ML20204H994 | 3 March 1999 | Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Boric Acid High Radiation Area Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Overexposure Affidavit Depleted uranium |
BW990010, Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Braidwood Generating Station,Units 1 & 2.With | |
ML20206U901 | 15 February 1999 | COLR for Braidwood Unit 2 Cycle 7. Page 1 0f 13 of Incoming Submittal Was Not Included | Shutdown Margin |
BW990004, Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With | 31 January 1999 | Monthly Operating Repts for Jan 1999 for Braidwood Generating Station,Units 1 & 2.With | |
ML20205M706 | 31 December 1998 | Unicom Corp 1998 Summary Annual Rept. with | |
BW990001, Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Braidwood Generating Station,Units 1 & 2.With | |
ML20206B400 | 31 December 1998 | Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations | |
ML20206U908 | 17 December 1998 | Cycle 8 COLR in ITS Format & W(Z) Function | Shutdown Margin |
BW980076, Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Braidwood Generating Station,Units 1 & 2.With | |
ML20196A419 | 19 November 1998 | Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB | |
ML20195D356 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Braidwood Generating Station,Units 1 & 2.With | |
ML20155B671 | 26 October 1998 | Safety Evaluation Accepting Requests for Relief Associated with Second 10-yr Interval ISI Program Plan | Boric Acid High Radiation Area Non-Destructive Examination Hydrostatic Coatings Nondestructive Examination VT-2 Incorporated by reference Scaffolding |
ML20207H767 | 5 October 1998 | Rv Weld Chemistry & Initial Rt Ndt | |
ML20154D440 | 2 October 1998 | Safety Evaluation Authorizing Second 10-yr Interval ISI Program Request for Relief 12R-30 for Plant,Units 1 & 2 | Boric Acid VT-2 Scaffolding |
ML20155C260 | 30 September 1998 | Monthly Operating Repts for Sept 1998 for Braidwood Generating Station,Units 1 & 2 | Coast down |
ML20195F591 | 11 September 1998 | Special Rept:On 980812,addl Unseated Wires Were Discovered. Cause Is Unknown at Present Time.Util Evaluated Number of Unseated/Ineffective Wires & Determined Effect on Containment Structural Integrity.Commitments,Encl | |
ML20196B371 | 8 September 1998 | Cycle 8 Operating Limits Rept (Olr) | |
ML20151X667 | 31 August 1998 | Monthly Operating Repts for Aug 1998 for Braidwood Generating Station,Units 1 & 2.With | Coast down |
ML20238F328 | 31 August 1998 | SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2 | |
ML20237E233 | 21 August 1998 | Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept | Offsite Dose Calculation Manual Process Control Program Fire Protection Program |
ML20237A109 | 31 July 1998 | Monthly Operating Repts for July 1998 for Braidwood Generating Station,Unit 1 & 2 | |
ML20236N700 | 30 June 1998 | Monthly Operating Repts for June 1998 for Braidwood Generating Station,Units 1 & 2 | |
ML20198A015 | 18 June 1998 | 10CFR50.59 Summary Rept 960619 Through 980618, Vols I & Ii,Consisting of Descriptions & SE Summaries for Changes to Procedural UFSAR Changes,Tests & Experiments & FP Rept.Without Fp,Rept | Hot Short Safe Shutdown Unanalyzed Condition Boric Acid High winds Shutdown Margin High Radiation Area Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Tornado Missile Post Accident Monitoring Coatings Design basis earthquake Foreign Material Exclusion Annual Radiological Environmental Operating Report Earthquake Deep Dose Equivalent Through-Wall Leakage Fire Protection Program Fire Watch Scaffolding Operability Assessment Unidentified leakage Unidentified leak |
ML20249A545 | 31 May 1998 | Monthly Operating Repts for May 1998 for Braidwood Generating Station Units 1 & 2 | |
ML20247F771 | 8 May 1998 | Special Rept:On 980403 & 980503 Seismic Monitoring Sys Was Declared Inoperable.Caused by 5-volt Power Supply & Regulator Card Failure.Imd & Sys Engineering Are Continuing to Identify & Resolve Problems So Sys Can Be Operable | |
ML20247L759 | 30 April 1998 | Monthly Operating Repts for Apr 1998 for Braidwood Generating Station,Units 1 & 2 | |
ML20217K633 | 20 April 1998 | Safety Evaluation Accepting Methodology & Criteria Used in Generating Flaw Evaluation Charts for RPV of Braidwood IAW Section XI of ASME Code | |
ML20216C662 | 31 March 1998 | Monthly Operating Repts for Mar 1998 for Braidwood Generating Station,Units 1 & 2 |