ML20133E164

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1996 for Braidwood Nuclear Power Station,Unit 1 & 2
ML20133E164
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/31/1996
From: Eliakis T, Pershey C, Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BW-97-0001, BW-97-1, NUDOCS 9701100226
Download: ML20133E164 (10)


Text

-

.=.

.~

~

Osmmonwealth Edison Company liraidwtmd Generating Station t

Route ol, llox 8 6 l

Ilraceville, 11.60107 % I9 Tel H j 5-454280 l January 3,1997 BW/97-0001 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 1

Subject:

Monthly Operating Report for December,1996 Braidwood Nuclear Power Station, Units 1 and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Ladies and Gentlemen:

In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Conunonwealth Edison Company's (Comed's) Braidwood Nuclear Power Station, Units I and 2, covering the period December 1,1996 through December 31, 1996.

I Please address any conunents or questions regarding this matter to Chris Pershey at (815) 458-2801, extension 2173.

Very truly yours, A

J. ulon

,Sfation Manager Braidwood Nuclear Station TJT/CP/bl 0:'CORREsi'2CSTEC1f HW97-0001 Enclosures cc:

A. B. Beach, Regional Administrator - RIII

/

l R. R. Assa, Braidwood Project Manager - NRR

[h j

l C. J. Phillips, Senior Resident Inspector - Braidwood

/

T. J. Esper, IDNS Resident Inspector - Braidwood Office of Nuclear Facility Safety - IDNS 9701100226 961231 PDR ADOCK 05000456 R

PDR A l!nicom Compan)

s i

9

+

BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTliLY PERFORMANCE REPORT Comed NRC DOCKET NO. 050-456, LICENSE 'NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 l

i I

l A. OPERATING DATA REPORT Docket No: 50-456 Unit: Braidwood 1 Date: 01/03/1997 Completed by: Chris Pershey Telephone:. 815-458-2801 i

OPERATING STATUS

1) Reporting Period: December 1996 Gross Hours:

744

2) Currently Authorized Power Level (MWt):

3411 Design Electrical Rating (MWegross):

1175 Design Electrical Rating (MWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 Max Dependable Capacity (MWe-net):

1120

3) Power level to which restricted (if Any):

None

4) Reasons for restrictions (If Any):

None This Mo.

Yr to Date Cumulative

5) Report Period Hours:

744 8784 73857

6) Hours Reactor Critical:

691.4 7,047.5 58,025.4

7) RX Reserve Shutdown Hours:

0.0 0.0 0.0

8) Hours Generator on Line:

683.9 7,023.0 57,203.7

9) Unit Reserve Shutdown Hours:

0.0 0.0 0.0 10 Gross Thermal Energy (MWHt):

2,050,323 22,973,434 183,508,574 11 Gross Elect. Energy (MWH):

704,756 7,219,784 60,610,104 12 Net Elect. Energy (MWH):

674,827 6,934,041 58,061,401 13 Reactor Service Factor:

92.9 80.2 78.6 14 Reactor Availabihty Factor:

92.9 80.2 78.6 15 Unit Service Factor:

91.9 80.0 77.5 16 Unit Availability Factor:

91.9 80.0 77.5 17 Unit Capacity Factor (MDC NET):

81.0 70.5 70.2 18 Unit Capacity Factor (DER NET):

81.0 70.5 70.2 19 Unit Forced Outage Rate:

0.0 6.6 7.6 l

20 Unit Forced Outage Hours:

0.0 499.9 4,714.4 1

l 21 Shutdown Schedule Over Next 6 Months:

Refueling Outage 03/29/97 22 If Shutdown at End of Reporting Period, Estimated Date of Startup:

_...__.__.m I

B. AVERAGE DAILY UNIT NET POWER LEVEL LOG j

Docket No: 50 - 456 Urit: Braidwood 1 Dete; 01/03/1997 l

2 l

Completed by: Chris Pershey Telephone: 815-458-2801 j

MONTH: December 1996 h

i j

i Day MWe-net Qay MWe-net

)

1 1)

-15 16) 1117 j

2)

-15 17) 1131

  • i 3) 72 18) 1131
  • 4) 171 19) 1129
  • 5) 170 20) 1128
  • 6) 189 21) 1131
  • 7) 698 22) 1133 *

)

8) 1072 23) 1131

  • i 9) 1074 24) 1130 *

)

5 10)'

1075 25) 1131

  • 11) 1084 26) 1132
  • l 12) 1118 27) 1130
  • 13) 1119 28) 1132
  • 14) 1099 29) 1131
  • q 15) 1115 30) 1131
  • j 31) 1132
  • i j
  • Due to condenser efficiency i

i i

i~

i 1

i d

.... - _ -.~.. -

-, t I

C.

UNIT SHUTDOWNS / REDUCTIONS t

Docket No.:

50 - 456 i

Unit:

Braidwood 1 Date: 01/03/97 Completed by:

Chris Pershey Telephone:

815-458-2801 REPORT PERIOD:

December 1996 t

1 LER Cause & Corrective Action No..

Date Type Hours Reason Method Number System Component to Prevent Recurrence I

7 961201 S

60.1 B

4 N/A RC TBG Continuation of scheduled maintenance outage to allow

[

inspection of steam generator tubing.

i s

t t

SUMMARY

Unit 1 entered the month of December continuing a scheduled maintenance outage to inspect the steam generator tubing. The unit returned to s rvice December 3rd and operated routinely the remainder of the month.

i TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).

F - Administration G - Operator Error H - Other t

..m._..._...

k D.

SAFETY / RELIEF VALVE OPERATIONS Docket No.:

50 - 456 Unit:

Braidwood 1 I

Date: 01/03/97 Completed by:

Ted Eliakis Telephone:

815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None t

1 1-W 1

I s

t r

r k

I u

f i

I t

=

1 A. OPERATING DATA REPORT Docket No: 50 - 457 Unit: Braidwood 2 Date: 01/03/1997 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS i

1) Reporting Period: December 1996 Gross Hours:

744

2) Currently Authorized Power Level (MWt):

3411 Design Electrical Rating (MWe-gross):

1175 Design Electrical Rating (MWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 Max Dependable Capacity (MWe-net):

1120

3) Power level to which restricted (If Any):

None j

4) Reasons for restrictions (If Any):

None This Mo.

Yr to Date Cumulative

5) Report Period Mours:

744 8784 71939

6) Hours Reactor Critical:

744.0 7,367.7 60,789.1

7) RX Reserve Shutdown Hours:

0.0 0.0 0.0

8) Hours Generator on Line:

744.0 7,350.0 60,376.1

9) Unit Reserve Shutdown Hours:

0.0 0.0 0.0 10 Gross Thermal Energy (MWHt):

2,520,596.

24,385,659 195,248,096 11 Gross Elect. Energy (MWH):

865,696 8,324,484 64,230,271 12 Net Elect. Energy (MWH):

833,957 8,002,310 61,638,078 13 Reactor Service Factor:

100.0 83.9 84.5 14 Reactor Availability Factor:

100.0 83.9 84.5 15 Unit Service Factor:

100.0 83.7 83.9 16 Unit Availability Factor:

100.0 83.7 83.9 17 Unit Capacity Factor (MDC NET):

100.1 81.3 76.5 18 Unit Capacity Factor (DER NET):

100.1 81.3 76.5 19 Unit Forced Outage Rate:

0.0 0.0 4.7 20 Unit Forced Outage Hours:

0.0 0.0 2,947.6 21 Shutdown Schedule Over Next 6 Months:

22 If Shutdown at end of Reporting Period, Estimated Date of Startup:

j 1

1 B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457

[

Unit: Braidwood 2 Date: 01/03/1997 i

Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: December 1996 i

i Day MWe-net Qay MWe-net a

i 1) 1104 16) 1125

  • l 2) 1104 17) 1123
  • 3) 1111 18) 1122
  • j 4) 1118 19) 1122
  • 5) 1119 20) 1124
  • l 6) 1119 21) 1127
  • j 7) 1119 22) 1053 j

8) 1121

  • 23) 1126
  • 9) 1129
  • 24) 1122
  • j 10) 1127
  • 25) 1123
  • i 11) 1130
  • 26) 1126
  • j 12) 1131
  • 27) 1127
  • 13) 1131
  • 28) 1127
  • j 14) 1125
  • 29) 1126
  • 15) 1121
  • 30) 1126
  • j 31) 1124 *
  • Due to condenser efficiency J

1 1

i l

i 4

6 I

i n

r le ie t i t c c

eF n

e Ae h) r R

y1 er rS h 8 ivu o

E 2

e0 t c T

f yL d

s2 ce N

st r(

o r

erR E

nnt 7o 7e8 r

w9P5

/

t N

ioEo 5

r 4 d 3s4 on ap Ce O

ct e t

i0i a/r 5 0r1 h v

P uaR 5B0C8

&e M

rD 1

t t

r eP O

sf n

).

C Inoe1 s

v6 uo y e:

at

&noE1

: e:

t

.it 0

onabn C

Fie -

NUD do M

taeG t

eh E

i r sE te p

T ba c

i penR t

k l

e S

h e cU e

o ple t

Y xriN D

mT n

S EPL(

o e

C nop m

oC h

t no m

da a

m m

o m

r e

c ad L t

e Sr ed r

s i

l !

cu e y

t S

n DaaSnc e

uu otiu O nnt nd e

H aauoe h

t T MMACR ly E

M 1 234S e

n r

i t

e u

Rb o

Em r

Lu d

n o

N e

i t

t ar a

p i

e n

o m

a d

t x

d n

s E

o a

e h

y T

e e

t t

i r

e l

s M

i o

n b

t e

a n

c p

i ni a

n a

oL M

o c

i&

t a

e c

s r

igr e

0 l

t n u

si r

R 0

iat e nn 1

o ior Rair t

Fs 6

a rt t e y

nTgrTaE 9

s 6

r 9

r ort r S

1 u

9 e r nt oso 9

moiat N

r o

it lel a na r 1

e H

Npt O

b r

inu uri r e

e O uif gemeph IT m

b S

qaeepd t

C ec e

m A EMRROA OO U

e p

e E

D D

y c

RABCDEFGH E

T e

R D

/

f S

o N

D h

W O

e t

O I

t n

R a

o D

D m

E T

P U

e H

T h

t S

R O

e d

d n

Y e

e T

hN I

P o

R r

l e

u N

E A

t d

d U

R M

n e e e

c M

rh 2

U Eoc S

i P FS t

n Y

C U

TFS

i

(!i t'

1 2

0 s8 d

i2 o

k 7o 7a8 9i 5 w/

l 5 t

4 d 3E4 n

i0 e

d5 v

a/e1 0

r1 E

5B0T8 fo

. t: e: :

n

.it ye o

onabn i

t NUD do p

i t

eh r

e p

c t

k lpl e

e e s

co e

D mT D

oC no t i t ni adn lPoC epn yo Tit

&au

.t o c N A S

N O

I T

A d

R se E

et P

v au O

lat Vc E

A VLA V

FE L

I E

R

/

Y T

E F

e e

t n

A a

o S

D N

.D