Gimmonwecith blium Osmpany Ilr id anni Generatmg Station 0
Routr al, lkan k s liramille, IL 6n 607%19 TriHi 01 % JHot November 3,1997 IlW/97 0060 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Monthly Operating Report for October,1997 Braidwood Generating Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF 77 NRC Dockrtlios 50-456 and 50-457 Ladies and Gentlemen:
In accordance with Technical Specific.ition 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Generating Station, Units 1 and 2, covering the period October 1,1997 through October 31,1997.
Please address any conunents or questions regarding this matter to Don Ilildebrant at (815) 458-2801, extension 2173.
Very truly yours,
. Tulon
, tation Manager Braidwood Nuclear Station TJT/DCil!dah -
0 WRRF.SIV':STlCII>DW97 0053 lx K'
[$
y[W.,,+ -UU Enclosures l
cc:
A. B. Beach, Regional Administrator - Rlli R. R. Assa, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident inspector - Braidwood T. J Esper, IDNS Resident inspecto - Braidwood Office of Nuclear Facility Safety -IDNS 9711200242 971031 PDR ADOCK 05000456' lillillllll.llillllli.ll!Il.lEl.li a
eon _
l A l'nicom Company
cc:
INPO Records Center D. L. Farrar Nuclear Regional Smice Mgr.
D.J. Chrzanowski, Nuclear Licenslng Admin.
D. R. Eggett, Nuclear Engineering Dept.
li. O. Stanley, Site Vice President. Braidwood D. M. Iloots. Unit ! Operating Engineer J. P. Kuchenbecker, Unit 2 Operating Engineer J. M. Bunecicky, Westinghouse D. R Seavers, A.N.I.
S. P. Ibcht; American Nuclear insurers i.
r l
I i
l l
i I
s,
- -:9
.. : o-
_ - ~
,f 2
y.
BRAIDWOOD NUCLEAR GENERATING STATION 4-4
=>
g UNIT 1 AND UNIT 2-MONTHLY OPERATING REPORT-.
s l
Comed NRC DOCKET NOl050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77
, ~.
s LE 4
a t
i
. 5
.-w.
4.
' A. O,PERATING DATA REPORT '
Docket No: 50-456 Unit: Braidwood 1 -
Date: 11/03/97 Completed by: Don Hildebrant Telephone: 815-458-280lx2173 -
i REPORTING PERIOD: October 1997
- 1) Design Electrical Rating (Mwe Net) 1120
- 2) Maximum Dependable Capacity (Mwe Net) 1100 Month Year To Date Cumulative
- 3) Hours Reactor Critical (Hours) 744.0 -
5,912,7 63,9'"1.1
- 4) Hours Generator on Line (Hours) 744,0 5,874.7 63,078.4
- 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0
- 6) Net Electrical Energy.(Mwh) 874,237 6,440,286 64,501,687 a
b i
5 C.
UNIT SHUTDOWNS Do.ket No; 50 - 456 Unit Brai:iwood 1 Date: 11/03/97-Comp'eted by:
Don Hildebraat '
Telephone:
815-458-2801x2173 REPORT PERIOD:
Octobe.r 1997
.h Date Type Duration Reason Method Cause and Correctin Actions Hours and Conunents None l
t
- "S^JMMARY" Unit 1 entered the month at 100% capability and operated routinely for tt:e entire month.
TYPE REASON METHOD F - Forced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)
F - Administrative
. G - Operator Error (explain)
H - Other (explain) 1 t
+
e --
.:i'
- C. -
- SAFETY / REUEF VALVE OPERATIONS Docket No/ 456 i
Unit Braedwood 1-Date: 11/03/97.
Completed try-Don Hildebrant Telephone:
815-458-2801x2173 ~
Valves No. & Type P: ant Date.
Actuated Actuation Condition Descnotson of Event '
None r
+
r V
3 T
e t
w
' ~,
.e
9 '.
~
- A. OPERATING DATA REPORT ~
Docket No: 50-457
- Unit: Bra 4Nood 2 Date: - 11/03/97f-
-i Completed by: Don Hildebrant Telephone:. 815 458-280lx2173 i
REPORTING PERIOD: October 1997-i
- 1) Design Electrical Rating (Mwe Net).
1120
- 2) Maximum Dependable Capacity (Mwe Net) 1100 Month
- Year To Date Q.ggiulative
- 3) Hours Reactor Critical (Hours) 0.0 ~
6,455.0 67,244.1
- 4) Hours Generator on Line (Hours) 0.0.-
6,455.0 66,831,1
- 5) Unit Reserve Shutdown Hours (Hours) 0.0 0.0 0.0 -
= 6) Not Electrical Energy (Mwh) -
0.0 7,129,981 68,768,059 1
r p
4 w-wn s--
,s
, +,
-e
+,-'-w r
er
.a1-.
~v e
4 9
- D.
' UNIT SHUTDOWNS Docket No.:
50 - 457' Unit Braidwood 2' Date: 11/03/97 Completed by:
Don Heidebrant Telephone:
815-458-2801x2173 REPORT PERIOD:
October 1997 A
Date Type Duration Reason Method Cause and Corrective Actions Hours and Comments 1
970927 S
96 C
4 Scheduled sixth refueling outage continues
SUMMARY
Unit 2 entered the month continuing the sixth scheduled refueling outage and remained in this condition for the entire month.
- TYPE REASON METHOD F - F: rced A - Equipment Failure (explain) 1 - Manual S - Scheduled B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 - Automatic Trip / Scram D - Regulatory Restriction 4 - Continuation E - Operator Training / Licensee Examination 5 - Other (explain)
F - Administrativre G -Operator Error (explain)
H - Other (explain) 4
)
-w-w
l l
l 37 12 t x n1 a
2 r0 b8 d
e2 u7d To9li 5 8
t 5
w/
4 d3H4 ne i0n5 v
or1a/o1 E
tB1D8 fo n
- itte
- :
ye o
onabn i
t NUD p
d@o i
t e
r e
t c
k e
s c
lp!e e
oD mT D
=
oC no i
t t ni adn lPoC epn yo i
Tt&au
.t o c N A SN O
ITAR d
E se P
etv a O.
u lat F
Vc V
/
Y TEF e
e t
n A
a o
S D
N
.C l!