ML20097D417
ML20097D417 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 01/31/1996 |
From: | Pershey C, Tulon T COMMONWEALTH EDISON CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
BW-96-0017, BW-96-17, NUDOCS 9602120352 | |
Download: ML20097D417 (10) | |
Text
- Commonw calth litison Compan) liraidwood Generating 5tation Route al, Ilox H 6 l lira ( cs ille. II. 60107-9619 TclHibiSR2801 Febuary 7,1996 BW/96-0017 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D C. 20555-0001
Subject:
Monthly Operating Report for January 1996 Braidwood Nuclear Power Station, Units 1 and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Ladies and Gentlemen:
In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Nuclear Power Station, Units 1 and 2, covering the period January 1,1996 through January 31,1996.
Please address any comments or questions regarding this matter to Chris Pershey at (815) 458-2801, extension 2173.
Very truly yours,
/
J ,
- f. Tulon tation Manager l Braidwood Nuclear Station TJT/CP/dm OnCORREsFZCSTECilllW96-0017 l
Enclosures l cc: H. J. Miller, Regional Administrator - Rill R. R. Assa, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident luspector - Braidwood l J. L. Roman, IDNS Resident Inspector - Braidwood Office of Nuclear Facility Safety - IDNS i l
130024 1 9602120352 960131 j PDR R
ADOCK 05000456 PDR A p7 j -
A l'mcom Comp.m3
'i
\
l BRAIDWOOD NUCLEAR POWER STATION I
UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT ,
l Comed l
l NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 I
I i
I i
I i
l l
l A. OPERATING DATA REPORT Docket No: 50- 456 Unit: Braidwood 1 Date: 02/06/1996 )
Completed by: Chris Pershey ;
Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: January 1996 Gross Hours: 744
- 2) Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 Max Dependable Capacity (MWe-net): 1120
- 3) Power level to which restricted (If Any): None l
- 4) Reasons for restrictions (if Any): None This Mo. Yr to Date Cumulative
- 5) Report Period Hours: 744 744 65817
- 6) Hours Reactor Critical: 744.0 744.0 51721.9 j
- 7) RX Reserve Shutdown Hours: 0.0 0.0 0.0
- 8) Hours Generator on Line: 427.1 744.0 51218.9
- 9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 10 Gross Thermal Energy (MWHt): 2,507,423 2,507,423 163,499,661 i 11 Gross Elect. Energy (MWH): 876,281 876,281 54,266,601 l 12 Net Elect. Energy (MWH): 845,942 845,942 51,973,302 j 13 Reactor Service Factor: 100.0 100.0 78.6 l 14 Reactor Availability Factor: 100.0 100.0 78.6 15 Unit Service Factor: 57.4 100.0 77.8 16 Unit Availability Factor: 57.4 100.0 77.8 17 Unit Capacity Factor (MDC NET): 10l.5 101.5 70.5 18 Unit Capacity Factor (DER NET): 101.5 101.5 70.5 19 Unit Forced Outage Rate: 0.0 0.0 7.6 20 Unit Forced Outage Hours: 0.0 0.0 4214.5 21 Shutdown Schedule Over Next 6 Months: Mid-cycle outage - 05/21/1996 22 If Shutdown at End of Reporting Period, Estimated Date of Startup:
l l
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood i Date: 02/06/1996 )
Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: January 1996 ,
Ray MWe-nel Qay a MWe-net
- 1) 1091 16) 1136 *
- 2) 1105 17) 1136 *
- 3) 1143
- 18) 1133 *
- 4) 1143
- 19) 1143 *
- 5) 1143
- 20) 1146
- l
- 6) 1142
- 21) 1147
- I
- 7) 1141
- 22) 1148 *
- 8) 1069 23) 1148 *
- 9) 1136
- 24) 1147 * ;
- 10) 1136
- 25) 1148
- l
- 11) 1136
- 26) 1143
- I
- 12) 1136
- 27) 1146 *
- 13) 1136
- 28) 1146 *
- 14) 1136
- 29) 1146 *
- 15) 1136
- 30) 1146 *
- 31) 1145
- l
- Due to condenser efficiency i
C. UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50-456 Unit: Braidwood 1 Date: 02/06/96 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: January 1996 LER Cause & Corrective Action h Date Type Hours Reason Method Number System Component to Prevent Recurrence None
SUMMARY
Unit 1 entered the month of January 1996 with 100% capability and operated routinely the entire month.
TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H - Other
l D. SAFETY /REllEF VALVE OPERATIONS Docket No.: 50-456 Unit: Braidwood 1 Date: 02/06/96 Completed by: John Lewis Telephone: 815-458-2801 I
Valves No. & Type Fiant Date Actuated Actuation Condition Description of Event None I
I t
+
f b
i
. _ _ . _ _ _ _ . - - - - _ - _ _ _ _ . _ _ _ _ - _ - . _ - _ _ --- --_-___- ---- _ __- -- __---__-__-_-_._ _ - _ - - - . ~ -
a 0 0*
A. OPERATING DATA REPORT Docket No: 50 - 457 Unit: Braidwood 2 Date: 02/06/1996 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: January 1996 Gross Hours: 744
- 2) Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 Max Dependable Capacity (MWe-net): 1120
- 3) Power level to which restricted (if Any): None l
- 4) Reasons for restrictions (If Any): None '
This Mo. Yr to Date Cumulative l
- 5) Report Period Hours: 744 744 63899 I
- 6) Hours Reactor Critical: 744.0 744.0 54165.4
- 7) RX Reserve Shutdown Hours: 0.0 0.0 0.0
- 8) Hours Generator on Line: 744.0 744.0 53770.1 1
- 9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 10 Gross Thermal Energy (MWHt): 2519358 2519358 173380557 11 Gross Elect. Energy (MWH): 869184 869184 56774971 12 Net Elect. Energy (MWH): 839165 839165 54474933 13 Reactor Service Factor: 100.0 100.0 84.8 14 Reactor Availability Factor: 100.0 100.0 84.8 15 Unit Service Factor: 100.0 100.0 84.1 16 Unit Availability Factor: 100.0 100.0 84.1 17 Unit Capacity Factor (MDC NET): 100.7 100.7 76.1 18 Unit Capacity Factor (DER NET): 100.7 100.7 76.1 19 Ur.9 Forced Outage Rate: 0.0 0.0 5.2 20 Unit Forced Outage Hours: 0.0 0.0 2947.6 21 Shutdown Schedule Over Next 6 Months: Refuel Outage - 03/16/1996 22 If Shutdown at end of Reporting Period, Estimated Date of Startup:
j
. e B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50- 457 Unit: Braldwood 2 ;
Date: 02/06/1996 !
Completed by: Chris Pershey Telephone:- 815-458-2801 MONTH: January 1996 Qaj MWe-net Day MWe-net l
- 1) 1106 16) 1132 *
- 2) 1132
- 17) 1132 *
- 3) 1134
- 18) 1127
- l
- 4) 1134
- 19) 1124 *
- 5) 1134
- 20) 1127 *
- 6) 1133
- 21) 1127 *
- 7) 1132
- 22) 1131 *
- 8) 1130
- 23) 1132 *
- 9) 1132
- 24) 1132 *
- 10) 1133
- 25) 1134 *
- 11) 1132
- 26) 1134 *
- 12) 1133
- 27) 1119
- 13) 1132
- 28) 1054 ;
- 14) 1132
- 29) 1128 *
- 15) 1133
- 30) 1128
- I
- 31) 1129 *
- Due to condenser efficiency I
i
C. UNIT SHUTDOWNSIREDUCTIONG Docket No.: 50-457 Unit: Braidwood 2 Date: 02/06/96 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: January 1996 LER Cause & Corrective Action NA Dr.te Type Hours Reason Method Number System Component to Prevent Recurrence None
SUMMARY
Unit 2 entered the month of Jaauary 1996 at 100% capability and opertted routinely the entire month.
t TYPE REASON METHOD SYSTEM & COMPONENT !
F - Forced A - Equipment Fai!ure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Prt;;aration of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161). '
F - Administration G - Operator Error H - Other 1
I
, p.
D. SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50 -457 Unit: Braidwood 2 Date: 02/06/96 Completed by: John Lewis Telephone: 815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event k
None I
r
)
l t