.. _.
BRAIDWOOD NUCLEAR POWER STATION UNIT I AND UNIT 2 i
I MONTHLY PERFORMANCE REPORT i
l i
Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 I
i 9603120100 960306 PDR ADOCK 05000456 R
A. OPERATING DATA REPORT Docket No: 50 - 456 Unit: Braidwood 1 Date: 03/06/1996 Completed by: Chris Pershey Telephone: 815-458-2801 1
OPERATING STATUS 4
- 1) Reporting Pe %. February 1996 Gross Hov7-696
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe net):
1120 I
- 3) Powerlevel to which restricted (if Any):
None l
- 4) Reasons for restrictions (if Any):
None
]
This Mo.
Yr to Date Cumulative i
- 5) Report Period Hours:
696 1440 66513
- 6) Hours Reactor Critical:
696.0 1440.0 52417.9 4
- 7) RX Reserve Shutdown Hours:
0.0 0.0 0.0 4
- 8) Hours Generator on Line:
696.0 1440.0 51620.7
- 9) Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10 Gross Thermal Energy (MWHt):
2,356,506 4,863,929 165,705,252 11 Gross Elect. Energy (MWH):
'822,720 1,699,001 55,089,321 4
12 Net Elect. Energy (MWH):
793,812 1,639,754 52,767,114 13 Reactor Service Factor:
100.0 100.0 78.8 14 Reactor Availability Factor:
100.0 100.0 78.8 15 Unit Service Factor-100.0 100.0 77.6 16 Unit Availability Factor:
100.0 100.0 77.6 17 Unit Capacity Factor (MDC NET):
101.8 101.7 70.8 18 Unit Capacity Factor (DER NET):
101.8 101.7 70.8 19 Unit Forced Outage Rate:
0.0 0.0 7.5 20 Unit Forced Outage Hours:
0.0 0.0 4214.5 21 Shutdown Schedule Over Next 6 Months: Mid-cycle outage - 05/21/1996 22 If Shutdown at End of Reporting Period, Estimated Date of Startup:
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood 1 Date: 03/06/1996 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: February 1996 l
Day MWe-net Day MWe-net 1) 1145
- 16) 1147
- 2) 1145
- 17) 1147
- 3) 1076 18) 1147
- 4) 1140
- 19) 1147
- 5) 1142
- 20) 1147
- 6) 1142
- 21) 1147
- 7) 1142
- 22) 1147
- 8) 1143
- 23) 1146
- 9) 1144
- 24) 1147
- 10) 1136
- 25) 1069 11) 1144
- 26) 1146
- 12) 1146
- 27) 1144
- 13) 1147
- 28) 1145
- 14) 1148
- 29) 1147
- 15) 1147
- 1
- Due to condenser efficiency i
1
i 0
i C.
UNIT SHUTDOWNS / REDUCTIONS Docket No.:
50 - 456 Unit:
Braidwood 1 Date: 03/06/96 Completed by:
Chris Pershey Telephone:
815-458-2801 i
REPORT PERIOD:
February 1996 LER Cause & Corrective Action
[
h Date Type Hours Reason Method Number System Component to Prevent Recurrence None i
i.
l t
I
SUMMARY
t Unit 1 entered the month of February 1996 with 100% capability and operated routinely the entire month.
f TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure M aint or Test 1 - Manual j
S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for i
C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restrictioa 4 - Continued Licensee Event Report (LER) File E - Operator Training A Licesisee Examination 5 - Reduced Load (NUREG-0161).
[
F - Administration G - Operator Error H - Other m
m
D.
SAFETY / RELIEF VALVE OPERATIONS Docket No.:
50 - 456 Unit:
Braidwood 1 Date: 03/06/96 Completed by:
John Lewis Telephone:
815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition
_ Description of Event None l
l
e A. OPERATING DATA REPORT Docket No: 50-457 Unit: Braidwood 2 Date: 03/06/1996 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS i
- 1) Reporting Period: February 1996 Gross Hours:
696
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120
- 3) Power level to which restricted (If Any):
None
- 4) Reasons for restrictions (If Any):
None This Mo.
Yr to Date Cumulative
- 5) Report Period Hours:
696 1440 64595
- 6) Hours Reactor Critical:
696.0 1440.0 54861.4
- 7) RX Reserve Shutdown Hours:
0.0 0.0 0.0
- 8) Hours Generator on Line:
696.0 1440.0 54466.1
- 9) Unit Reserve Shutdown Hours:
0.0 0.0 0.0 10 Gross Thermal Energy (MWHt):
2338534 4857892 175538267 11 Gross Elect. Energy (MWH):
808524 1677708 57583495 12 Net Elect. Energy (MWH):
779915 1619080 55254848 13 Reactor Service Factor:
100.0 100.0 84.9 14 Reactor Availability Factor:
100.0 100.0 84.9 15 Unit Service Factor:
100.0 100.0 84.3 16 Unit Availability Factor:
100.0 100.0 84.3 17 Unit Capacity Factor (MDC NE",):
100.1 100.4 76.4 18 Unit Capacity Factor (DER VdT):
100.1 100.4 76.4 19 Unit Forced Outage Rate:
0.0 0.0 5.1 20 Unit Forced Outage Hours:
0.0 0.0 2947.6 21 Shutdown Schedule Over Next 6 Months: Refuel Outage - 03/16/1996 22 If Shutdown at end of Reporting Period, Estimated Date of Startup:
I l
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457 Unit: Braidwood 2 Date: 03/06/1996 Completed by: Chris Pershey Telephone: 815-458-2301 MONTH: February 1996 Qay MWe-net Qay M)LV.e_-D_et e
1) 1131
- 16) 1132
- 2) 1134
- 17) 1132
- 3) 1133
- 18) 1132
- 4) 1132
- 19) 1132
- 5) 1133
- 20) 1131
- 6) 1128
- 21) 1131
- 7) 1132
- 22) 1132
- 8) 1133
- 23) 1129
- 9) 1133
- 24) 1129
- 10) 1122
- 25) 1130
- 11) 928
-26) 1129
- 12) 1131
- 27) 1103 13) 1132
- 28) 1088 14) 1133
- 29) 1085 15) 1132 *
- Due to condenser efficiency w
C.
UNIT SHUTDOWNS / REDUCTIONS Docket No.:
50-457 Unit:
Braidwood 2 Date: 03/06/96 Completed by:
Chris Pershey Telephone:
815-458-2801 REPORT PERIOD:
February 1996 LER Cause & Corrective Action h
Date Type Hours Reason Method Number System Component to Prevent Recurrence None
'*^
SUMMARY
Unit 2 entered the month of February 1996 at 100% capability and operated routinely up to February 25th when coastdown was entered.
- TYPF, REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manuai Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H - Other
- =
I 3
D.
SAFETY / RELIEF VALVE OPERATIONS Docket No.:
50 - 457 Unit:
Braidwood 2 s
Date: 03/06/96 Completed by:
John Lewis Telephone:
815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None
.