BRAIDWOOD NUCLEAR POWER STATION UNIT I AND UNIT 2 i
I MONTHLY PERFORMANCE REPORT i
l l
i l Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 I
i 9603120100 960306 PDR ADOCK 05000456 R PDR
i l
- l A. OPERATING DATA REPORT Docket No: 50 - 456 Unit: Braidwood 1 Date: 03/06/1996 Completed by: Chris Pershey Telephone: 815-458-2801 1 OPERATING STATUS 4
- 1) Reporting Pe %. February 1996 Gross Hov7- 696
- 2) Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross): 1175 l Design Electrical Rating (MWe-net): 1120
- Max Dependable Capacity (MWe-gross)
- 1175 Max Dependable Capacity (MWe net): 1120 l
. I l
- 3) Powerlevel to which restricted (if Any)
- None l
- 4) Reasons for restrictions (if Any): None !
]
This Mo. Yr to Date Cumulative i
- 5) Report Period Hours: 696 1440 66513
- 6) Hours Reactor Critical:
4 696.0 1440.0 52417.9 4
- 7) RX Reserve Shutdown Hours: 0.0 0.0 0.0
- 8) Hours Generator on Line: 696.0 1440.0 51620.7
- 9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 l 10 Gross Thermal Energy (MWHt): 2,356,506 4,863,929 165,705,252 l 11 Gross Elect. Energy (MWH): '822,720 1,699,001 55,089,321 4 12 Net Elect. Energy (MWH): 793,812 1,639,754 52,767,114 13 Reactor Service Factor: 100.0 100.0 78.8 ,
14 Reactor Availability Factor: 100.0 100.0 78.8 15 Unit Service Factor-
{
100.0 100.0 77.6 16 Unit Availability Factor: 100.0 100.0 77.6 17 Unit Capacity Factor (MDC NET): 101.8 101.7 70.8 18 Unit Capacity Factor (DER NET): 101.8 101.7 70.8 19 Unit Forced Outage Rate: 0.0 0.0 7.5 20 Unit Forced Outage Hours: 0.0 0.0 4214.5 21 Shutdown Schedule Over Next 6 Months: Mid-cycle outage - 05/21/1996 22 If Shutdown at End of Reporting Period, Estimated Date of Startup:
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood 1 Date: 03/06/1996 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: February 1996 !
l Day MWe-net Day MWe-net
- 1) 1145
- 16) 1147 *
- 2) 1145
- 17) 1147 *
- 3) 1076 18) 1147 *
- 4) 1140
- 19) 1147 *
- 5) 1142
- 20) 1147 *
- 6) 1142
- 21) 1147 *
- 7) 1142
- 22) 1147 *
- 8) 1143
- 23) 1146 *
- 9) 1144
- 24) 1147 *
- 10) 1136
- 25) 1069
- 11) 1144
- 26) 1146 *
- 12) 1146
- 27) 1144 *
- 13) 1147
- 28) 1145 *
- 14) 1148
- 29) 1147 *
- 15) 1147
- l 1
l
- Due to condenser efficiency i
l 1
1 i
i 0
i C. UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 03/06/96 Completed by: Chris Pershey Telephone: 815-458-2801 i REPORT PERIOD: February 1996 LER Cause & Corrective Action h Date Type Hours Reason Method Number System Component to Prevent Recurrence None i i
l t
I !
SUMMARY
t Unit 1 entered the month of February 1996 with 100% capability and operated routinely the entire month.
TYPE REASON METHOD SYSTEM & COMPONENT j F - Forced A - Equipment Failure M aint or Test 1 - Manual ,
- S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for i C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restrictioa 4 - Continued Licensee Event Report (LER) File E - Operator Training A Licesisee Examination 5 - Reduced Load (NUREG-0161). [
F - Administration G - Operator Error H - Other '
_ _ _ _ . . _ _ . _ _ . _ . _ _ _ . _ _ . _ . _ _ _ _ _ . _ _ . _ _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ __________m .___ _ _ _ _ _ _ _ _ ______.___m__ _
D. SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50 - 456 Unit: Braidwood 1 ,
Date: 03/06/96 Completed by: John Lewis Telephone: 815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition _ Description of Event None l
l
l e l A. OPERATING DATA REPORT Docket No: 50-457 l Unit: Braidwood 2 Date: 03/06/1996 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS i
- 1) Reporting Period: February 1996 Gross Hours: 696 l
- 2) Currently Authorized Power Level (MWt): 3411 Design Electrical Rating (MWe-gross): 1175 l Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-gross): 1175 Max Dependable Capacity (MWe-net): 1120
- 3) Power level to which restricted (If Any): None
- 4) Reasons for restrictions (If Any): None This Mo. Yr to Date Cumulative
- 5) Report Period Hours: 696 1440 64595
- 6) Hours Reactor Critical: 696.0 1440.0 54861.4
- 7) RX Reserve Shutdown Hours: 0.0 0.0 0.0
- 8) Hours Generator on Line: 696.0 1440.0 54466.1
- 9) Unit Reserve Shutdown Hours: 0.0 0.0 0.0 10 Gross Thermal Energy (MWHt): 2338534 4857892 175538267 11 Gross Elect. Energy (MWH): 808524 1677708 57583495 12 Net Elect. Energy (MWH): 779915 1619080 55254848 13 Reactor Service Factor: 100.0 100.0 84.9 14 Reactor Availability Factor: 100.0 100.0 84.9 15 Unit Service Factor: 100.0 100.0 84.3 16 Unit Availability Factor: 100.0 100.0 84.3 17 Unit Capacity Factor (MDC NE",): 100.1 100.4 76.4 18 Unit Capacity Factor (DER VdT): 100.1 100.4 76.4 19 Unit Forced Outage Rate: 0.0 0.0 5.1 20 Unit Forced Outage Hours: 0.0 0.0 2947.6 21 Shutdown Schedule Over Next 6 Months: Refuel Outage - 03/16/1996 22 If Shutdown at end of Reporting Period, Estimated Date of Startup:
I l
l
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457 Unit: Braidwood 2 Date: 03/06/1996 Completed by: Chris Pershey Telephone: 815-458-2301 MONTH: February 1996 I
Qay MWe-net Qay e M)LV.e_-D_et l
- 1) 1131
- 16) 1132 *
- 2) 1134
- 17) 1132 *
- 3) 1133
- 18) 1132 *
- 4) 1132
- 19) 1132 *
- 5) 1133
- 20) 1131 *
- 6) 1128
- 21) 1131 *
- 7) 1132
- 22) 1132 *
- 8) 1133
- 23) 1129 *
- 9) 1133
- 24) 1129 *
- 10) 1122
- 25) 1130 *
- 11) 928 -26) 1129 *
- 12) 1131
- 27) 1103
- 13) 1132
- 28) 1088
- 14) 1133
- 29) 1085
- 15) 1132 * <
- Due to condenser efficiency w
C. UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50-457 Unit: Braidwood 2 ,
Date: 03/06/96 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: February 1996 LER Cause & Corrective Action h Date Type Hours Reason Method Number System Component to Prevent Recurrence None
'*^
SUMMARY
Unit 2 entered the month of February 1996 at 100% capability and operated routinely up to February 25th when coastdown was entered.
TYPF, REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manuai Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H - Other
_ _ _ _ - - _ - _ - ._ _ _- . - _ - - _ ._ -_- _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ - _ - _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ - = _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - _ _ _ - - _ _ _ _ _ _ _ _
I 3 D. SAFETY / RELIEF VALVE OPERATIONS Docket No.: 50 - 457 Unit: Braidwood 2 s Date: 03/06/96 Completed by: John Lewis Telephone: 815-458-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None
.__ _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ __ ____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _