r Commonwealth filiv>n Company Braidwmni Generating 5tation Route 01, ik)x M 4 liraces ille, 11. 60107 <Xil9
' Tel HI5458-2801 February 4,1997 BW/97-0006 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Monthly Operating Report for January,1997 Braidwood Nuclear Power Station, Units I and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Nos. 50-456 and 50-457 Ladies and Gentlemen:
In accordance with Technical Specification 6.9.1.8, enclosed you will find the Monthly Operating Report for Commonwealth Edison Company's (Comed's) Braidwood Nuclear Power Station, Units I and 2, covering the period January 1,1997 through January 31,1997.
Please address any comments or questions regarding this matter to Chris Pershey at (815) 458-2801, extension 2173.
Very truly yours,
. Tulon Station Manager Braidwood Nuclear Station TJT/CP/bl OTORREsP2CsTECll'BW97 0006 d\\
Enclosures I
cc:
A. B. Beach, Regional Administrator - RIII R. R. Assa, Braidwood Project Manager - NRR g
C. J. Phillips, Senior Resident Inspector - Braidwood P;
T. J. Esper, IDNS Resident Inspector - Braidwood Office of Nuclear Facility Safety - IDNS 9702140118 970131 PDR ADOCK 05000456 R
PDR-A linicom Company
I A
9 5
't BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT Comed NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77
)
i i
,y l
A. OPERATING DATA REPORT Docket No: 50-456 Unit Braidwood 1 Date: 02/04/1997 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
- 1) Reporting Period: January 1997 Gross Hours:
744
- 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 i
Max Dependable Capacity (MWe-net):
1120
]
- 3) Power level to which restricted (If Any):
None
- 4) Reasons for restrictions (11 Any):
None This Mo.
Yr to Date Cumulative
- 5) Report Period Hours:
744 744 74601
- 6) Hours Reactor Critical:
744.0 744.0 58,769.4
- 7) RX Reserve Shutdown Hours:
0.0 0.0 0.0
- 8) Hours Generator on Line:
744.0 744.0 57,947.7
- 9) Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 10) Gross Thermal Energy (MWHt):
2,509,198 2,509,198 186.017,772
- 11) Gross Elect. Energy (MWH):
873,647 873,647 61,483,751
- 12) Net Elect. Energy (MWH):
842,070 842,070 58,903,471
- 13) Reactor Service Factor:
100.0 100.0 78.8
- 14) Reactor Availability Factor 100.0 100.0 78.8
- 15) Unit Service Factor:
100.0 100.0 77.7
- 18) Unit Availability Factor 100.0 100.0 77.7
- 17) Unit Capacity Factor (MDC NET):
101.1 101.1 70.5
- 18) Unit Capacity Factor (DER NET):
101.1 101.1 70.5
- 19) Unit Forced Outage Rate:
0.0 0.0 7.5
- 20) Unit Forced Outage Hours:
00 0.0 4,714.4
- 21) Shutdown Schedule Over Next 6 Months:
Refueling Outage 03/29/97
- 22) If Shutdown at End of Reporting Period, Estimated Date of Startup:
I
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50-456 Unit: Braidwood 1 Date: 02/04/1997 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: January 1997 Qay MWe net Qay MWe-net 1) 1131
- 16) 1141
- 2)
'1130
- 17) 1141
- 3) 1124
- 18) 1141
- 4) 1131
- 19) 1140
- 5) 1026 20) 1142
- 6) 1128
- 21) 1142
- 7) 1130
- 22) 1142
- 8) 1130
- 23) 1141
- 9) 1129
- 24) 1140
- 10) 1129
- 25) 1141 *
'11).
1129
- 26) 1141
- 12) 1131
- 27) 1142
- 13) 1134
- 28) 1139
- 14) 1135
- 29) 1128
- 15) 1136
- 30) 1128
- 31) 1129*
- Due to condenser emeiency
~
C.
UNIT SHUTDOWNS / REDUCTIONS Docket No.:
50 -456 Unit:
Braidwood 1 Date: 02/04/97 Completed by:
Chris Pershey Telephone:
815-458-2801 REPORT PERIOD:
January 1997 LER Cause & Corrective Action h
Date Type Hours Reason Method Numb _er System Component to Prevent Recurrence None
SUMMARY
Unit 1 entered the month of January 1997 at 100% capability and operated routinely the entire month.
TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error H - Other
D.
SAFETY / RELIEF VALVE OPERATIONS Docket No.:
50 - 456 Unit Braidwood 1 Date: 02/04/97 Completed by:
Ted Eliakis Telephone:
815-458-2801 s
Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None k
(
P L
h i
i t
i
---...u
- - - - _ _ _ - - - - - - - - - - _ - - _ _ _ - - - - - _ - - - - ~, - _ - - - - -
A.
OPERATING DATA REPORT Docket No: 50-457 l
Unit: Braidwood 2 l
Date: 02/04/1997 Completed by: Chris Pershey l
Telephone: 815-458-2801 l
OPERATING STATUS
- 1) Reporting Period: January 1997 Gross Hours:
744 i
- 2) Currently Authorized Power Level (MWt):
3411 j
Design Electrical Rating (MWe-gross):
1175
{
Design Electrical Rating (MWe-net):
1120 I
Max Dependable Capacity (MWe-gross):
1175 i
Max Dependable Capacity (MWe-net):
1120
{
- 3) Power level to which restricted (If Any):
None
- 4) Reasons for restrictions (If Any):
None i
This Mo.
Yr to Date Cumulative
- 5) Report Period Hours:
744 744 72683
- 6) Hours Reactor Critical:
744.0 744.0 61,533.1
- 7) RX Reserve Shutdown Hours:
0.0 0.0 0.0
- 8) Hours Generator on Line:
744.0 744.0 61,120.1
- 9) Unit Reserve Shutdown Hours:
0.0 0.0 0.0
- 10) Gross Thermal Energy (MWHt):
2,527,817 2,527,817 197,775,913
- 11) Gross Elect. Energy (MWH):
868,343 868,343 65,098,614
- 12) Net Elect. Energy (MWH):
839,454 839,454 62,477,532
- 13) Reactor Service Factor:
100.0 100.0 84.7
- 14) Reactor Availability Fac for 100.0 100.0 84.7
- 15) Unit Service Factor:
100.0 100.0 84.1
- 16) Unit Availability Factor, 100.0 100.0 84.1
- 17) Unit Capacity Factor (MDC NET):
100.7 100.7 76.7
- 18) Unit Capacity Factor (DER NET):
100.7 100.7 76.7
- 19) Unit Forced Outage Rate:
0.0 0.0 4.6
- 20) Unit Forced Outage Hours:
0.0 0.0 2.947.6
- 21) Shutdown Schedule Over Next 6 Months:
- 22) If Shutdown at end of Reporting Period, Estimated Date of Startup:
. _ - _ _ _. _... _. ~. _
__._ _.=.__
m__
l
)
B. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50- 457 Unit: Braidwood 2 j
Date: 02/04/1997 1
i Completed by: Chris Pershey j
Telephone: 815-458-2801 MONTH: January 1997 j
Ray MWe-net DE MWe-net a
I 1) 1124
- 16) 1131
- 2) 1126
- 17) 1131
- 3) 1125
- 18) 1130 *
(
4) 1125
- 19) 1060 5) 1126
- 20) 1133
- 6) 1131
- 21) 1131
- 7) 1131
- 22) 1132
- 8) 1131
- 23) 1132
- 9) 1130
- 24) 1132
- 10) 1131
- 25) 1132
- 11) 1131
- 26) 1132
- 12) 1131
- 27) 1131
- 13) 1132
- 28) 1130
- 14) 1131
- 29) 1130
- 15) 1130
- 30) 1131
- 31) 1130*
- Due to condenser efficiency i
C.
UNIT SHUTDOWNS / REDUCTIONS Docket No.:
50-457 Unit Braidwood 2 Date: 02/04/97 i
Completed by:
Chris Pershey Telephone:
815-458-2801 REPORT PERIOD:
January 1997 LER Cacae & Corrective Action h
Date Type Hours Reason Method Number System Component to Prevent Recurrence l
None l
i I
i
SUMMARY
i Unit 2 entered the month of January 1997 at 100% capability and operated routinely the entire month.
i TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER) File E - Operator Training & Licensee Examination 5 - Reduced Load (NUREG-0161).
F - Administration G - Operator Error -
H - Other
4 D.
SAFETY / RELIEF VALVE OPERATIONS Docket No.:
50 -457 Unit Braidwood 2 Date: 02/04/97 Completed by:
Ted Eliakis Telephone:
8154 58-2801 Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None
.