  • CW!an Firt Post o!!a Bn U3 fu:um. M m so(L 5l November 4,1994 4

Union Euscnac 53 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-3093

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNil 1 FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT OCTOBEIL 1994 The enclosed Monthly Operating Report for October,1994 is submitted pursuant to section 6.9.1.8 of the Callaway Unit i Technical Specifications, dU -

J. D. Blosser A Manager, Callaway Plant

/ g }v "f \

JDB/ NEB /JAhifrAM/ M/ctd i

I Enclosure cc: Distribution attached ll l

,4 n ,~,

w. b
  • f 9411180098 941031 /

PDR ADOCK 05000483 R PDR

'\

4 cc distribution for ULNRC-3093 with tnclosurej Mr. M J. Farber, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Conunission Region 111 l 801 Warremille Road ,

Lisle, IL 60532-4351 Mr. L. R. Wharton ,

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission -

1 White Flint, North, Mail Stop 13E21 1155 Roclaille, MD 20852 NRC Resident Inspector B

Manager, Electric Department ,

Missouri Public Senice Commission  ;

P.O. Box 360 JefTerson City, MO 65102 j e

F

-< g.

4 DOCKET NO. 50-483 I UNIT NAME CALLAWAY UNIT 1-DATE 11/7/94 COMPLETED BY J. B. McInvale TELEPilONE 314/676-8247 I

PART A OPERATIONS

SUMMARY

The plant operated at approximately 100% power for the month of October with the following exception:

Power was reduced to 93% briefly for Main Turbine valve testing on 10-01-94.

PARTB PORV AND SAFETY VALVE

SUMMARY

Nonc i

Page1of4  !

r

PART C 1 AVERAGE DAILY UNIT POWER LEVEL

. DOCKET NO 50-483 i

UNIT Callaway Unit 1 DATE 11/7/94 l ,

COMPLETED BY J. B. McInvale l TELEPilONE 314/676-8247 I MONTil: OCTOBER 1994 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER L.EVEL f)AAY (MWe-Nc0 DAY (MWe-Net) 4 l

1 1120 17 1146 2 1142 18 1147 3 1145 19 1150 4 1153 20 1154 5 1153 21 1151 6 1140 22 1149 7 1139 23 1158 i

8 1157 24 1155 9 1160 25 1161 i 10 1161 26 1165 11 1161 27 1162 12 1157 28 1158 )

13 1155 29 1158 14 1143 30 1158 15 1151 31 1162 16 1148 I

i 1

1 Page 2 of 4

~

PART D OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT 1 DATE 11/7/94 -

COMPLETED BY J. B. McInvale  !

TELEPIiONE 314/676-8247 OPERATING STATUS (YTD) (CUM)

1. R1 PORTING PERIOD: OCTO!!ER 1994 GROSS IlOURS IN RFPORTING PERIOD: 745 7296 86,461.5 2 CURRENTL.Y AtJFilORIZED POWTR LEVEL,(MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1115  ;

DESIGN ELECTRICAL RATING (MWe-Net): 1171

3. POWER LE\TL TO WillCII RESTRICTED (IF ANY)(MWe-Net)-
4. REASONS FOR RESTRICTION (IF ANY):

TIIIS MONTil YR TO DATE CUMI'IATIVE

5. NUMllER OF liOURS REACI'OR WAS CRITICAL..._ 745 7296 76,242.7
6. REACTOR RESERVE SIIUTDOWN liOURS... 0 0 0
7. IlOURS GENERATOR ON LINF 745 7,262.7 74,817.8 ,

8, UNIT RESERVE SlitrFDOWN llOl'RS . 0 0 0

9. GROSS TitERMAL ENERGY GENERATED (MWil)... 2.636.(22 25,511,748 252,376,836
10. GROSS E!.ECIRlCAL ENERGY GENERATED (MWil).. 898,986 8,700,531 86,071,654 f t
11. NET Ell CTRICAL ENERGY GENERATED (MWil) 838,353 8.305,430 81,869,481 12 REACTOR SERVICE FACTOR... .. .. . . _ . 100 0 100.0 88.2 13 REACTOR AVAIL.All!LJTY FACTOR. . . . . . - . 100.0 100.0 88.2
14. UNIT SERVICE FACTOR . . . _ . . . 100 0 99.5 86.5
15. UNIT AVAILAI4!LITY FACTOR .. . . . _ . . . 100.0 99.5 86.5
16. l' NIT CAPACITY FACTOR (Using MDC)....-.... _.- 103 3 102.1 84.9
17. UNIT CAPACITY FACTOR (Using Design MWe)... .. 98.4 97 2 80.9 18 UNIT I ORCED OLTAGE RATE . . . . . . _ . . 0.0 0.0 2.29 19 SiitJi1X)WNS SCIILDUI.ED OVER NEXT 6 MONTilS (1TPE, DATE AND DURATION OF EACli): Refuelmg Date: 3:'25.95 1.eurataw 56 days 20 IF Sliti DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP: N'A Page 3 of 4

~ r PART E UNIT SIIUTDOWNS AND POWER REDtTTIONS - * "

DOCKET Na 50-483 1 (3IT NAhlE CALLAWAY L%IT 1 DATE IIT94 COMPLETED BY J B.htcInvale TE11PIIONE 314 676-8247 REPORT MONTil OCTOBER 1994 AIET110D OF I

TYPE SIILTTINO DOWN '

F: FORCED DURATION TIIE REACTOR OR t NQ DATE S. SCIIEDULED flIOURS) REASON REIXCING POWER CORRF CTIVE' ACTIONS COMMENTS

SUMMARY

REASON METIIOD A; EQUIPMENT FAIIERE(EXPLAIN) 1: ilAN11AL B. MAINT. OR TEST 2: MANUALSCRAM C: REllTLINO 3: AUTOMATIC SCRAM 0 :. REGULATORY RESTRICTION 4: OT1IER(EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION i O. OPERATIONAL ERROR (EXPLAIN)

II: OT1IER(EXPl AIN) i l

l i

l l

l l

l l

Page 4 of 4 I

t - , . . _

_ ._ _ _ _ _ , .. . . ._ . - . , . . . . . _ _ . , ._.