Monthly Operating Rept for March 1997 for Callaway Plant.W/
ML20137T297
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/31/1997
From: Affolter R, Holmes M
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3560, NUDOCS 9704160062
Download: ML20137T297 (6)


Text

Calliway Plant Post Offace Box 620

,+

futton. Missouri 65251

~ ' '

- EuS75E

'3 April 9,- 1997 d

r-U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-0001 ULNRC-3560 Gentlemen:

DOCKET NUMHER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 b10NTilLY OPERATING REPORT M ARCII 1997 The enclosed Monthly Operating Report for March 1997 is submitted putsuant to Section 6.9.1,8 of the Callaway Unit 1 Technical Specifications.

S 07C R. D. Affolter Manager, Callaway Plant RDA/ Mall /rjp

& closure i

970416o062 970331 ADOCK0500g3 DR-15018o' appupppppp5

ULNRC-3516 January 8,1997 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 i

Senior Resident inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 l

Ms. Kristine M. Thomas (2 copies)

Licensing Project Manager, Callaway Plant 0111ce of Nuclear Reactor Regulation l

U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 1

Manager, Electric Department Missouri Public Service Commission PO 13ox 360 j

Jefferson City, MO 65102 Mr. Thomas A.13axter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Washington, DC 20037

g.

~

.);

a

a.

DOCKET NO.:

50483-H UNIT NAME:

CALLAWAY UNIT 1

~

DATE:..

4/9/97

' COMPLETED BY:

.M. A. IIolmes

TELEPilONE:

573/676-8842

. FAX:

573/676-8562 s

4 PART A-OPERATIONS

SUMMARY

The plant operated at approximately 100% for the month of March with the following exception:

.]

On 3/II/97/at 0600 power was briefly reduced to 98% for instrument calibration.

1 PART B. PORV AND SAFETY VALVE

SUMMARY

None.-

]

Page1of4

I f

I 9

PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-483 UNIT:

Callaway Unit 1 DATE:

4/9/97 COMPLETED BY:

M. A. IIolmes TELEPIlONE:

573/676-8842 FAX:

573/676-8562 MONTH: MARCH 1997 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net)

DAY (MWe-Net) 1 1.164 17 1.169 2

1.174 18 1.169 3

1.171 19 1.173 i

4 1.169 20 1.168 5

1.173 21 1.161 4-6 1.173 22 1.173 7

1.170 23 1.172

't 8

1.171 24 1.167 9

1.166 25 1.173 10 1.166 26 1.171 i

11 1.150 27 1.167 l

f 12 1.163 28 1.167 13 1.162 29 1.172 14 1.174 30 1.171 15

!.179 31 1.170 16 1.176 i

i I

i

[

Page 2 of 4

}

- -... _ ~ _

i y

,, f

~,

PART D OPERATING DATA REPORT DOCKET NO.:

50-483

}

UNIT NAME:

CALLAWAY UNIT 1 DATE:

4/9/97 COMPLETED BY:

M. A. Holmes TELEPHONE:

573/676-8842'

-i I

FAX:

573/676-8562 I

OPERATING STATUS:

l (MAR)

(YTD)

. (CUM) '

i 1.

REPORTING PERIOD:

GROSS llOURS IN REPORTING PERIOD:

744 2,160 107,629.5 j

'2 CURRENTLY AUTiiORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125

~ DESIGN ELECTRICAL RATING (MWe-Net): 1171 j

i 3.

POWER LEVEL TO.WillCil RESTRICTED (IF ANY)(MWe-Net): 100 % '

4.

REASONS FOR RESTRICTION (IF ANY):

'l THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF FLOURS REACTOR WAS CRITICAL 744 2,160 95,236.9 6.

REACTOR RESERVE SIfUTDOWN ilOURS 0

0 0

f 1

. 7, IIOURS GENERATOR ON-LINE 744 2,160 93,665.4 8.

UNIT RESERVE SilVTDOWN HOURS 0

0 0

9.

GROSS TilERMAL ENERGY GENERATED 2,647,771 7,588,532 317,960,339 (MWil)

)

10.

GROSS ELECT RICAL ENERGY GENERATED 909,122 2,612,414 108,471,330 j

f

. (MWil)

)

i 1, NET ELECTRICAL ENERGY GENERATED 869,815 2,498,364 103,212,113 (MWil) 12.

REACTOR SERVICE FACTOR 100.0 100.0 88.5 I

13.

REACTOR AVAILABILITY FACTOR 100.0 100.0 88.5 i

14.

UNIT SERVICE FACTOR 100.0 100.0 87.0 1

[

15 UNIT AVAILABILITY FACTOR 100.0 100.0 87.0

)

4 16.~

UNIT CAPACITY FACTOR (Using MDC) 103.9 102.8 85.2 17.

UNIT CAPACITY FACTOR (Using Design MWe) 99.8 -

98.8 81.9 18.

UNIT FORCED OUTAGE RATE 0.0 0.0 2.26

19. SilUTDOWNS SCilEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACil):.

' Refueling Date:

Duration:

20. IF SilUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4 i

~.

t PART E '

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNC.i 50-483 UNITNAME.

CALLAWAY UNIT I DATE:

4/9/97 COMPLETED BY:

M. A. IIolmes TELEPHONE:

573/676-8842 FAX:

573/676-8562 REPORT MONTH: MARCH 1997 METHOD OF

' TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO.

DATE S: SCHEDULED 010URS)

REASON REDUCING POWER ' ACTIONS / COMMENTS

SUMMARY

REASON METHOD A: EQUIPMENTFAILURE(EXPLAIN) 1: MANUAL B. MAINT.OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER (EXPLAIN)

. E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN)

II: OTilER(EXPLAIN)

Page 4 of 4

. ~

-.