Calliway Plant Post Offace Box 620
,+
futton. Missouri 65251
~ ' '
- EuS75E
'3 April 9,- 1997 d
r-U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-0001 ULNRC-3560 Gentlemen:
DOCKET NUMHER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 b10NTilLY OPERATING REPORT M ARCII 1997 The enclosed Monthly Operating Report for March 1997 is submitted putsuant to Section 6.9.1,8 of the Callaway Unit 1 Technical Specifications.
S 07C R. D. Affolter Manager, Callaway Plant RDA/ Mall /rjp
& closure i
970416o062 970331 ADOCK0500g3 DR-15018o' appupppppp5
ULNRC-3516 January 8,1997 Page 2 cc: Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 i
Senior Resident inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 l
Ms. Kristine M. Thomas (2 copies)
Licensing Project Manager, Callaway Plant 0111ce of Nuclear Reactor Regulation l
U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 1
Manager, Electric Department Missouri Public Service Commission PO 13ox 360 j
Jefferson City, MO 65102 Mr. Thomas A.13axter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.
Washington, DC 20037
g.
~
.);
a
- a.
DOCKET NO.:
50483-H UNIT NAME:
CALLAWAY UNIT 1
~
DATE:..
4/9/97
' COMPLETED BY:
.M. A. IIolmes
TELEPilONE:
573/676-8842
. FAX:
573/676-8562 s
4 PART A-OPERATIONS
SUMMARY
The plant operated at approximately 100% for the month of March with the following exception:
.]
On 3/II/97/at 0600 power was briefly reduced to 98% for instrument calibration.
1 PART B. PORV AND SAFETY VALVE
SUMMARY
None.-
]
Page1of4
I f
I 9
PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-483 UNIT:
Callaway Unit 1 DATE:
4/9/97 COMPLETED BY:
M. A. IIolmes TELEPIlONE:
573/676-8842 FAX:
573/676-8562 MONTH: MARCH 1997 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 1.164 17 1.169 2
1.174 18 1.169 3
1.171 19 1.173 i
4 1.169 20 1.168 5
1.173 21 1.161 4-6 1.173 22 1.173 7
1.170 23 1.172
't 8
1.171 24 1.167 9
1.166 25 1.173 10 1.166 26 1.171 i
11 1.150 27 1.167 l
f 12 1.163 28 1.167 13 1.162 29 1.172 14 1.174 30 1.171 15
!.179 31 1.170 16 1.176 i
i I
i
[
Page 2 of 4
}
- -... _ ~ _
i y
,, f
~,
PART D OPERATING DATA REPORT DOCKET NO.:
50-483
}
UNIT NAME:
CALLAWAY UNIT 1 DATE:
4/9/97 COMPLETED BY:
M. A. Holmes TELEPHONE:
573/676-8842'
-i I
FAX:
573/676-8562 I
OPERATING STATUS:
l (MAR)
(YTD)
. (CUM) '
i 1.
REPORTING PERIOD:
GROSS llOURS IN REPORTING PERIOD:
744 2,160 107,629.5 j
'2 CURRENTLY AUTiiORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125
~ DESIGN ELECTRICAL RATING (MWe-Net): 1171 j
i 3.
POWER LEVEL TO.WillCil RESTRICTED (IF ANY)(MWe-Net): 100 % '
4.
REASONS FOR RESTRICTION (IF ANY):
'l THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF FLOURS REACTOR WAS CRITICAL 744 2,160 95,236.9 6.
REACTOR RESERVE SIfUTDOWN ilOURS 0
0 0
f 1
. 7, IIOURS GENERATOR ON-LINE 744 2,160 93,665.4 8.
UNIT RESERVE SilVTDOWN HOURS 0
0 0
9.
GROSS TilERMAL ENERGY GENERATED 2,647,771 7,588,532 317,960,339 (MWil)
)
10.
GROSS ELECT RICAL ENERGY GENERATED 909,122 2,612,414 108,471,330 j
f
. (MWil)
)
i 1, NET ELECTRICAL ENERGY GENERATED 869,815 2,498,364 103,212,113 (MWil) 12.
REACTOR SERVICE FACTOR 100.0 100.0 88.5 I
13.
REACTOR AVAILABILITY FACTOR 100.0 100.0 88.5 i
14.
UNIT SERVICE FACTOR 100.0 100.0 87.0 1
[
15 UNIT AVAILABILITY FACTOR 100.0 100.0 87.0
)
4 16.~
UNIT CAPACITY FACTOR (Using MDC) 103.9 102.8 85.2 17.
UNIT CAPACITY FACTOR (Using Design MWe) 99.8 -
98.8 81.9 18.
UNIT FORCED OUTAGE RATE 0.0 0.0 2.26
- 19. SilUTDOWNS SCilEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACil):.
' Refueling Date:
Duration:
- 20. IF SilUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:
Page 3 of 4 i
~.
t PART E '
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNC.i 50-483 UNITNAME.
CALLAWAY UNIT I DATE:
4/9/97 COMPLETED BY:
M. A. IIolmes TELEPHONE:
573/676-8842 FAX:
573/676-8562 REPORT MONTH: MARCH 1997 METHOD OF
' TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO.
DATE S: SCHEDULED 010URS)
REASON REDUCING POWER ' ACTIONS / COMMENTS
SUMMARY
REASON METHOD A: EQUIPMENTFAILURE(EXPLAIN) 1: MANUAL B. MAINT.OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER (EXPLAIN)
. E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN)
II: OTilER(EXPLAIN)