Callassy Plant Post O!!,ce Box 620 fviton. M.ssoun 65251 Union Euicnuc
$3 September 5,1996 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop Pl-137 Washington, DC 20555-0001 ULNRC-3432 Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTIILY OPERATING REPORT AUGUST 1996 The enclosed Monthly Operating Report for August 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
M~
R. D.
ffolter Manager, Callaway Plant RDA/MAH/Imv Enclosure I'
TeZY
- sR"!MS US$33 R
ULNRC-3432 September 5,1996 Page 2 cc: Mr. L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman,MO 65077 Ms. Kristine M. Thomas (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.
Washington,DC 20037 I
...n,
f ULNRC-3432 September 5,1996 4
Page 3 bec: Institute of Nuclear Power Operations Records Center Suite 100 i
700 Galleria Parkway l
Atlanta, GA 30339-5957 Dottie Sherrnan American Nuclear Insurers j
29 S. Main Street j
J West Hartford, CT 06107 Mr. T. M. Handlan Westinghouse Electric Corp.
I1601 Lilburn Park Road St. Louis, MO 63146 Mr. Fred Yost Director of Research Utility Data Institute 1700 K. Street Northwest Suite 400 Washington DC 20006 D. F. Schnell (400)
G. L. Randolph J. V. Laux/G. A. Hughes A. C. Passwater/D. E. Shafer (470)
M. P. Barrett (100)
P. L. Reynolds (470) NSRB R. J. Irwin (470)
M. E. Taylor H. D. Bono E210.0001 A160.0761 RDA Chrono Manager, Plant Support Wolf Creek Nuclear Operating Corporation PO Box 411 Burlington, KS 66839
l DOCKET NO.:
50-483 i
UNIT NAME:
CALLAWAY UNIT 1 i
DATE:
9/5/96 COMPLETED BY:
M. A,11olmes TELEPilONE:
573/676-8842 FAX:
573/676-8562 PART A - OPERATIONS
SUMMARY
The plant operated at approximately 100 % for the entire month of August except for a brief power reduction to 94%, occurring on 8/31/96, due to full stroke testing on the turbine control valve, l
PART H-PORY AND SAFETY VALVE
SUMMARY
None.
i i
e i
i f
l a
I s
3-1 Page 1 of 4
PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-483 UNIT:
Callaway Unit I DATE:
9/5/96 COMPLETED BY:
M. A. liolmes TELEPflONE:
573/676-8842 FAX:
573/676-8562 MONTil: AUGUST 1996 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net) day (MWe-Net)
I 1.152 17
,,,4 9 2
f.149 gg 1.145 3
1,i44 j9 l l39 4
!.139 20 1.138 5
1,130 21 1.133 6
1.131 22 1.137 7
1.134 23 1.142 8
1.144 24 1.146 9
1.142 25 1.151 10 1.142 26 1,144 II 1.151 27 1,147 12 1,149 28 1,1 p 13 l,l47 29 1,1 g 14 1.145 30 1.151 15 1.143 31 y,y47 16 1.146 Page 2 of 4
e PART D OPERATING DATA REPORT DOCKET NO.:
50-483 UNIT NAME:
CALLAWAY UNIT I DATE:
9/5/96 COMPLETED BY:
M. A Ilolmes TELEPilONE:
573/676-8842 FA'X:
573/676-8562 OPERATING STATUS:
(AUG)
(YTD)
(CUM) 1.
REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
744 5,855.0 102,540.5 2 CURRENTLY AUTi!ORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171 3.
POWER LEVEL TO WillCil RESTRICTED (IF ANY)(MWe-Net): 100 %
4.
REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF IIOURS REACTOR WAS CRITICAL 744.0 5,828.0 90,953.5 6.
REACTOR RESERVE SHUTDOWN llOURS 0
0 0
7.
HOURS GENERATOR ON-LINE 744 0 5,802.7 89,444.1 8.
UNIT RESERVE SHUTDOWN llOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED (MWH 2,648,019 20,411,683 303,370,401 10.
GROSS ELECTRICAL ENERGY GENERATED 891,934 6,941,907 103,462,761 (MWH) APRIL VALUE CORRECTION 827,812 11.
NET ELECTRICAL ENERGY GENERATED 850,786 6,623,360 98,446,732 (MWH) 12.
REACTOR SERVICE FACTOR 100.0 99.5 88.7 13.
REACTOR AVAILABILITY FACTOR 100.0 99.5 88.7 14.
UNIT SERVICE FACTOR 100.0 99.1 87.2 15.
UNIT AVAILABILITY FACTOR 100.0 99.1 87.2 16.
UNIT CAPACITY FACTOR (Using MDC) 101.6 100.6 85.3 17.
UNIT CAPACITY FACTOR (Using Design MWe) 97.7 96.6 82.0 18.
UNIT FORCED OUTAGE RATE 0.0 0.65 2.24
- 19. SHUTDOWNS SCllEDULED OVER NEXT 6 MONTlis (TYPE, DATE, AND DURATION OF EACil):
Refueling Date: 10/12/96 Duration: 42 days
- 20. IF SilUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:
Page 3 of 4
PART E UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-483 UNIT NAME:
CALLAWAY UNIT 1 DATE:
9/5/96 COMPLETED BY:
M. A. llotmes TELEPIIONE:
573/676-8842 FAX:
573/676-8562 REPORT MONTil: AUGUST 1996 METiiOD OF TYPE SIIUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO.
DATE S: SCIIEDULED (ilOURSj REASON REDUCING POWER ACTIONS / COMMENTS l
l
SUMMARY
REASON METIIOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B. MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER(EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN) 11: OTHER(EXPLAIN) i Page 4 of 4 I
.