Monthly Operating Rept for Oct 1997 for Callaway,Unit 1
ML20199B406
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/31/1997
From: Affolter R, Holmes M
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3677, NUDOCS 9711180311
Download: ML20199B406 (6)


Text

_ _

C#i::*aet riert

',+ < *.,

rest on,ce &a cro ra m. v w,csrst Eu? sri?

'i3 Ne vember 10,1997 U. S. Nuclear Regulatory Commission Attn Document Control Desk hbl Stop PI 137 Washington, DC 20555 0001 ULNRC 3677 Gentlemen:

I)OCKET NUMHER 50 483 CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTill,Y OPERATING REPORT OCTOHER 1997 The enclosed Monthly Operating Report for October 1997 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

$k

/

R.1. AITolter Manager, Callaway Plant RDA/ Mall Enclosure f@Y M"ME Mb8%s; Ig MR,iqityi eon -

I

\\

UI,NRC-3677 November 10,1997 Page 2 l

cc: Mr. lillis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400

}

Arlington, TX 76011 8064 Senior Resident inspector l

Callaway Resident OfUce l

U.S. Nuclear Regulatory Commission 8201 NRC Road i

Steedman,MO 65077 Mr. Ilarry C Westreich (2 copies)

Acting Licensing Project Manager, Callaway Plant-OfEcc of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager,lilectric Department Missouri Public Service Commission PO Ilox 360 4

Jefferson City, MO 65102 Mr. Thomas A.11axter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Washington, DC 20037 1

1 I

Li,

.m--,,-

IInclosure UI.NitC-3677 Nqvember 10,1997 8

DOCK!!T NO.:

50-483 UNIT NAMP.:

CALLAWA Y UNIT I COMi'll!TIID llY:

M. A. Iloirnes Tlill:PilONii:

$73/676-F,842 FAX:

573'676 4334

)

PART A Ol'I: RATIONS StiMM4}in On 7/10/97, at 1600, rower was reduced to 94.5% due to an axial offset anomaly. On 8/19/97, at 0900, power was reduced o.er 2 days from 94.5% to 70.5% due to the axial offset anomaly.1hc plant operated at approximately 70% for the entire month of October to ensure adequate shutdown margin.

l' ART 11-I'ORY AND SATI:TY VAINI: Sif MMARY:

None.

Page1of4

linclosurc ULNRC.3677 Noyember 10,1917 PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-483 UNIT:

Callaway Unit 1 COMPLETED llY:

M, A,llotmes TELEPilONE:

573/o76-8842 FAX:

573/676-4334 MONTil OCTOBER 1997 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL

~

LEVEL j})AX f MWe-Net)

M (MWe-Net)

-1 795 17 810 2

787 18 812 3

783 19 806 4

78$

20 8l1 5

789 21 814 6

788 22 815 7

788 23 800 8

786 24 807 9

794 25 800 10 797 26 847 11 788 27 815 12 789 28 812 13 806 29 808 14 810 30 805 15 809 31 800

-16 810 Page 2 of 4

..t Enclosure ULNitC 3677 November 10,1997 PART D

[JJ'FR ATING DATA RFPORT DOCKET NO.:

50-483 UNIT NAME:

CALLAWAY UNIT 1 COMPLETED llY:

M. A. llotmes TELEPilONE:

57.,/676 8842 FAX:

573/676-4334 OPERATING S1 ATUS:

(OCT)

(YTD)

(CUM) 1.

R1LPORTING PERIOD:

GROSS llOURS IN REPORTING PERIOD:

744 7,295.0 112.764.5 2 CURRENTLY AUTilORIZED POWER LEVEL (MWI): 3565 MAX, DEPEND. CAPACITY (MWe Net): 1125 DESIGN ELECTRICAL RATING (MWe Net): il71 J

POWER LEVEL TO WillCil RESTRICTED (IF ANY)(MWe Net): 100 %

4.

REASONS FOR RESTRICTION (IF ANY):

Tills MONTil YR TO D ATE CUMULATIVE 5.

NUMllER OF llOURS REACTOR WAS CRITICAL 744 7,295.0 100,371.9 6,

REACTOR RESERVE SilUTDOWN llOURS 0

0 0

7.

IlOURS GENERATOR ON LINE 744 7,295.0 98,800.4 8.

UNIT RESERVE SilUTDOWN llOURS 0

0 0

9 GROSS TilERMAL ENERGY GENERATED 1,855,609 23,766,249 334,138,056 (MWil) 10.

GROSS ELECTRICAL ENERGY GENERATED 633,635 8,112,926 113,971,842 (MWil) i 1.

NET ELECTRICAL ENERGY GENERATED 597,293 7,746,614 108,460,363 (MWil) 12.

REACTOR SERVICE I ACTOR 100.0 100.0 89.0 13.

Rr. ACTOR AVAILAulL11Y FACTOR 100.0 100.0 89.0 14.

UNIT SERVICE FACTOR 100.0 100.0 87.6 15.

UNIT AVAILAlllLITY FACTOR 100.0 100.0 87.6 16.

UNIT CAPACITY FACTOR (Using MDC) 71.4 94.4 85.5 17.

UNIT CAPACITY FACTOR (Using Design MWe) 68.6 90.7 82.1 18.

UNIF FORCED OUTAGE RATE 0.0 0.0 2.15

19. SIIUTDOWNS SCilEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACll):

Refueling Date:

Duration:

20. IF SilUT IX)WN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4

Enclosure.

ULNRC-3677 Novec6er 10,1997 PART E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-483 UNIT NAME-CALIAWAY UNTT I COMPLETED BY:

hl A.IIolmes TELEPHONE:

573167M842 FAX:

573/676-4334 REPORT MONTH: OCTOBER 1997 METHOD OF TYPE SHUTTING DOHW j

F: FORCED DURATION THE REACTOR OR CORRECTIVE NO.

-DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER ACTIONSCOMMENTS 3

971001 F

0 H

I See Summary below.

SUMMARY

3. The plant operated at approximately 70* L foi the entire month of October due to an axial oliset anomaly.

REASON METHOD A: EQUIPMENTFAILURE(EXPLAIN) 1: MAhTAL B. MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: A TOMATIC SCRAM D: FEGULATORY RESTRICTION 4: O.. IR (EXPLAIN)

E-OPE"_*.iOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN)

II: OT11ER(EXPLAIN)

Page 4 of 4