Monthly Operating Rept for Mar 1996 for Callaway Plant Unit 1
ML20101R058
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/31/1996
From: Affolter R, Holmes M
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3361, NUDOCS 9604160029
Download: ML20101R058 (6)


Text

1 CanawatPlant s . Post Office Box 620

'* Fulton, M:ssouri 65251 i

Union Eucnue

$3 April 9,1996 Document Control Desk Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop Pl-137 Washington,DC 20555 ULNRC-3361 l Gentlemen:

DOCKET NUMHER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT  ;

MARCII 1996 '

The enclosed Monthly Operating Report for March 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

W~ l R. D. ffolter l Manager, Callaway Plant I

l RDA/MAH/tdf I Enclosure l

150113 1

9604160029 960331 ki i PDR ADOCK 05000483 f 1 R PDR l i I

l ,

.-

  • ULNRC-3361

- April 9,~ 1996

! Page 2 I l

r cc: Mr. L. J. Callan l Regional Administrator l U.S. Nuclear Regulatory Commission l Region IV l 611 Ryan Plaza Drive, Suite 400 l

Arlington, TX 76011-8064 l NRC Resident Inspector Ms. Kristine M. Thomas Licensing Project Manager, Callaway Plant l Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission l Mail Stop 13-E-21 l Washington, DC 20555 l

j Manager, Electric Department i Missouri Public Service Commission l PO Box 360 l Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Washington,DC 20037 l

l l

l I

l 4

1 1

i

- DOCKET NO.
50-483 i UNIT NAME: CALLAWAY UNIT 1 i DATE: 4/9/96 COMPLETED BY: M. A. Holmes l TELEPHONE: 314/676-8842 j FAX: 314/676-8562 l

! PART A - OPERATIONS

SUMMARY

The plant operated at approximately 100 % for the entire month of March.

PART B- PORV AND SAFETY VALVE

SUMMARY

! None.

i i

l 1

l l l l l

l - . .

i l

t i

l. l l

I Page1of4

m . . _ _ __ -_.. ._

l PART C AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO: 50483

, UNIT: Callaway Unit 1 l DATE: 4/9/96 COMPLETED BY: M. A. Holmes TELEPilONE: 314/676-8842

! FAX: 314/676-8562 MONTH FEBRUARY 1996 l

l AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Neo DAY (MWe-Nen l 1 1.175 17 1.163 2 1.169 18 1.166 3 1.170 19 1.169 l 4 1.163 20 1.168 5 1.155 21 1.169

)

6 1.169 22 1.169 7 1.163 23 1.166 8 1.169 24 1.155 l 9 1.I67 25 1.170 1

10 1.I66 26 1.171 l

11 1.164 27 1.171 12 1.159 28 1.171 l

13 1.156 29 1.169 14 1.156 30 1.166 15 1.161 31 1.166 16 1.155 1

Page 2 of 4

~~

- PART D~ ~~

_ . _ . _ _ _ _ . . .- . - ~

l QPERATING DATA REPORT l

. . ' DOCKET NO.: 50-483 l .-

UNIT NAME: CALLAWAY UNIT 1 DATE: 4/9/96 COMPLETED BY: M. A. Holmes l TELEPHONE: 314/676-8842 l-FAX: 314/676-8562 l

OPERATING STATUS:

l (MAR) (YTD) (CUM) i

1. REPORTING PERIOD: j GROSS llOURS IN REPORTING PERIOD: 744 2,184 98,869.5 i i

2 CURRENTLY AUTIIORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY l l (MWe-Net): 1125  ;

l DESIGN ELECTRICAL RATING (MWe-Net): 1171 l l 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): 100 %

4. REASONS FOR RESTRICTION (IF ANY):

l THIS MONTH YR TO DATE CUMULATIVE S. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,184.0 87,309.5 l

6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON-LINE 744.0 2,165.0 85,806.4
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED (MWH 2,649,287 7,633,068 290,591,786
10. GROSS ELECTRICAL ENERGY GENERATED 907,650 2,615,503 99,136,357 (MWH) i1. NET ELECTRICAL ENERGY GENERATED 866,986 2,498,498 94,321,870

( (MWH) l 12. REACTOR SERVICE FACTOR 100 100 88.3 l

13. REACTOR AVAILABILITY FACTOR 100 100 88.3 l
14. UNIT SERVICE FACTOR 100 99.1 86.8
15. UNIT AVAILABILITY FACTOR 100 99.1 86.8
16. UNIT CAPACITY FACTOR (Using MDC) 103.6 101.7 84.8
17. UNIT CAPACITY FACTOR (Using Design MWe) 99.5 97.7 81.5
18. UNIT FORCED OUTAGE RATE O .87 2.31
19. SilUTDOWNS SCHEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACll):

Refueling Date: 10/05/96 Duration: 42 days l' 20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

l Page 3 of 4 l

l l

l

s J

s -

PART E UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I DATE: 4/9/96 COMPLETED BY: M. A. Holmes TELEPHONE: 314/676-8842 FAX: 314/676-8562 REPORT MONTH: MARCH 1996 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE N(h DATE S: SCIIEDULED (HOURS) REASON REDUCING POWER ACTIONS / COMMENTS

SUMMARY

t-REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B. MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER(EXPLAIN)

Page 4 of 4