Cutlaway Plant Fast Office Bcs 620 fulton. Vnoun 65251 Union Etucrmc 8'3 August 6,1996 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-0001 ULNRC-3411 Gentlemen:

DOCKET NUMHER 50-483 CALLAWAY PLANT UNIT I FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT JULY 1996 The enclosed Monthly Operating Report for July 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

R. D. Affolter Manager, Callaway Plant RDA/MAH/tdf Enclosure Ik khokk OI Mdy 3

R

O,

'ULNRC-3411 August 6,1996 Page 2 cc: Mr. L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office l

U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman,MO 65077 Ms. Kristine M. Thomas (2 copies)

Licensing Project Manager, Callaway Plant Ollice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 i

Manager, Electric Department Missouri Pihlic Service Commission -

l PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Washington,DC 20037 i

i

e e

. DOCKET NO.:

50-483 UNIT NAME:

CALLAWAY UNIT 1 DATE:

8/6/96 COMPLETED BY:

M. A,llotmes TELEPliONE:

573/676-8842 FAX:

573/676-8562 PART A -OPERATIONS

SUMMARY

The plant operated at approximately 100 % for the entire month of July except for a brief power reduction to 96%, occurring on 7/13/96, due to instrument surveillances.

PART B-PORY AND SAFETY VALVE

SUMMARY

None.

Page1 of4

PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50 483 UNIT:

Callaway Unit 1 1

DATE:

8/6/96 j

COMPLETED BY:

M. A. llolmes TELEPIIONE:

573/676-8842 i

FAX:

573/676-8562 i

MONTH JULY 1996 l

AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL i

DAY (MWe-Net)

DAY (MWe-Net) i 1

1.132 17 1.131 l

2 1.117 18 1.125 i

3 1.lf 19 1.128

.i 4

1.152 20 1.142 5

1.149 21 1.143 6

1.134 22 1.147 i

7 1.111 23 1.145 8

1.144 24 1.143 9

1.152 25 1.150 10 1.157 26 1.152 11 1.152 27 1.154 12 1.148 28 1.145 13 1.134 29 I.143 14 1.120 30 1.145 15 1.145 31 1.152 16 1.140 i

i i

Page 2 of 4

]

PART D OPERATING DATA REPORT DOCKET NO.:

50-483 UNIT NAME:

CALLAWAY UNIT 1 DATE:

8/6/96 COMPLETED BY:

M. A. Ilolmes l

TELEPilONE:

573/676-8842 FAX:

573/676-8562 OPERATING STATUS:

(JUL)

(YTD)

(CUM) 1, REPORTING PERIOD:

GROSS liOURS IN REPORTING PERIOD:

744 5,111.0 101,796.5 2 CURRENTLY AUTilORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171 l

3.

POWER LEVEL TO WillC11 RESTRICTED (IF ANY)(MWe-Net): 100 %

4.

REASONS FOR RESTR.lCTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF llOURS REACTOR WAS CRITICAL 744.0 5,084.0 90,209.5 6.

REACTOR RESERVE SliUTDOWN llOURS 0

0 0

7.

IlOURS GENERATOR ON-LINE 744.0 5,058.7 88,700.1 8.

UNIT RESERVE S11UTDOWN 110URS 0

0 0

9.

GROSS TilERMAL ENERGY GENERATED (MWil 2,641,740 17,763,664 300,722,382 10.

GROSS ELECTRICAL ENERGY GENERATED 890,116 6,039,973 102,560,827 (MWil) i 1.

NET ELECTRICAL ENERGY GENERATED 849,202 5,772,574 97,595,946 (MWil) i 12.

REACTOR SERVICE FACTOR 100.0 99.5 88.6 i

13.

REACTOR AVAILABILITY FACTOR 100.0 99.5 88.6 14.

UNIT SERVICE FACTOR 100.0 99.0 87.1 15.

UNIT AVAILABILITY FACTOR 100.0 99.0 87.1 16.

UNIT CAPACITY FACTOR (Using MDC) 101.5 100.4 85.2 17.

UNIT CAPACITY FACTOR (Using Design MWe) 97.5 96.5 81.9 18.

UNIT FORCED OUTAGE RATE 0.0 0.74 2.25 l

19. SIIUTDOWNS SCllEDULED OVER NEXT 6 MONTilS (TYPE, DATE, AND DURATION OF EACli):

L Refueling Date: 10/12/96 l

Duration: 42 days l

20. IF S11UT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4

o*

?

PART E UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-483 UNIT NAME:

CALLAWAY UNIT I DATE:

8/6/96 COMPLETED BY:

M. A. liolmes TELEPlIONE:

573/676-8842 FAX:

573/676-8562 REPORT MONTil: JULY 1996 METHOD OF i

TYPE SilUTTING DOWN F: FORCED DURATION TiiE REACTOR OR CORRECTIVE NO.

DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER ACTIONS /CO

SUMMARY

REASON METilOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B. MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM l

D: REGULATORY RESTRICTION 4: OTIIER(EXPLAIN) i E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN)

II: OTIIER(EXPLAIN) i l

i Page 3 of 4