ML20106G860

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Feb 1996 for Callaway Plant,Unit 1
ML20106G860
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/29/1996
From: Affolter R, Holmes M
UNION ELECTRIC CO.
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3345, NUDOCS 9603190129
Download: ML20106G860 (7)


Text

'

Ca!!asay Plant Post othce Box 620

', , Tuiton. Missoun 65251 Union Euccnue

$3 March 8,1996 Document Control Desk Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop PI-137 Washington,DC 20555 ULNRC-3345 Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT FEBRUARY 1996 The enclosed Monthly Operating Report for Febmary 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

C'8l R. D. olter Manager, Callaway Plant RDA/HDB/MAH Enclosure T

180133 9603190129 960229 / 6--

PDR ADOCK 05000483 l R PDR -

i i

. ULNRC-3345 '

Mar'ch 8,1996 Page 2 cc: Mr. L. J. Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Ms. Kristine M. Thomas (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13-E-21 Washington, DC 20555 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Washington, DC 20037 NRC Resident Inspector l

. ULNRC-3345 Mar'ch 8,1996 Page 3 bec: Institute of Nuclear Power Operations Records Center Suite 100 700 Galleria Parkway Atlanta, GA 30339-5957 Dottie Sherman American Nuclear Insurers 29 S. Main Street West Hartford, CT 06107 Mr. T. M. Handlan Westinghouse Electric Corp.

I1601 Lilburn Park Road St. Louis, MO 63146 Mr. Fred Yost Director of Research Utility Data Institute 1700 K. Street Northwest Suite 400 Washington DC 20006 Manager, Plant Support Wolf Creek Nuclear Operating Corporation PO Box 411 Burlington, KS 66839 D. F. Schnell (400)

G. L. Randolph J. V. Laux/G. A. Hughes A. C. Passwater/D. E. Shafer (470)

M. P. Barrett (100)

P. L. Reynolds (470) NSRB R. J. Irwin (470)

M. E. Taylor H. D. Bono E210.0001 A160.0761 RDA Chrono

, ULNRC File

)

1

DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I DATE: 3/8/96 COMPLETED BY: M. A. Holmes TELEPHONE: 314/676 4 842 FAX: 314/676-8562 PART A-OPERATIONS

SUMMARY

The plant operated at approximately 100 % for the entire month of February with the following exceptions:

On 02/13/%, at 15:30, power was reduced to 90.2% to fix a I A Low Pressure Heater tube leak.

On 02/14/96, at 16:25, power was reduced to .8% due to high sulfate levels in the secondary side because of resin intrusion from the 'F' Polisher Vessel.

PART B - PORY AND SAFETY VALVE

SUMMARY

None.

Page1of4

0 i

PART C l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-483 UNIT: Callaway Unit 1 DATE: 3/8/96 COMPLETED BY: M. A. Holmes TELEPHONE: 314/676-8842 FAX: 314/676-8562 MONTH FEBRUARY 1996 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL PAX (MWe-Net) DAY (MWe-Net) i 1 1.174 17 1.168 2 1.176 18 1.171 3 1.174 19 1.167 4 1.174 20 1.159 5 1.170 21 1.167 6 1.169 22 1.161 7 1.161 23 1.155 8 1.163 24 1.163 9 1.166 25 1.156 10 1.164 26 1.152 11 1.171 27 1.166 12 1.171 28 1.173 13 1.131 29 1.171 14 956 30 15 747 31 16 1.l(4 Page 2 of 4

PART D OPERATING DATA REPORT

. DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I DATE: 3/8/96 COMPLETED BY: M. A. Holmes TELEPHONE: 314/676-8842 FAX: 314/676-8562 OPERATING STATUS:

(FEB) (YTD) (CUM)

1. REPORTING PERIOD:

GROSS HOURS IN REPORTING PERIOD: 6% 1,440 98,125.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 100 %

4 4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL 6%.0 1,440.0 86,565.5
6. REACTOR RESERVE SHUrDOWN HOURS 0 0 0 i 7. HOURS GENERATOR ON-LINE 692.0 1,421.0 85,062.4
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0 l
9. GROSS THERMAL ENERGY GENERATED 2,421,446 4,983,781 287,942,499 (MWH l
10. GROSS ELECTRICAL ENERGY GENERATED 829,573 1,707,853 98,228,707 (MWH)

I 1. NET ELECTRICAL ENERGY GENERATED 792,122 1,631,512 93,454,884 (MWH) ,

12. REACTOR SERVICE FACTOR 100 100 88.2 l
13. REACTOR AVAILABILITY FACTOR 100 100 88.2
14. UNIT SERVICE FACTOR 99.4 98.7 86.7
15. UNIT AVAILABILITY FACTOR 99.4 98.7 86.7
16. UNIT CAPACITY FACTOR (Using MDC) 101.2 100.7 84.7 a

l

17. UNIT CAPACITY FACTOR (Using Design MWe) 97.2  %.8 81.3
18. UNIT FORCED OUTAGE RATE .57 1.37 2.33
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling Date: 10/05/ %

Duration: 42 days l

20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4

PART E ,- ,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-483 ,

UNIT NAME: CALLAWAY UhTT I DATE: 3/8/96 COMPLETED BY: M. A. Holmes TELEPHONE: 314/676-8842 FAX: 314/676-8562 REPORT MONTH: FEBRUARY 1996 METHOD OF TYPE SHUITING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCHEDULED OIOURS) REASON REDUCING POWEE ACTIONS / COMMENTS 2 960214 F 4 A 1 SEE

SUMMARY

BELOW

SUMMARY

On 02/14/96, at 16:25, power was reduced to .8% due to high sulfate levels in the secondary side because of resin intrusion from the 'F' Polisher Vessel.

REASON METHOD A: EQUIPMENTFAILURE(EXPLAIN) 1: MAhTIAL B. MAINT. ORTEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATICSCRAM D: REGULATORY RESTRICTION 4: OTHER(EXPLAIN)

E: OPERATORTRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONALERROR(EXPLAIN)

H: OTHER(EXPLAIN)

Page 4 of 4

_ _ - _ _ _ _ _ _ - _ - _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ - _ _ - _ _ - _ --