Callaway Plant
?
Post Office Box 620 fulron. Missouri 6525I i
l N UNION bLECTlGC l
[4,3 July 8,1996 U. S. Nuclear Regulatory Commission l
Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-0001 ULNRC-3398 Gentlemen:
l l
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 l
MONTHLY OPERATING REPORT JUNE 1996 l
l The enclosed Monthly Operating Report for June 1996 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
R.
.' Affolter Manager, Callaway Plant RDA/MAH/tmw l
Enclosure i
i 9607150085 960630 l
PDR ADOCK 05000483 R
PDR l
ULNRC-3398 July 8,1996 Page 2 cc: Mr. L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV l
611 Ryan Plaza Drive, Suite 400 l
Arlington, TX 76011-8064 l
l Senior Resident Inspector l
Ms. Kristine M. Thomas Licensing Project Manager, Callaway Plant l
Office of Nuclear Reactor Regulation l
U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Depannient l
Missouri Public Service Commission PO Box 360 l
JefTerson City, MO 65102 i
Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N'. Street N.W.
l Washington, DC 20037 i
l
.I i
i
... ~. _ -
DOCKET NO.:
50-483 UNIT NAME:
CALLAWAY UNIT 1 DATE:
7/8/%
COMPLETED BY:
M. A. Holmes TdLEPHONE:
573/676-8842 FAX:
573/676-8562 PART A - OPERATIONS
SUMMARY
The plant operated at approximately 100 % for the entire month of June.
PART B - PORY AND SAFETY VALVE
SUMMARY
None.
l l
i i
Page1of4 i
i
n 1
~
l PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-483 UNIT:
Callaway Unit 1 DATE:
7/8/%
COMPLETED BY:
M. A. Holmes TELEPHONE:
573/676-8842 FAX:
573/676-8562 MONTH JUNE 1996 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Neo DAY (MWe-Ne0 1
1.155 17 1.138 2
1.155 18 1.142 3
1.162 19 1.141 4
1.162 20 1.131
)
5 1.154 21 1.111 6
1.149 22 1.111 7
1.159 23 1.109 l
8 1.163 24 1.145 9
1.161 25 1.151 10 1.159 26 1.150 11 1.155 27 1.146 l
12 1.148 28 1.141 13 1.145 29 1.116 i
l 14 1.142 30 1.120 i
15 1.141 31 l
l 16 1.131 l
l l
i i
Page 2 of 4 l
i i
PART D OPERATING DATA REPORT IO DOCKET NO.:
50-483 i
UNIT NAME:
CALLAWAY UNIT 1 DATE:
7/8/96 COMPLETED.BY:
M. A. Holmes TELEPHONE:
573/676-8842 l
FAX:
573/676-8562 OPERATING STATUS:
(JUN)
(YTD)
(CUM) 1.
REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
720 4,367.0 101,052.5 2 CURRENTLY AUITIORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY l
(MWe-Net): 1125 l
DESIGN ELECTRICAL RATING (MWe-Net): 1171 3.
POWER LEVEL TO WIIICH RESTRICTED (IF ANY) (MWe-Net): 100 %
i 4.
REASONS FOR RESTRICrlON(IF ANY)
THIS MONTH YR TO DATE CUMULATIVE l
5.
NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,340.0 89,465.5 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 0
7.
HOURS GENERATOR ON-LINE 720.0 4,314.7 87,956.1 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
l 9.
GROSS THERMAL ENERGY GENERATED 2,554,157 15,121,924 298,080,642 l
(MWH l
10.
GROSS ELECTRICAL ENERGY GENERATED 862,454 5,149,857 101,670,711 l
(MW10 l
11.
NET ELECTRICAL ENERGY GENERATED 822,940 4,923,372
%,746,744 (MW10 12.
REACTOR SERVICE FACTOR 100.0 99.4 88.5 13.
REACTOR AVAILABILITYFACTOR 100.0 99.4 88.5 14.
UNIT SERVICE FACTOR 100.0 98.8 87.0 15.
UNIT AVAILABILITY FACTOR 100.0 98.8 87.0 16.
UNIT CAPACITY FACTOR (Using MDC) 101.6 100.2 85.1 17.
UNIT CAPACITY FACTOR (Using Design MWe) 97.6 96.3 81.8 18.
UNIT FORCED OUTAGE RATE 0.0 0.87 2.28 J
1
- 19. 3HUrDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
l Refuelirg Date: 10/12/ %
Duratica: 42 days
- 20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:
Page 3 of 4 4
- - - ~ ~ ~ ~~~
.~
PART E UNIT SHUTDOWNS AND POWER REDUCTIONS
^
{
DOCKET NO.:
50-483 I
UNITNAME:
CALLAWAY UNIT 1 DATE:
7/8/96
)
COMPLETED BY:
M. A. Holmes TELEPHONE:
573/676-8842 FAX:
573/676-8562 REPORT MONTH: JUNE 19%
{
TYPE METHOD OF I
SHUTTING DOWN F: FORCED DURATION M
DATE S: SCIIEDULED_
(HOURS)
REASON REDUCING POWER ACTIONS / COMMENTS THE REACTOR OR CORRECTIVE
SUMMARY
I REASON i
METHOD
{
A: EQUIPMENTFAILURU(ID& LAIN)
J B. MAINT. OR TEST 1: MANUAL C: REFUELING 2: MANUALSCRAM D: REGULATURYRESTRICTION 3: AUTOMATICSCRAM E: OPERATOR TRAINING AND LICENSE EXAMINATION 4: OTIER(EXPLAIN)
F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER(EXPLAIN)
I t
I I
i Page 4 of4