ML20134M196

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1997 for Callaway Plant Unit 1
ML20134M196
Person / Time
Site: Callaway Ameren icon.png
Issue date: 01/31/1997
From: Affolter R, Holmes M
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3532, NUDOCS 9702200140
Download: ML20134M196 (6)


Text

CallaAar Plant Post Off:ce Box 620 Fulton. Missouri 65251 4

Union EtucnueE February 12,1997 i

U. S. Nuclear Regulatory Commission 1

Attn: Document Control Desk Mail Stop PI-137

)

Washington, DC 20555-0001 ULNRC-3532 Gentlemen:

DOCKET NUMHER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTi1LY OPERATING REPORT JANUARY 1997 The enclosed Monthly Operating Report for January 1997 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

7 4

R. D.

Tolter Manager, Callaway Plant RDA/MAH Enclosure i

I

g22gg gagga R

' 301] g

ULNRC-3516 January 8,1997 Page 2 cc: Mr. L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drise, Suite 400.

Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman,MO 65077 Ms. Kristine M. Thomas (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Washington, DC 20037 i

j 2

DOCKET NO.:

50-483 UNIT NAME:

CALLAWAY UNIT I DATE:

2/12/97 COMPLETED BY:

M. A. Ilolmes TELEPliONE:

573/676-8842 FAX:

573/676-8562 PART A -OPERATIONS

SUMMARY

The plant operated at approximately 100% for the entire month of January.

PART H. PORV AND SAFETY VALVE

SUMMARY

None, I

l l

I i

i i

l i

r Page1of4

PART C r

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-483 UNIT:

Callaway Unit 1 DATE:

2/12/97 COMPLETED BY:

M. A. Holmes I

TFLEPHONE:

573/676-8842 FAX:

573/676-8562 MONTH: JANUARY 1997 l

AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL i

i t

DAY (MWe-NeO DAY (MWe-NeO

]

I 1.171 17 1.181 2

1.164 18 1.180 m

.3 1.164 19 1.176 4

1.167 20 1.174 i

5 1.179 21 1.169 l

6 1.180 22 1.175 7

1.178 23 1.181 L

8 1.178 24 1.180 9

1.178 25 1.178 10 1.183 26 1.176 11 1.182 27 1.177 2

i 12 1.183 28 1.180 13 1.182 29 1.176 14 1.180 30 1.174 15 1.176 31 1.168 16 1.180 Page 2 of 4

PART E UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

50-483

~

UNIT NAME:

CALLAWAY UNIT I DATE:

2/12/97 COMPLETED BY:

M. A. IIolmes TELEPliONE:

573/676-8842 FAX:

573/676-8562 REPORT MONTil: JANUARY 1997 METIIOD OF TYPE 511UTTING DOWN F: FORCED DURATION TliE REACTOR OR CORRECTIVE M

DATE S: SCIIEDULED (IlOURS)

REASON REDUCING POWER ACTIONS / COMMENTS UMMARY:

REASON MET 110D A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B. MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTIIER (EXPLAIN)

E: OPERATORTRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN)

II: OTilER(EXPLAIN)

Page 3 of 4

~-

PART D OPERATING DATA REPORT DOCKET NO.:

50-483 UNIT NAME:

CALLAWAY UNIT 1 DATE:

2/12/97 COMPLETED BY:

M. A. Ilolmes TELEPliONE:

573/676-8842 FAX:

573/676-8562 OPERATING STATUS:

(JAN)

(YTD)

(CUM) 1.

P.EPORTING PERIOD:

GROSS IlOURS IN REPORTING PERIOD:

744 744 106,213.5 2 CURRENTLY.AUT110RIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECTRICAL RATING (MWe-Net): 1171 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net): 100 %

4.

REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL 744 744 93,820.9 6.

REACTOR RESERVE SHUTDOWN HOURS 0

0 0

7.

HOURS GENERATOR ON-LINE 744 744

.92,249.4 i

8.

UNIT RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS T11ERMAL ENERGY GENERATED (MWH 2,564,364 2,564,364 312,936,171 10.

GROSS ELECTRICAL ENERGY GENERATED 914,222 914,222 106,773,138

)

(MWil)

I 1.

NET ELECTRICAL ENERGY GENERATED 875,300 875,300 101,589,049 (MWH) 12.

REACTOR SERVICE FACTOR 100.0 100.0 88.3 i

13.

REACTOR AVAILABILITY FACTOR 100.0 100.0 88.3 14.

UNIT SERVICE FACTOR 100.0 100.0 86.9 15.

UNIT AVAILABILITY FACTOR 100.0 100.0 86.9 16.

UNIT CAPACITY FACTOR (Using MDC) 104.6 104.6 85.0 17.

UNIT CAPACITY FACTOR (Using Design MWe) 100.5 100.5 81,7 18.

UNIT FORCED OUTAGE RATE 0.0 0.0 2.30 l

19. SIIUTDOWNS SCHEDULED OVFr. NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACll):

Refueling Date:

Duration:

20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4 e

..