ULNRC-03312, Monthly Operating Rept for Dec 1995 for Callaway Unit 1
| ML20096C087 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 12/31/1995 |
| From: | Affolter R, Holmes M UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ULNRC-03312, ULNRC-3312, NUDOCS 9601170108 | |
| Download: ML20096C087 (6) | |
Text
..
Callasay Plant Post Cince Box 620
,y Fulton, Missout 65251 Union Euccnuc
'*""* s ' " '
33 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-03312 Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT DECEMBER 1995 The enclosed Monthly Operating Report for December 1995 is submitted pursuant to Section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
i N
R. D. Affolter Manager, Callaway Plant RDA/HDB/MAH Enclosure cc: Distribution attached 170031 9601170108 951231 PDR ADOCK 05000483 R
d cc distribution for ULNRC-03312 i
with enclosures Mr. L. Joe Callan Regional Administrator U.S. Nuclear Regulatory Commission Region IV l
611 Ryan Plaza Drive Suite 400 Arlington,TX 76011 Ms. Kristine M. Thomas (2 copies)
Licensing Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Cornmission Mail Stop 13-E-21 Washington, D.C. 20555 Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts & Trowbridge 2300 N. Street N.W.
Washington, D.C. 20037 NRC Resident Inspector
.m
..... = _.
l l-DOCKET NO.:
50-483 UNIT NAME:
CALLAWAY UNIT 1 DATE:
1/5/96 COMPLETED BY:
M. A. Holmes TELEPHONE:
314/676-8842 FAX:
314/676-8562 PART A - OPERATIONS
SUMMARY
The plant operated at approximately 98.5% for the first fifteen days of December due to steam generator low pressure limitations after chemical cleaning. It ran at approximately 100% until 12/29/95 at 20:00 CST when power was reduced to 92.1% to conduct Instrument and Control surveillances.
PART B - PORV AND SAFETY VALVE
SUMMARY
None.
Page 1 of 4
=-
PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-483 UNIT.
Callaway Unit 1 DATE:
1/5/96 COMPLETED BY:
M. A. Holmes TELEPHONE:
314/676-8842 FAX:
314/676-8562 MONTH DECEMBER 1995 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL DAY (MWe-Net)
M (MWe-Net) 1 1.156 17 1.172 2
1.154 18 1.169 3
1.161 19 1.171 4
l.163 20 1.172 5
1.162 21 1.172 6
1.166 22 1.173 7
1.164 23 1.172 8
1.164 24 1.173 9
1.168 25 1.175 10 1.167 26 1.176 11 1.164 27 1.176 12 1.165 28 1.178 13 1.158 29 1.166 14 1.168 30 1.167 15 1.159 31 1.173 16 1.174 Page 2 of 4
PART D
^
OPERATING DATA REPORT
+
DOCKET NO.:
50-483 UNIT NAME:
CALLAWAY UNIT 1 DATE:
1/5/96 COMPLETED BY:
M. A. Holmes TELEPHONE:
314/676-8842 FAX:
314/676-8562 OPERATING STATUS:
(DEC) (YTD) (CUM) 1.
REPORTING PERIOD:
GROSS HOURS IN REPORTING PERIOD:
744 8,760 %,685.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 l
DESIGN ELECTRICAL RATING (MWe-Net): 1171 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 100 %
)
4.
REASONS FOR RESTRICTION (IF ANY).
THIS MONTH VR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 744 7,418.8 85,125.5 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 0
7.
HOURS GENERATOR ON-LINE 744 7,359.6 83,641.4 8.
UNIT RESERVE SHUTDOWN HOURS 0
0 0
9.
GROSS THERMAL ENERGY GENERATED 2,628,282 25,401,955 282,958,718 (MWH) Cornetion for November 2.524,598 22,773,673 280,330,436 10.
GROSS ELECTRICAL ENERGY GENERATED 909,272 8,669,086
%,520,854 (MWH) 11.
NET ELECTRICAL ENERGY GENERATED 868,868 8,252,830 91,823,372 (MWH) 12.
REACTOR SERVICE FACTOR 100 84.7 88.0 13.
REACTOR AVAILABILITY FACTO *1 100 84.7 88.0 14.
UNIT SERVICE FACTOR 100 84.0 86.5 15.
UNIT AVAILABILITY FACTOR 100 84.0 86.5 16.
UNIT CAPACITY FACTOR (Using MDC) 103.8 83.7 84.4 17.
Ul,TT CAPACITY FACTOR (Using Design MWe) 99.7 80.5 81.1 18.
UNIT FORCED OUTAGE RATE 0.0 3.31 2.34
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Date: 10/05/96 Duration: 42 days
- 20. IF SHUT DF4N AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:
Page 3 of 4
PART E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-483 UNIT NAME:
CALLAWAY UNIT 1 DATE:
1/5/96 COMPLETED BY:
M. A. Holmes TELEPHONE:
314/676-8842 FAX-314/676-8562 REPORT MONTH: DECEMBER 1995 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE i
NO.
DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER AC110NS/ COMMENTS l
t
SUMMARY
REASQN METHOD i
A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B. MAINT. ORTEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATICSCRAM D: REGULATORY RES7RICTION 4: OTHER(EXPLAIN)
E: OPERATORTRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER(EXPLAIN) i Page 4 of 4_
[
1 f