Monthly Operating Rept for Aug 1997 for Callway
ML20217A494
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/31/1997
From: Affolter R, Holmes M
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-3650, NUDOCS 9709190191
Download: ML20217A494 (6)


Text

'

g 's C$asay Piaar

, fut Ofbcc Bus CN fu!!an Mmoun 6525I I

UNION Etucruic

'83 September 15,1997 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI-137 Weington, DC 20555-0001 ULNRC-3650 Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REf-QRI AUGUST 1997 i The enclosed Monthly Operating Report for August 1997 is submitted pursuant to Section 4

6.9.1.8 of the Callaway Unit 1 Technical Specifications.

{

R. D. olter Manager, Callaway Plant RDA/MAH Enclosure

[8)\' I l 9709190191 970831 PDR ADOCK 05000483 ll l ! fll! i i goes

~

ULNRC03650 September 15,1997 Page 2 1 cc: Mr. Ellis W. Merschoff Regional Administrator

- U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Barry C Westreich (2 copies)

Acting Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102 Mr. Thomas A, Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.

Washington, DC 20037

c

  • Enclosure ULNRC-3650 September 15,1997 DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I DATE: 9/15/97 COMPLETED BY: M. A. llotmes TELEPilONE: 573/676-8842 FAX: 573/676-4334 PART A - OPER ATIONS SUMM ARY:

The plant operated at approximately 70% for the month of August with the following exception:

On 7/10/97, at 1600, power was reduced to 94.5% due to an axial offset anomaly. On 8/19/97, at 0900, power was reduced at 3% per hour from 94.5% to 70.5% due to the axial offset anomaly. The plant stayed at 70.5% past the end of the month. Excess shutdown margin had been decreasing during the cycle due to the axial offset anomaly.

The load reduction to approximately 70% occurred when shutdown margin reached the plant administrative limit of 1350 pcm (the Technical Specification limit is 1300 pcm).

PART H- PORY AND S AFETY VALVE SUMM ARY:

None.

Page1of4

Enclosure ULNRC-3650 September 15,1997 PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: 50-483 UNIT: Callaway Unit 1 DATE: 9/15/97 COMPLETED BY: M. A. Holmes

TELEPHONE
573/676-8842 FAX: 573/676-4334 4

MONTil: AUGUST 1997 AVERAGE DAILY POWER AVERAGE DAILY POWER LEVEL LEVEL RAl (MWe-Net) DAY (MWe-Net) 1 1.111 17 1.109 2 1.107 18 1.116 3 1.103 19 1.057 4 1.102 20 915 5 1.117 21 885 6 1.124 22 815 7 1.123 23 807 8 1.120 24 799 9 1.113 25 793 10 1.108 26 793 11 1.106 27 791 12 1.115 28 788 13 1.117 29 789 14 1.117 30 789 15 1.104 31 788 16 1.0%

Page 2 of 4

_, , Enclosure ULNRC-3650 -

September 15,1997 FART D OPERATING DATA REPORT DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I DAW: 9/15/97 COMPIETED BY: M. A. Holmes TELEPHONE: 573/676-8842 FAX: 573/676-4334 OPERATING STATUS:

(AUG) (YTD) (CUM)

1. REPORTING PERIOD:

GROSS HOURS IN REPORTING PERIOD: 744 5,831 111,300.5 2 CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGN ELECIRICAL RATING (MWe-Net): 1171

3. POWER LEVEL TO WHICH RESTRICED (IF ANY)(MWe-Net): 100 %
4. REASONS FOR RESTRICTION (IF ANY):

THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACIOR WAS CRITICAL 744 5831 98,907.9 6 REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON-LINE 744 5,831 97,336.4
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0
9. GROSS THERMAL ENERGY GENERATED 2,208,216 20,106,570 330,478,377 (MWH)
10. GROSS ELECTRICAL ENERGY GENERATED 767,431 6,892,217 112,751,133 (MWH)

July Revised Value 362,499 6,124,786 111,983,702

11. NET ELECTRICAL ENERGY GENERATED 739,605 6,598,620 107,312,369 (MWH)
12. REACTOR SERVICE FACIOR' 100.0 100.0 88.9
13. REACTOR AVAILABILITYFACTOR 100.0 100.0 88.9
14. UNIT SERVICE FACTOR 100.0 100.0 87.5
15. UNIT AVAILABILITY FACTOR 100.0 100.0 87.5
16. UNIT CAPACITY FACTOR (Using MDC) 88.4 100.6 85.7
17. UNIT CAPACITY FACTOR (Using Design MWe) 84.9  %.6 82.3
18. UNIT FORCED OUTAGE RATE 0.0 0.0 2.18
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling Date:

Duration:

20. IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATE DATE OF STARTUP:

Page 3 of 4

Enclosure * .'

ULNRC-3650 -

September 15,1997

~

FART E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I DA'IE 9/15/97 COMPLETED BY: M. A. Holmes TEIIPHONE: 573/676-8842 FAX- 573K,76-4334 REPORTMONTH: AUGUST 1997 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR CORRECTIVE NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER ACTIONS / COMMENTS 3 970819 F 0 H I See Summary below

SUMMARY

3. On 8/19/97, at 0900, power was reduced over 2 days from 94.5% to 70.5% due to the axial ofTset anomaly. The plant stayed at 70.5% past the end of the month.

REASON METHOD A- EQUIPMENTFAILURE(EXPLAIN) 1: MANUAL B. MAINT.ORTEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATICSCRAM D: REGULATORY RESTRICTION 4: OTIIER(EXPLAIN)

E: OPERATORTRAINING AND LICENSE EXAMINATION F: ADMINISTRATION G: OPERATIONALERROR(EXPLAIN)