Monthly Operating Repts for Sept 1990 for Braidwood Units 1 & 2
ML20065F710
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/30/1990
From: Dundek K, Kofron K
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BW-90-1008, NUDOCS 9010110167
Download: ML20065F710 (14)


Text

,. . .. .. .. ..

c4 e 1

' Co:nmonwealth Edison -

, , -?' ' o ;. ' h

' .i  : Brtidwood Nuclear P war St:tisn l Routa #1, Box 84 -

. g V) Braceville, Illinois 60407.

%' . Telephone 815/458-2801

' Octobsr 10, 1990=

BH/90-1008t 9

Director, Office of Resource Managements United States Nuclear: Regulatory Commission-Hashington. D.C. 20555' ATTN:' Document Control Desk'

. Gentlemen:: ,

1 Enclosed:for your information isithe Monthly Performance

Report covering Braidwood Nuclear. Power Station for the period-
September:1 through September 30.-1990..

Very.truly yours, d

K . - L '. o on. m.

Station Manager . .

- Braidwood Nuclear Station KLK/EHC/cif i 1(134/ZD85G)

Attachments cc: A. B; Davis,.NRC, Region III NRC Resident Inspector Braidwood Ill. Dept. of Nuclear-Safety.-

.M. J. Hallace.

K..L.iGraessor-s T. J.~Kovach Nuclear Fuel Services, PHR Plant Support INP0 Records Center '

Performance Monitoring Group, Tech-Staff.Braidwood Station.

Nuclear Group Tech Staff Braidwood Station S. Sands-- USNRC S. C. Hunsader-D.R. Eggett-Nuclear Engineering Department 00'073~

.'9010110167l900930 DR-ADOCK-0500g6-

, o ggy

/4p

q e

BRAIDH000 NUJ. EAR'P0HER STATION-UNIT-1 AND UrlIT 2 MONTHLY PERFORMANCE REPORT COMMONHEALTH EDISON COMPANY-s NRC DOCKET NO. 050-456,- LICENSE NO. 'NPF-72 :

NRC DOCKET NO.- 050-457, LICENSE'NO. NPF-77

\

(134/ZD85G/2) l

c; .

~

I *.. .

1. Monthly Report for Braidwood Unit 1 A; Summary of Operatina Experience Braidwood Unit 1 entered tbv month at approximately 95%

reactor-power On-September 29,1990:the unit tripped due; to spurious Solid State Protection System (SSPS) actuations. The unit remained shutdown-the. remainder of-the: month.-

t 4

i (134/ZD85G/3)

. g M *

(,. .

B. ' OPERATING DATA REPORT- DOCKET NO.: 50-456 g UNIT: Braidwood;1 DATE: '10/10/90-COMPILED BY: K. M. Dundek TELEPHONE: -(815)458-2801L ext. 24801 OPERATING STATUS

. 1. Reporting Period: September, 1990 Gross Hours: 720 i

-l 2.- Currently Authorized Power Level (MHt): 3411 l

- Design Electrical Rating (MHe-gross):- 1175 J

- Design. Electrical Rating- (MHe-net):- 1120 l Max. Dependable Capacity (MHe-gross): 1175 i

Max Dependable Capacity. (MHe-net): 1120 )

i Power level to which restricted (If-Any):' None' 3.

4.- leasons- for restriction (If Any):. None THIS MONTH: YR TO DATE ' CUMULATIVE j

5. Report period Hours: 720 6551 19040 :l
6. Hours: Reactor Critical: 689.6 6215'.5- '15312.7 u

[ 7. RX Reserve' Shutdown Hours: 0.0 ~ 0.0' O.0

8. Hours Generator on Line: ~689.6 6186.2 15035.8

~ a

9. Unit Reserve Shutdown Hours: 0.0 -0.0- 0'. 0 1
10. Gross Thermal Energy-(HHH): ~2196142; 19695912 44499120= .l

-11. Gross Elec. Energy (MHH): 756790 681564fi '15296713' g

12. -Net'Elec. Energy.(MHH): '727440- 6557341r 14614512'- I)
13. Reactor Service Factor: 95.8 94 .' 9 ' 80.4 ~f
14. Reactor Availability Factor: 95.8 94.9 80.41
15. Unit Service Factor: 95.8 94.4 7 9 .' O ' jl ,
16. Unit Availability 7 actor: 95!8- 4 94'.4 -79.0 l
17. Unit Capacity Factor (MDC net): 90.2- 11d 68l5'  ;
18. Unit Capacity Factor (DER' net): 90.2- 89.4 "68.5  :

l

19. Unit Forced Outage: Rate: 4.2 5.6 5.4
20. Unit Forced Outage Hours: 30.4 ' 364.8 - 865.1 ~ 1 t

2.1. Shutdowns Scheduled Over Next'6 Months: Refueling. Outage - March, 199.1 j

22. If Shutdown at End of Report Period, Estimated Date of Startup: October 10. 1990 i s

s (134/ZD85G/4)

p@ , . .- ,

p ,

-(

a

-C. AVERAGE DAILY UNIT NET POWER LEVEL LOG DOCKET <NO.:( 50-456 . . i UNIT: Braidwood;1

'DATE:- 10/10/90' j!

/

o COMPILED BY.::~K. M. Dundek TELEPHONE:

(815)458-2801:

j

')

ext. 2480-MONTH: September, -.1990

1. lobi 17. '1026

.i

2. 1082 18.. 1037' ,
3. -1016- 19.: 1014' ,
4. 1042 20. 1024- .,

5-. 1112' -21.- 1053

l. 6. 1109 22. 108?  ;

l-

7. 1096 .23. '1024-t 8.- 1085 .24. 1035' 9.- 1011 2 5. . 1045-
10. 1099- 26, 1048

-11. 1052 27.. '1057 ,

12. 1082 28. . _ 1099~
13. 1095 29.- 815E ,

i 14. 1080 ~ 30. 15. 996'

16. 941 i

INSTRUCTIONS '

On this fo.rm list the.averagt daily. unit power level in HHe Net for each day in the reporting month. Compute to the nearest whole mepwatt.

These figures'will be used to plot _a graph for each reporting month. .

Note that when maximum dependable capacity is used for the net electrical  !

rating of the~ unit there may be occasions-when the da'ily. average power .

level cu:eeds the 100% line-(or the restricted power level'11ne). _. In j

such cases the average' daily unit power output sheet should be footnoted.

to explain the apparent anomaly.

(134/ZO85G/5)  !

Y e ,

D. UNIT SHUTDOWNS / REDUCTIONS I DOCKET NO.:iS0-4'56 ,

UNIT: Braidwood :1 -?

DATE: 10/10/90-COMPILED BY: K. M. Dundek  !

. TELEPHONE: (815)458-2801 ext. 2480 REPORT PERI 00: September,;1990 No QAIE IY._PE HOURS REASON HETH00 LER NUMBER SYSTEM . COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE-4 900929 F 30.4 A 3 90-018- JG.'.UnderJ ': Spurious "B". Train Solid State Protection Investigation System (SSPS) actuations; appeared to be caused-by internal problem with SSPS. processing ,

. circuitry.

  • SUMMAR

..............Y..* .-

TYPE REASON METHOD SYSTEM & COMPONENT l F-Forced Equipment Failure Maint or Test 1 - Manual Exhibit F & H .R S-Scheduled 1-Maint or Test' 2 - Manual-Scri.a Instructions for Preparation of~

C-Refueling .

3 - Auto Scras' Data Entry Sheet -

D-Regulatory.. Restriction 4 - Continued _ Licensee Event Report 1 E-Operator Training & License Examination 5 - Reduced oad (LER) File-(NUREG-0161)

'F-Administration 9'- Other.

G-Oper Error

'H-Other

.(134/ZD85G/6) .

q e

41 s .

e

__m_._ _ , . _ . - - _ _ - - , _ . _ ___ _ _ _ _

E.. UNIOUE REPORTING'REOUIREMENTS:- Unit 1

'1. Safety / Relief val *e operations. ~ '

' VALVES 'NO &. TYPE PLANT: DESCRIPlION l DAIE ACTUATED ' ACTUATION- CONDITION OF EVENT None- -~

2.. ' Licensee _ generated changes to 00CM.-

None-

-h t

4 e

g..

~

(134/ZD85G/7) ,

~6 .-

___3_____ - , _- - - - -


L--- -

f;J "  :.:

0 F. ' LICENSEE ~ EVENT REPORTS - UNIT =1 The following is 'a tab'ular summary of-all Licensee Event Reports

. submitted during the reporting period, September 1 through September 30, 1990. This-information is provided pursuant,to the reportable occurrence reporting requirements.as set forth-in 10 CFR 50.73 Licensee Event Report Report Number - Ditg Title of Occurrente

90-013 09-06-90 Feedwater Isolation due to spurious actuation of the Train B Feedwater

' Isolation Circuitry.90-014' 09-11-90 Entry into Mode 3 prior to

. performing;lB Main Steamline'-

-Isolation, Valve Operability Test due:to management. deficiency.-

90-015 09-26-90 Missed Aux _iliary Building Vent ..

Stack Grab Sample due=to personnel.

error.-

' a 90-016 09-27 Spuricus' Auto Start' of the

'. Auxiliary Building:Ina:cessible Filter Plenum A'-Charcoal Booster; Fan OB'due to unknown cause.-

i f

(134/ZD85G/8) i,

m ~l

?} [

f,v.+  ;.;-7} ,

., )

I'. Monthly Report for Braidwood Unit 2 j r

A .' Summary of Operatina Exoerience  ;

'Braidwood Unit 2 operate'd routinely:in September with no-  !

outages or significant. power reductions.: ' .

1 1

i q

q 4

l i

)

'l

'l

'i o

j

.f q

L (134/ZD85G/9)

-l L" i . .. _ .

l

s= , ,

t f: .

]. c B. OPERATING DATA REPORT DOCKET NO..: .50-457. , .

UNIT: Braidwood'2  ;

DATE: -10/10/90;. .;

COMPILED BY:' K. M. Dundek' TELEPHONE: (815)458-2801 I L ext.-2480

, OPERATING STATUS "

[

1. - . Reporting Period: September, 1990- Gross Hours: .720
2. Currently Authorized Power Leval-~(MMt):- 3411-Design Electrical Rating (MHe-gros *): 1175 l

l_ ' Design Electrical: Rating T!?'S

  • 2.:- 1120-c Max Dependable Capacity (MWe. gross): 1175  :

L Max Dependable. Capacity (MHe-net):- 1120 l

l

3.  : Power level -to Taich restricted = (If.- Any): ~ None '
4. Reasons .for restriction (If Any):' None.

l THIS MONTH -YR TO DATE ' CUMULATIVE 1'

15. Report period Hours: 720: 6551 17122
6. . Hours Reactor Critical:- 720 4695.2- 13830.5- *
7. RX Reserve Shutdown, Hours:c 0.0' --0 0 0.0- 7
8. ' Hours Generator on Line:- 720 -4641.1 13702.2 j 9.., Unit Reserve Shutdown. Hours: 0.0 'O.O. - 0;0 '
10. Gross Thermal-Energy (MHH):- -2318122 12492404 3833'l452- 1 l
11. Gross Elec. Energy (MHH):- 795182- 4228840- 13120228 4
12. Net'Elec. Energy'-(MHH):: 764793 24018445- -12511420.
13. ' Reactor Service Factor: 100 ' 71. 7 - 80.8:
14. Reactor' Availability Facto : 100 71.7; '80dl 3
15. Unit Service Factor: '100' ~70.8' ' 80. 0'. j.
16. Unit Availability Factor: '

100 _

70;8. '80.0-  ;

17. Unit Capacity Factor (MDC net): ._.

94.' 8 - 54.8' '65.2

18. Unit Capacity Factor (DER net): 94.8 54dl 65.2
19. Unit Forced Outage Rate: 0.0 321 4.3-
20. Unit Forced Outage Hours: O d_ . 147.S 613.6
21. Shutdowns Scheduled Over.Next 6 Months: None
22. If. Shutdown at End of Repo:t Period, Estimated Date of Startup: 1 i

4 1

- (134/ZD85G/10) r

-' i l ,

]

pp ,

jif .

3 C.- AVERAGE DAILY UNIT NET POWER LEVEL' LOG- DOCKET NO.: 50-457' .

N UNIT: Braidwood 2  !

DATE: 10/10/90  ;

COMPILED BY: K. M..Dundek >

TELEPHONE: (815)458-2801'

-ext. 2480 MONTH: September,- 1990

1. 1046 17, 1041 _,

t

' 2. 1078 18. 1033- I r

I 3.- '1Q26 19. 1012'

4. 1 AB- 20. 1006

5.: 1073 21. '1049 6 .- 1055 22, 1084 i j

7.. 41094 23L '1045 j 8,. 1090' , 24 ' 1053 -!

9. 976 25.
  • 1133 !  :

10.. 1047 26. -1113-E 11, 1060 27. '1063 q I

28..

12. 1112- 1104-'
13. 1111 29' -

. '1109  !

14, 130.'

1095L 10.88 ~

]

15. 1006

' 1

16. _

980 INSTRUCTIONS On thfs form list the sverage daily unit' power level in MHe-Net for each 't day in the reporting month. Compute-to.the. nearest whole megawatt. -;

These figures. will be used to plot a : graph for each reporting. month. '

Note that when maximum dependable capacity is used for.the n9t' electrical  :

rating of'the unit there may be occasions when:the daily average-power'  ;

level exceeds the 100% .line -(or the restricted powcr level line). In such cases the average daily unit power output. sheet should be: footnoted to explain the apparent anomaly.

1'

  • Due to Condenser Efficiencies 0 1

l (134/ZD85G/11) t l

T . . . .-. _ .-

.. . .i

. D. UNIT SHUTD0MNS/ REDUCTIONS ' DOCKET NO.: 50-457 '

UNIT:iBraidwood 2 DATE: 110/10/90' COMPILED BY: K. M. Dundek TELEPHONE: (815)458-2801 ext. 2480 - 1

REPORT PERIOD: -September, 1990-

=

_.Mo_ DAIE 11P_E HOURS REASON METH(M LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE' ,

t

_ None

  • S U M M A:R Y
  • TYPE REASON METHOD SYSTEM & COMPONENT F-Forced :A-Equipaent' Failure Maint or Test- 1 - Manual . Exhibit F & H S-Scheduled B-Maint or. Test 2 - Manual-Scram -Instructions for Preparation of '

C-Refueling 3 - Auto Scram Data Entry Sheet

'D-Regulatory Restriction. .

4 -' Continued' Licensee Event Report' E-Operator < Training & License Examination.  : 5 - Reduced Load (LER) File (NUREG-0161)

'F-Administration- 9 - Other G-Oper Error H-Other

(134/ZD85G/12)

["E 7 ' -

^

=

~.^~" _ . . .. . . . . -

.- . - - ~ = . - - - . - . - . - . . - - . -

~

~

.UNIOUE REPOPJIjG_EEUUIREMENTS'.- UNIT 2-LE..

1. . . Safetyh jief valve operations.

VALVES -NO & TYPE' PLANT. DESCRIPTION DAIE ACTUATED. ACTUATION CONDITION OF EVENT _

None 2.. . Licensee gensrated changes to 00CM.

None

s

~

b (134/ZD85G/13)

Mr$; *r .

q . _ .

W

}g pl L':

F. LICENSEE-EVENT REPORTS - UNIT 2 The following isLa-tabular summary of all Licensee Event-Reports'

. submitted'duringLthe_ reporting period, September 1 through September 30,.1990. This information is provided pui3uant to the-.

reportable occurrence reporting requirements-as= set torth in 10 CFR 50.73.

Licensee Event Report Egoort Number QA11 - Title of Occurremsn' .4 NONE -l

.: l L-  !

I l"  !

1 l

l 1

a

'l 1

-I

.l i

t

(134/ZD85G/14) 1

',