Final Deficiency Rept Re Questionable QC Acceptance of Pipe Hanger Installation.Initially Reported on 821201.Util Mgt Met W/Region III to Present Plans for Implementing Actions Outlined in 821210 Confirmatory Action Ltr
ML20064L390
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/14/1983
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-61526, NUDOCS 8302150240
Download: ML20064L390 (2)


Text

. o t

V:

Donald A. Wells j VrayfGaMy AswaNe 1313) 237 % 57 2000 Second Avenue 31 37-January 14, 1983 EF2-61526 Mr. James G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Camtission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Final Report of 10CFR50.55(e) Its on Questionable Quality Con-trol Acceptance of Pipe Hanger Installations (#82)

Dear Mr. Keppler:

On Decmber 1, 1982, Detroit Edison's Mr. T.A. Alessi, Director - Project Quality Assurance, telephoned Mr. H. Wescott of NRC Region III, to report on a potential problem with questionable quality control (OC) acceptance of pipe hanger installations at the Fermi 2 site.

This report identified a potentially reportable deficiency involving the ,

adequacy of contractor's quality control inspections of' pipe supports.

Through a review of past and sme current surveillance reports, Project Quality Assurance (POA) determined that sme of the supports examined by POA had one or more noted deficiencies of varying significance.

As a result of the initial telehpone call, Mr. I. Yin of the NRC Region III visited the Ferd 2 site on Decmber 9th and 10th,1982, to investi-gate the prob 1cm in nore detail and discuss Edison's action plans. Based on our agreements with Mr. Yin, your office issued a Confirmatory Action Letter, dated Dec eber 10, 1982, describing the actions to be taken to identify and to correct any deficiencies.

Edison management met with the NRC Region III staff January 20, 1983, to present the plans for implementing the actions outlined in the Confirma-tory Action Letter.

If you have questions concerning this matter, please contact Mr. G.M.

Trahey, Assistant Director - Project Quality Assurance.

Very truly yours, i

)

DAW /DF/pn 1 8302150240 830114 PDR ADOCK 05000341 FEB 7 1983 E PDR

L .*

lw l

l*

Mr. James G. Keppler, Regional Achinistrator January 14, 1983 Page 'IWo EF2-61526 cc: Mr. Richard DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Comnission Washington, D.C. 20555 Mr. Bruce Little, Senior Resident Inspector U.S. Nuclear Regulatory Ccunission 6450 North Dixie Highway Newport, Michigan 48166

-